Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
The following table provides a list of all upcoming internal audits pertaining to the department's work over the next three fiscal years.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Agricultural Flexibility | Transfer Payment | In progress | April 2010 |
Slaughter Improvement | Transfer Payment | In progress | April 2010 |
Hog Farm Transition | Transfer Payment | In progress | April 2010 |
Hog Industry Loan Loss Reserve Program Audit | Transfer Payment | In progress | April 2010 |
Grants and Contributions Horizontal Audit | Transfer Payment | In progress | June 2010 |
Information Privacy | Information Management | In progress | June 2010 |
Grants and Contributions Delivery System | System Under Development | In progress | June 2010 |
AgriInsurance | Transfer Payment | Planned | March 2011 |
AgriStability | Transfer Payment Follow-up | Planned | March 2011 |
AgriOpportunities | Transfer Payment | Planned | March 2011 |
Payroll | Corporate | Planned | March 2011 |
Budgetary Control Process | Corporate | Planned | March 2011 |
Information Management | Information Management | Planned | March 2011 |
Procurement and Contracting Transactions | Corporate | Planned | March 2011 |
AgriMarketing | Transfer Payment | Planned | March 2012 |
ecoAgriculture Biofuels Capital Initiative | Transfer Payment | Planned | March 2012 |
Grants and Contributions Horizontal Audit | Transfer Payment | In progress | March 2012 |
Risk Management | Corporate | Planned | March 2012 |
Values and Ethics Framework | Corporate | Planned | March 2012 |
Human Resources Planning | Corporate | Planned | March 2012 |
Sampling and Gating (FAA, s. 33) | Corporate | Planned | March 2012 |
Business Continuity Planning | Corporate | Planned | March 2012 |
IT Asset Management | Information Management | Planned | March 2012 |
Management of MOUs Horizontal Audit | Corporate | Planned | March 2012 |
5. Electronic Link to Internal Audit and Evaluation Plan: Not Available
The following table provides a list of all upcoming evaluations pertaining to the department's work over the next three fiscal years.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
2010-11 | |||
Disaster Response | Transfer Payment | Planned | March 2011 |
Private Sector Risk Management Partnership | Transfer Payment | Planned | March 2011 |
Advance Payments Program / Price Pooling Program | Transfer Payment | Planned | March 2011 |
Disease Responses • Plum Pox Eradication • Control of Disease in Hogs • Specified Risk Materials |
Transfer Payment | Planned | March 2011 |
Community Pastures | Operating Expenditure | Planned | March 2011 |
Collaborative Research and Development | Transfer Payment | Planned | March 2011 |
Innovative and Sustainable Agricultural Production and Products | Transfer Payment | Planned | March 2011 |
2011-12 | |||
Income Stability Tools | Transfer Payment | Planned | March 2012 |
AgriInsurance | Transfer Payment | Planned | March 2012 |
Insolvency Dispute Resolution | Statutory | Planned | March 2012 |
Food Safety Continuum
|
Operating Expenditure /Transfer Payment | Planned | March 2012 |
Science and Technology Activities in Support of the Food System | Operating Expenditure | Planned | March 2012 |
Agri-Innovation and Commercialization (Growing Forward Initiatives in Support of Science) | Operating Expenditure | Planned | March 2012 |
Supporting Rural Communities and the Development of Co-operatives | Transfer Payment | Planned | March 2012 |
2012-13 | |||
Supporting Adaptation within the Agricultural Sector (Canadian Agricultural Adaptation Program) | Transfer Payment | Planned | March 2013 |
Trade Negotiations and Market Access | Transfer Payment | Planned | March 2013 |
Market Growth | Operating Expenditure /Transfer Payment | Planned | March 2013 |
Sector Competitiveness | Operating Expenditure /Transfer Payment | Planned | March 2013 |
Agri-Environmental Applications | Operating Expenditure | Planned | March 2013 |
Agri-Environmental Sustainability Assessment | Operating Expenditure | Planned | March 2013 |
Agri-Environmental Science | Operating Expenditure | Planned | March 2013 |
Meta-Evaluation of Cost-Shared Programming in support of Competitiveness and Innovation | Transfer Payment | Planned | March 2013 |
Meta-Evaluation of Cost-Shared Programming in support of On Farm Action (Society's Priorities) | Transfer Payment | Planned | March 2013 |
Meta-Evaluation of Cost-Shared Programming in support of Proactively Managed Risk | Transfer Payment | Planned | March 2013 |
Note: Planned evaluations are subject to change as a result of the annual review of the Departmental Evaluation Plan. The department is committed to implementing the Evaluation Policy requirement to evaluate 100 per cent of direct spending over a five-year period.
