Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
Audit Step: 4.A.1.1 Has a Detailed Systems Design document been prepared and released?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.1.2 Verify that it covers at least the following:
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.1.3 Review system specifications for each application within the system for clarity, completeness, and consistency.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.1.4 Review flow charts, decision tables, or narratives to assess the reasonableness of program logic incorporated in applications.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.2.1 Has the Detailed System Design document been reviewed by the Steering Committee/Sign Off Authorities? Have they signified acceptance? Note any conditional acceptance for follow-up in later stages.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.3.1 Has the data dictionary/directory been updated to contain the detailed system specifications?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.4.1 Has a program and system test plan been developed and released?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.4.2 Verify that it covers at least the following both for program and system testing, and for volume and operational testing:
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.4.3 Compare the information included in the test plan with one of the following standards or guides:
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.5.1 Has the Test Plan document been reviewed by the Steering Committee/Sign Off Authorities?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.6.1 Are all of the items in the User Requirements document being tested? Appropriate tests may include: walk throughs, simulations and prototypes. Where items are not being tested, check that a suitable explanation has been provided and accepted by the Steering Committee/Sign Off Authorities.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.7.1 Do the skills of the staff being employed on the project (as Team Members or Steering Committee/Sign Off Authority members) continue to meet the requirements specified in the Personnel Skills Summary?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.8.1 Has a Steering Committee Meeting Schedule document been prepared and released to all interested parties including EDP and user management?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.8.2 Attend or review the minutes of the Committee meetings and note the following: - EDP and user management representatives attended each meeting, and - meetings are held regularly.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.1 Has a Detailed Design Stage Status document been prepared and released.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.2 Verify that the status document contains at least the following:
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.3 Verify actual resource use in source documents.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.4 Verify that the updated budget and schedule are in keeping with the updated cost/benefit analysis.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.5 Verify the updated cost/benefit analysis against the cost/benefit analysis from the previous stage and from source documents.
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.9.6 Does the updated cost/benefit analysis take into consideration the human resource impact requirements?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.10.1 Has the Detailed Design Stage Status document been reviewed by the Steering Committee/Sign Off Authorities and have they signified an acceptance of it?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.11.1 Has a human resources impact analysis been performed?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.A.11.2 Have the results from the analysis been reviewed by the Steering Committee/Sign Off Authorities?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.B.1.1 Has a Test Plan been prepared and released?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.B.1.2 Verify that it addresses the control requirements outlined in the Processing Control Specifications (See objective 3.B.1).
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.C.1.1 Has a Test Plan been prepared and released?
Y | N | N/A | Comments | XREF |
---|---|---|---|---|
Audit Step: 4.C.1.2 Verify that it addresses the control requirements outlined in the System Management Control Specifications document (see objective 3.C.1).
Y | N | N/A | Comments | XREF |
---|---|---|---|---|