Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

Greening Government Operations (GGO)

Green Building Targets


8.1 As of April 1, 2012, and pursuant to departmental strategic frameworks, new construction and build-to-lease projects, and major renovation projects, will achieve an industry-recognized level of high environmental performance.
Performance Measure RPP DPR
Target Status  
Number of completed new construction, build-to-lease and major renovation projects in the given fiscal year, as per departmental strategic framework. Not available  
Number of completed new construction, build-to-lease and major renovation projects that have achieved an industry-recognized level of high environmental performance in the given fiscal year, as per departmental strategic framework. Not available  
Existence of strategic framework. No  

Strategies / Comments

  1. The Aboriginal Affairs and Northern Development Canada (AANDC) Green Buildings Strategic Framework (GBSF) will be implemented during the first quarter of the 2012-2013 FY.
  2. AANDC is unable to report on the number of new construction, build-to-lease, and major renovation projects that will be subject to the departmental strategic framework prior to the framework's implementation.


8.2 As of April 1, 2012, and pursuant to departmental strategic frameworks, existing crown buildings over 1000m2 will be assessed for environmental performance using an industry-recognized assessment tool.
Performance Measure RPP DPR
Target Status  
Number of buildings over 1000m2, as per departmental strategic framework. Baseline: 13.2 L/100km  
Percentage of buildings over 1000m2 that have been assessed using an industry-recognized assessment tool, as per departmental strategic framework. FY 2011-2012 0%  
FY 2012-2013 50%  
FY 2013-2014 90%  
Existence of strategic framework. No  

Strategies / Comments

  1. The Aboriginal Affairs and Northern Development Canada (AANDC) Green Buildings Strategic Framework (GBSF) will be implemented during the first quarter of the 2012-2013 FY.
  2. AANDC is unable to report on the number of existing buildings over 1000m² owned by AANDC that will be subject to the departmental strategic framework prior to the framework's implementation.


8.3 As of April 1, 2012, and pursuant to departmental strategic frameworks, new lease or lease renewal projects over 1000m2, where the Crown is the major lessee, will be assessed for environmental performance using an industry-recognized assessment tool.
Performance Measure RPP DPR
Target Status  
Number of completed lease and lease renewal projects over 1000m2 in the given fiscal year, as per departmental strategic framework. Not available  
Number of completed lease and lease renewal projects over 1000m2 that were assessed using an industry-recognized assessment tool in the given fiscal year, as per departmental strategic framework. Not available  
Existence of strategic framework. No  

Strategies / Comments

  1. The Aboriginal Affairs and Northern Development Canada (AANDC) Green Buildings Strategic Framework (GBSF) will be implemented during the first quarter of the 2012-2013 FY.
  2. AANDC is unable to report on the number of new lease or lease renewal projects over 1000 that will be subject to the departmental strategic framework prior to the framework's implementation.


8.4 As of April 1, 2012, and pursuant to departmental strategic frameworks, fit-up and refit projects will achieve an industry-recognized level of high environmental performance.
Performance Measure RPP DPR
Target Status  
Number of completed fit-up and refit projects in the given fiscal year, as per departmental strategic framework. Not available  
Number of completed fit-up and refit projects that have achieved an industry-recognized level of high environmental performance in the given fiscal year, as per departmental strategic framework. Not available  
Existence of strategic framework. No  

Strategies / Comments

  1. The Aboriginal Affairs and Northern Development Canada (AANDC) Green Buildings Strategic Framework (GBSF) will be implemented during the first quarter of the 2012-2013 FY.
  2. AANDC is unable to report on the number of fit-up and refit projects that will be subject to the departmental strategic framework prior to the framework's implementation.