Electronic link to evaluation plan: Not available.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Risk Management Framework – Effectiveness of Corporate Risk Management | Assurance | Planned | 2010-2011 |
People Management – Employment and Workplace Practices and Labour Relations | Assurance | Planned | 2010-2011 |
Ethical Leadership – Agency-wide Integrity and Ethics | Assurance | Planned | 2010-2011 |
Financial Management Control – Monitoring | Assurance | Planned | 2010-2011 |
Information Technology – Leadership and Accountability for Organizational Outcomes | Assurance | Planned | 2010-2011 |
Policy and Programs – Quality of Analysis | Assurance | Planned | 2010-2011 |
Information Technology – Integration into Organizational Governance | Assurance | Planned | 2010-2011 |
Corporate Performance Framework | Assurance | Planned | 2010-2011 |
Due Diligence – Atlantic Innovation Fund | Assurance | Planned | 2010-2011 |
Follow-up Audits – BDP and CED – Community Investment | Follow-up | Planned | 2010-2011 |
Financial Management Control – Non-Commercial Projects | Assurance | Planned | 2010-2012 |
Information Technology – Planning and Added Value | Assurance | Planned | 2010-2012 |
Planning – Effectiveness of Asset Management | Assurance | Planned | 2010-2012 |
Governance – Corporate Business Planning | Assurance | Planned | 2010-2012 |
Governance – Organizational Alignment and Accountability | Assurance | Planned | 2010-2012 |
Financial Management Control – Compliance with the FAA in Operations | Assurance | Planned | 2010-2012 |
Governance – Effectiveness of Project Management | Assurance | Planned | 2010-2012 |
Financial Management Control – Stewardship of Receivables | Assurance | Planned | 2010-2012 |
Portfolio Coordination – External Portfolio Management | Assurance | Planned | 2010-2012 |
Financial Management Control – Adequacy of Financial Reporting | Assurance | Planned | 2010-2013 |
People Management – Performance and Productivity | Assurance | Planned | 2010-2013 |
People Management – Occupational Health and Safety | Assurance | Planned | 2010-2013 |
People Management – Diversity | Assurance | Planned | 2010-2013 |
Citizen-focused Service – Communications and Marketing | Assurance | Planned | 2010-2013 |
Citizen-focused Service – Meeting Service Standards | Assurance | Planned | 2010-2013 |
Change Planning – Learning and Change Management | Assurance | Planned | 2010-2013 |
Governance – Effectiveness of Procurement | Assurance | Planned | 2010-2013 |
Security Program – Adequacy of Security and Business Continuity Management | Assurance | Planned | 2010-2013 |
Electronic Link to Internal Audit Plan: The electronic link to the internal audit plan is not available at this time. The annual audit planning process is completed during the fourth quarter, and the audit plan for 2010-2013 will be available following the President's approval.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
FY 2010-2011 | |||
Financing Continuum Evaluation | Program sub-activity including components of the Business Development Program and Tourism commercial | Ongoing | June 2010 |
Trade and Investment Evaluation | Program sub-activity including components of the Business Development Program, Atlantic Trade and Investment Partnership, and the International Business Development Program | Ongoing | June 2010 |
Entrepreneurship and Business Skills Development Evaluation | Program sub-activity including components of the Business Development Program, the Women in Business Initiative and the Young Entrepreneur Development Initiative | Ongoing | June 2010 |
Policy, Advocacy and Coordination Evaluation | Program sub-activity including components of the Business Development Program | Planned | June 2011 |
Public Service Renewal Initiative Evaluation | Internal services | Planned | March 2011 |
FY 2011-2012 | |||
Business Skills Development Meta Evaluation | Components of the Business Development Program | Planned | TBD |
Tourism Meta Evaluation | Components of the Business Development Program | Planned | TBD |
FY 2012-2013 | |||
Community Investment and Community Mobilization Evaluation | Program sub-activity including components of the Business Development Program and the Innovation Community Fund | Planned | TBD |
Community-based Business Development Evaluation | Program sub-activity including components of the Business Development Program and the Community Futures Program | Planned | TBD |
Electronic link to evaluation plan:
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Financial Management Control Framework | Assurance | In progress | 2010 |
Free and Secure Trade program | Pre-audit Survey | In progress | 2010 |
CBSA / Citizenship and Immigration Canada Memorandum of Understanding | Assurance | In progress | 2010 |
Form K84 (Process and Accounting) | Assurance | In progress | 2010 |
Postal Operations | Pre-audit Survey | In progress | 2010 |
Economic Action Plan | Pre-audit Survey | In progress | 2010 |
Tax revenues source transactions – Phase I | Pre-audit Survey | Planned | 2010 |
Duties relief programs – Drawback refunds | Assurance | Planned | 2010 |
Harmonized Risk Scoring / Advance Trade Data | Assurance | Planned | 2010 |
Advance Passenger Information / Passenger Name Record data from airlines | Assurance | Planned | 2010 |
eManifest – Phase II | Assurance | Planned | 2010 |
Accelerated Commercial Release Operations Support System Controls | Pre-audit Survey | Planned | 2010 |
Management of Information Technology Security | Assurance | Planned | 2010 |
Laboratory services | Assurance | Planned | 2010 |
Controls on seized identity documents (Immigration and Refugee Protection Act) | Pre-audit Survey | Planned | 2010 |
Arming Initiative (change management strategy) | Assurance | Planned | 2011 |
Compliance verification programs | Assurance | Planned | 2011 |
Management of Government Information Holdings | Assurance | Planned | 2011 |
Process monitoring framework | Assurance | Planned | 2011 |
Tax revenues source transactions – Phase II | Assurance | Planned | 2011 |
IT systems – Biometrics | Assurance | Planned | 2011 |
Management of overtime | Assurance | Planned | 2011 |
Process to share intelligence information internally | Assurance | Planned | 2011 |
Training and development | Assurance | Planned | 2011 |
Year-end cash cut-off procedures 2009-10 | Assurance | Planned | 2011 |
Accounts receivable | Assurance | Planned | 2011 |
Container Security Initiative | Assurance | Planned | 2011 |
Procurement service standards | Assurance | Planned | 2011 |
Security Management Framework | Assurance | Planned | 2011 |
*The Canada Border Services Agency has established timelines for audit report delivery up until the first quarter of 2011-12. Timelines for audit report delivery beyond that date will be established in 2010-11.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Sufferance and bonded warehouse programs | Program | In progress | 2010 |
Security Certificates initiative (CBSA is participating in this evaluation, which is led by Public Safety Canada) | Initiative | In progress | 2010 |
Investigations Program (under the Immigration and Refugee Protection Act) | Program | In progress | 2010 |
Anti-Money Laundering and Anti-Terrorist Financing (CBSA is participating in this evaluation, which is led by the Department of Finance) | Program | In progress | 2010 |
Container Security Initiative | Initiative | In progress | 2010 |
Integrated Proceeds of Crime (CBSA is participating in this evaluation, which is led by the Royal Canadian Mounted Police) | Program | Planned | 2010 |
Detentions and removals | Program | In progress | 2010 |
Information Technology infrastructure – Shared services (including applications and end-user environment) | Service | In progress | 2010 |
People processing (marine mode) | Program | In progress | 2010 |
Temporary Foreign Worker Program (CBSA is participating in this evaluation, which is led by Human Resources and Skills Development Canada and Citizenship and Immigration Canada) | Program | In progress | 2011 |
Partners in Protection | Program | Planned | 2011 |
Western Hemisphere Travel Initiative | Initiative | Planned | 2011 |
eManifest | Program | Planned | 2011 |
2010 Olympics (CBSA is participating in this evaluation, which is led by the Royal Canadian Mounted Police) | Program | Planned | 2011 |
A. All upcoming Internal Audits over the next three fiscal years
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
IT Asset Management Horizontal Audit Conducted by the Office of the Comptroller General in Small Departments and Agencies |
Assurance on measures to manage IT asset inventories, including software licences | In progress, examination completed in December 2009 | Final Report due April 2010 |
Electronic Link to Internal Audit and Evaluation Plan: http://www.tbs-sct.gc.ca/ia-vi/docs/plans-eng.asp
An annual review and update on planned audit engagements may result in modifications to audits to be conducted in 2010-2011, 2011-2012 and 2012-2013.