Greenhouse Gas Emissions Target


8.5 The federal government will take action now to reduce levels of greenhouse gas emissions from its operations to match the national target of 17% below 2005 by 2020.
Performance Measure RPP DPR
Target Status  
Departmental GHG reduction target: Percentage of absolute reduction in GHG emissions by fiscal year 2020-2021, relative to fiscal year 2005-06. 17% by March 31, 2021  
Departmental GHG emissions in fiscal year 2005-06, in kilotonnes of CO2 equivalent. 0.65  
Departmental GHG emissions in the given fiscal year, in kilotonnes of CO2 equivalent. FY 2011-2012 0.58  
FY 2012-2013    
FY 2013-2014    
FY 2014-2015    
FY 2015-2016    
FY 2016-2017    
FY 2017-2018    
FY 2018-2019    
FY 2019-2020    
FY 2020-2021    
Percent change in departmental GHG emissions from fiscal year 2005-2006 to the end of the given fiscal year. FY 2011-2012 -11.042%  
FY 2012-2013 -11.704%  
FY 2013-2014    
FY 2014-2015    
FY 2015-2016    
FY 2016-2017    
FY 2017-2018    
FY 2018-2019    
FY 2019-2020    
FY 2020-2021 -17%  
Existence of an implementation plan to reduce GHG emissions. Yes  

Strategies / Comments

  1. The AANDC Vehicle Greenhouse Gas Emissions Reduction Strategy was developed and implemented during the 2011-2012 FY.
  2. AANDC's Departmental GHG reduction target was misreported as "23.45% by March 31, 2021" in the department's last RPP for 2011-2012. This target was based on erroneous baseline emissions for 2005-2006 which were corrected and accepted by the Office of Greening Government Operations (OGGO) during 2011, and was expressed relative to the department's actual emissions for 2009-2010 rather than 2005-2006 as required.
  3. This target does not apply to buildings owned by AANDC. Targeted emission sources include department-owned vehicles.
  4. For the purposes of this target, AANDC is treating fuel purchased on "non-specific" fleet credit cards and consumed by vehicle types such as all-terrain vehicles, snowmobiles, materiel handling equipment, marine vessels, heavy trucks, special purpose trucks, and heavy mobile equipment as having been used by normal "on-road" (passenger/light-duty) vehicles. 
  5. The AANDC Vehicle Greenhouse Gas Emissions Reduction Strategy includes: roles and responsibilities, regional GHG reduction targets, potential methods to decrease emissions (i.e. vehicle right-sizing, driver training, up-fitting, etc.), and performance management strategies.
  6. Departmental GHG emissions in kilotonnes of CO2 equivalent stated above have been rounded to two decimal places.

Surplus Electronic and Electrical Equipment Target


8.6 By March 31, 2014, each department will reuse or recycle all surplus electronic and electrical equipment (EEE) in an environmentally sound and secure manner.
Performance Measure RPP DPR
Target Status  
Existence of implementation plan for the disposal of all departmentally-generated EEE. Yes  
Total number of departmental locations with EEE implementation plan fully implemented, expressed as a percentage of all locations, by the end of the given fiscal year. FY 2011-2012 18% (13 locations in the National Capital Region)  
FY 2012-2013 33% (13 locations in the National Capital Region and at least 11 regional locations)  
FY 2013-2014 100% (All departmental locations)  

Strategies / Comments

  1. The AANDC Implementation Plan for Departmental Surplus Electronic and Electrical Equipment (EEE) was developed and implemented during the 2011-2012 FY.
  2. Current definition of departmental locations requiring EEE implementation plans: Operational facilities (72 total), including leased accommodations (63) and department-owned (9) buildings which support departmental operations. Locations do not include staff housing and non-operational real property owned by AANDC for future transfer to First Nations. This definition may be subject to change during the finalization of the department's implementation plan for the disposal of departmentally-generated EEE.
  3. AANDC's Asset Information Management System tracks most departmental surplus EEE directed to disposal mechanisms.

Printing Unit Reduction Target


8.7 By March 31, 2013, each department will achieve an 8:1 average ratio of office employees to printing units. Departments will apply target where building occupancy levels, security considerations, and space configuration allow.
Performance Measure RPP DPR
Target Status  
Ratio of departmental office employees to printing units in fiscal year 2010-11, where building occupancy levels, security considerations and space configuration allow. N/A  
Ratio of departmental office employees to printing units at the end of the given fiscal year, where building occupancy levels, security considerations and space configuration allow. FY 2011-2012 N/A  
FY 2012-2013 N/A  
FY 2013-2014 8:1  

Strategies / Comments

  1. The department's overall ratio of office employees to printing devices during the 2010-2011 FY was approximately 2:1.
  2. Methods for determining the approximate ratio of departmental employees to printing units stated above: regional consultation, information contained in the department's asset information management system, and the TBS Population Affiliation Report.
  3. AANDC anticipates that it will achieve the 8:1 target ratio of office employees to printing devices during the 2013-2014 FY.

Paper Consumption Target


8.8 By March 31, 2014, each department will reduce internal paper consumption per office employee by 20%. Each department will establish a baseline between 2005-2006 and 2011-2012, and applicable scope.
Performance Measure RPP DPR
Target Status  
Number of sheets of internal office paper purchased or consumed per office employee in the baseline year selected, as per departmental scope. 8622 sheets per office employee during 2010-2011  
Cumulative reduction (or increase) in paper consumption, expressed as a percentage, relative to baseline year selected. FY 2011-2012 Not available  
FY 2012-2013 10%
7760 Sheets/employee
 
FY 2013-2014 20%
6898 Sheets/employee
 

Strategies / Comments

  1. This target applies to all AANDC employees and departmental operations.
  2. Method for determining the number of departmental employees: TBS Population Affiliation Report.
  3. AANDC did not establish an internal paper consumption reduction target for the 2011-2012 FY.
  4. AANDC provides regular communications regarding paper consumption and greening operations in the department's weekly "AANDC Express" newsletter.
  5. Method used for determining paper consumption: PWGSC Report on Fiscal Year Standing Offer Paper Purchases – Indian and Northern Affairs Canada – 2010-2011.

Green Meetings Target


8.9 By March 31, 2012, each department will adopt a guide for greening meetings.
Performance Measure RPP DPR
Target Status  
Presence of a green meeting guide. Yes  

Strategies / Comments

  1. The AANDC Green Meetings Guide was developed and implemented during the 2011-2012 FY.
  2. AANDC adopted a guide for greening meetings by adapting the guide developed by Environment Canada, and incorporating best practices established in similar guides prepared by other government departments.
  3. The draft AANDC Green Meetings Guide applies to all types of meetings. The guide includes a basic checklist for all meetings, and additional checklists for larger events.
  4. Roles and responsibilities: DG of Corporate Accounting and Materiel Management is target lead. The Chief Financial Officer and Senior Assistant Deputy Minister of Regional Operations are co-champions for greening departmental operations.

Green Procurement Targets

8.10 As of April 1, 2011, each department will establish at least 3 SMART green procurement targets to reduce environmental impacts.

8.10.1 By March 31, 2014, 100% of copy paper purchases contain a minimum of 30% recycled content and have forest management certification or EcoLogoM or equivalent certification.
Performance Measure RPP DPR
Target Status  
Volume of paper purchases meeting the target relative to total volume of all paper purchases in the given fiscal year <90% (during 2010-2011)  
Progress against measure in the given fiscal year. FY 2011-2012 Not available  
FY 2012-2013 95% (expected)  
FY 2013-2014 100% (expected)  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Refers to specific type of commodity.
  2. Measurable: Information available through Public Works and Government Services Canada Standing Offers and AANDC's financial information system.
  3. Achievable: Forthcoming departmental policy will mandate the use of Public Works and Government Services Canada standing offers for all copy paper purchases during 2012-2013. Target is already partially implemented since most departmental paper purchases utilize PWGSC standing offers and have some recycled content.
  4. Relevant: Paper is a highly visible commodity to employees and provides a constant reminder of the Federal Government's commitment to greening operations. The target also complements departmental efforts on FSDS targets 8.7 and 8.8 for reducing printing devices and paper consumption.
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. AANDC established this target late in the 2011-2012 FY for implementation during 2012-2013, and is therefore unable to report on anticipated progress against the target for 2011-2012.
  2. For reference, 90% of all departmental paper purchases through PWGSC standing offers during 2010-2011 had at least 30% recycled content.
  3. Exclusions include paper used by departmental operations which print maps and paper supplies used with laboratory equipment. Target is restricted to paper used in office machines such as photocopiers and printers.
  4. Isolated locations where local suppliers are unable to provide recycled paper at or above 30% will be exempted from the target.


8.10.2 By March 31, 2014, the average fuel efficiency (in litres per 100 km) of all new light-duty vehicles purchased in the fiscal year by AANDC will be 15% improved over the average light-duty vehicle fleet fuel efficiency (in litres per 100 km) in fiscal year 2010-2011.
Performance Measure RPP DPR
Target Status  
Average light-duty vehicle fleet fuel consumption relative to kilometres travelled in 2010-2011. Baseline: 13.2 L/100km  
Average fuel consumption relative to kilometres travelled of new light-duty vehicles purchased FY 2011-2012 Target not established  
FY 2012-2013 12.1 L/100km  
FY 2013-2014 11.2 L/100km  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Refers to specific type of commodity.
  2. Measurable: Information available in the PWGSC Government Motor Vehicle Ordering Guide and completed AANDC Vehicle Purchase Information and Justification Forms.
  3. Achievable: All departmental vehicle purchases require approval from Headquarters Asset Management, and AANDC is confident that new vehicles purchased to replace existing vehicles will be comparatively efficient. Resources have been identified for target implementation.
  4. Relevant: Vehicle purchases represent a significant proportion of the department's overall purchases of goods. The target also complements departmental efforts on FSDS target 8.5 for reducing greenhouse gas emissions from departmental light-duty vehicles.
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. Scope: All light-duty vehicles available through the PWGSC Government Motor Vehicle Ordering Guide (GMVOG)
  2. Baseline is provided by the Automotive Resources International (ARI) Financial Services Inc. Partnership Review report for Indian and Northern Affairs Canada for the period of April 2010 to March 2011.
  3. Performance indicator: Average fuel efficiency of all new vehicles acquired per year, based on average of manufacturer/GMVOG-stated (not actual) fuel consumption values. Each new vehicle's average fuel efficiency is to be calculated based on the assumption of equal use on city and highway roads (50%/50%).
  4. Expected environmental benefits: Reduced fuel consumption and fuel purchases. Target also supports departmental implementation of FSDS target 8.5.
  5. AANDC established this target during the 2011-2012 fiscal year for implementation during 2012-2013 and 2013-2014.

 

8.10.3 By March 31, 2014, 50% of contracts for professional services will be consistent with environmental criteria identified in the Guideline for Greening Services Procurement.
Performance Measure RPP DPR
Target Status  
Volume of professional services contracts awarded that meet target criteria relative to total volume of contracts for professional services during the 2012-2013 fiscal year. Not available*  
Progress against measure in the given fiscal year. FY 2012-2013 25% (expected)  
FY 2013-2014 50% (expected)  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Target applies to all contracts for professional services, including low-dollar value (LDV) contracts, sole-source contracts, advanced contract award notice (ACAN) procurements, departmental standing offers for services, PWGSC contracts, and call-ups against PWGSC Standing Offer Arrangements (SOAs) and Supply Arrangements (SAs).
  2. Measurable: Inclusion of green procurement criteria in service contracts is tracked in the mandatory AANDC Procurement and Contracting Checklist. Green procurement is also tracked by the department's financial information system
  3. Achievable: During 2010-2011, over 50% of departmental contracts by volume were call-ups and competitive procurement processes. AANDC is confident that it can include environmental considerations in such procurement processes and others.
  4. Relevant: Services constitute the majority of AANDC's procurement expenditures. For reference, over 66% of departmental procurement expenditures were for services during 2010-2011.
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. * AANDC will establish the baseline for this target during the 2012-2013 FY.
  2. Expected environmental benefits: decreased resource consumption due to departmental procurement operations and acquired services, and demonstration of the department's commitment to greening operations to both suppliers, clients and employees.
  3. During the 2012-2013 FY, AANDC will develop and implement tools to support the inclusion of environmental considerations in service contracts.

8.11 As of April 1, 2011, each department will establish SMART targets for training, employee performance evaluations, and management processes and controls, as they pertain to procurement decision-making.


Training for Select Employees.

As of March 31, 2011, 75% of procurement and materiel management staff will be trained in Green Procurement.
Performance Measure RPP DPR
Target Status  
Number of procurement and materiel management staff having completed the Canada School of Public Service course C215 relative to the total number of procurement and materiel management staff in the Department for the given year. 14%
(in 2010-11)
 
Progress against measure in the given fiscal year. >75%  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Defined achievement level of 75% and type of employee.
  2. Measurable: Information available from the Canada School of Public Service (CSPS) and in-house HR tracking systems.
  3. Achievable: CSPS Course C215 can be completed in half a day.
  4. Relevant: Targets all relevant employees.
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. Methodology: Employee positions encompassing Procurement-related duties are defined as procurement functional specialists, materiel management functional specialists, real property functional specialists, managers of procurement, materiel management and/or real property functional specialists, and acquisition cardholders.
  2. In-house training used: None – CSPS Course C215 only.
  3. Reporting requirements: Collect data from CSPS annually. AANDC Procurement and Materiel Management maintains a list of training courses completed by its employees.
  4. Plans for engagement: To be addressed through the employee performance management process, and discussed by AANDC's Materiel Management (or "MATMAN") working group.


Employee performance evaluations for managers and functional heads of procurement and materiel management.

By March 31, 2014 15% of performance evaluations for Managers and functional heads of procurement and materiel management will incorporate environmental considerations.
Performance Measure RPP DPR
Target Status  
Number of performance evaluations of managers and functional heads of procurement and materiel management that incorporate environmental considerations relative to total number of performance evaluations of managers and functional heads of procurement and materiel management. 4%
(in 2010-2011)
 
Progress against measure in the given fiscal year. <15% (expected)  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Defined achievement level of 15% and types of employees. 15% represents the proportion of AANDC managers and functional heads of procurement and materiel management located in the National Capital Region, and with responsibility to lead Green Procurement Implementation.
  2. Measurable: Information available from in-house HR tracking systems.
  3. Achievable: Target only applies to employees with responsibility for green procurement implementation and performance.
  4. Relevant: Targets all relevant employees (managers and functional heads of procurement and materiel management in the National Capital Region / AANDC Headquarters).
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. Methodology: Managers and functional heads of procurement and materiel management are defined as individuals with responsibility to manage procurement and materiel management activities. Detailed criteria have been established to further define procurement and materiel management activities for the purposes of this target.
  2. Plans for engagement: Inclusion in future Employee Performance Agreements.


Management processes and controls.

By March 31, 2014, AANDC will ensure that all departmental management processes and controls relating to procurement support green procurement, as appropriate
Performance Measure RPP DPR
Target Status  
Number of departmental procurement processes and controls which support green procurement relative to the number of departmental procurement processes and controls which remain to be updated to include support for green procurement. Not available  
Progress against measure in the given fiscal year. Not available  

Strategies / Comments

Why This Self Selected Target is SMART:

  1. Specific: Target applies to all departmental management processes and controls which relate to procurement.
  2. Measurable: During the 2012-2013 FY, AANDC will develop an inventory of all current departmental management processes and controls which relate to procurement.
  3. Achievable: AANDC recently completed a review of all departmental procurement policies, and has resources dedicated to procurement policy and the implementation of this target.
  4. Relevant: AANDC management processes and controls which relate procurement do not all support green procurement at present.
  5. Time-bound: Date established for target implementation and completion.

Other Reporting Considerations:

  1. Methodology: Analysis of departmental management processes and controls relating to procurement to identify those that should be updated to include environmental considerations.

Reporting on the Purchases of Offset Credits


Mandatory reporting on the purchase of greenhouse gas emissions offset credits, as per the Policy Framework for Offsetting Greenhouse Gas Emissions from Major International Events, should be reported here.
Performance Measure RPP DPR
Quantity of emissions offset in the given fiscal year. Not available