All completed audit reports are posted at the following link:
http://www.cra-arc.gc.ca/gncy/ntrnl/menu-eng.html
Electronic Link to Internal Audit Plan: http://www.cra-arc.gc.ca/gncy/ntrnl/menu-eng.html
Electronic link to evaluation plan: http://www.cra-arc.gc.ca/gncy/ntrnl/menu-eng.html
All upcoming Internal Audits over the next three fiscal years
The list that follows represent the audit engagements which have begun during fiscal year 2009-10 and will be completed during 2010-11 and the audit engagements which are planned to be performed over the next three fiscal years. These audit engagements are part of the most recent Canada School of Public Service Multi-year Risk-Based Audit Plan 2009-2010 to 2011-2012 (approved in June 2009 by the President of the Canada School on recommendation by the Canada School's Departmental Audit Committee). The next review and update of the Canada School of Public Service Multi-year Risk-Based Audit Plan 2010-2011 to 2012-2013 is planned to be performed during the first quarter of 2010-11 which may result in modifications to the audit engagements to be conducted over the next three fiscal years as listed below.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
System Under Development Audit of the Integrated Learner Management System (ILMS) | System Under Development — Financial & Information Technology — Internal Services | In progress | First Quarter of 2010–11 |
Audit of Compensation for Certain Non–Indeterminate Employees | Assurance — Financial — Compliance — Internal Services | In progress | First Quarter of 2010–11 |
Audit of Revenue Management* | Assurance — Financial — Compliance — Internal Services | Planned | To be determined |
Leave and Overtime Audit | Assurance – Financial & Compliance – Internal Services | Planned | Last Quarter of 2010–11 |
Audit of Computer Controls over Financial Reporting | Assurance — Financial — Information Technology — Internal Services | Planned | Last Quarter of 2010–11 |
Travel and Hospitality Audit | Assurance — Financial — Compliance — Internal Services | Planned | Last Quarter of 2010–11 |
Corporate Risk Profile Audit | Assurance — Risk Management — Internal Services | Planned | Last Quarter of 2010–11 |
Audit of the Orientation to the Public Service Program | Assurance — Performance — Program | Planned | Last Quarter of 2010–11 |
Human Resources Audit | Assurance — Human Resources & Compliance | Planned | Last Quarter of 2011–12 |
Marketing and Promotional Activities Audit | Assurance — Human Resources & Compliance | Planned | Last Quarter of 2011–12 |
Corporate Information Decision–Making Framework Audit | Assurance — Information Management | Planned | Last Quarter of 2011–12 |
Audit of the Advanced Leadership Program | Assurance — Program | Planned | Last Quarter of 2011–12 |
*This audit engagement had been planned to be performed during fiscal year 2009–10 however, we have indications that it might be deferred to a subsequent year which will be approved by the Canada School's Departmental Audit Committee.
All upcoming Evaluations over the next three fiscal years
Below is a list of evaluations that may be conducted by the Canada School of Public Service's Evaluation Division over the next three years 1.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Orientation to Level (ADM, DM) Authority Delegation (Supervisor, EX 1,2,3) – Formative Evaluation of the Authority Delegation Training Courses | Other | In Progress | October 2009 |
Online Collaborative Technology Program (Communities of Practice) | Other | In Progress | April 2010 |
Procurement, Material Management and Real Property Functional Community | Other | In Progress | June 2010 |
Innovative Public Management Research Fund | Transfer Payment |
Planned | March 2011 |
Advanced Leadership Program | Other | Planned | March 2011 |
Leadership Across Borders: A Four Country Program | Other | Planned | March 2011 |
Direxion | Other | Planned | March 2011 |
Living Leadership: The Executive Excellence Program | Other | Planned | March 2012 |
Change Management Services | Other | Planned | March 2012 |
Broadening Access to Canadian Universities | Transfer Payment |
Planned | March 2013 |
iLeadership | Other | Planned | March 2013 |
New Official Languages Delivery Model | Other | Planned | March 2013 |
1 Please note that consultation on the Canada School Evaluation Plan occurs on a yearly basis. Therefore the list of evaluations appearing herein is subject to change.
($ Thousands) | Forecast Revenue 2009-10 |
Planned Revenue 2010-11 |
Planned Revenue 2011-12 |
Planned Revenue 2012-13 |
---|---|---|---|---|
Occupational health and safety information development, delivery services and tripartite collaboration | 3,770 | 4,300 | 4,300 | 4,300 |
Total Credited to the Vote | 3,770 | 4,300 | 4,300 | 4,300 |
Upcoming Internal Audits over the Next Three Fiscal Years
No internal audits are planned over the next three fiscal years. The Agency works closely with the Office of the Comptroller General (OCG) of the Treasury Board Secretariat of Canada in the conduct of horizontal audits.
All Upcoming Evaluations over the Next Three Fiscal Years
No evaluations are planned over the next three fiscal years.
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Animal health | Performance Audit | In progress | June 2010 |
Plant protection | Performance Audit | In progress | September 2010 |
Financial control framework | Financial Audit | In progress | June 2010 |
Export certification - Food | Performance Audit | In progress | June 2010 |
Capital planning and asset management | Financial Audit | In progress | March 2010 |
Revenue management | Financial Audit | In progress | June 2010 |
Enforcement and Investigation Services | Performance Audit | In progress | March 2010 |
Inspection – Meat | Performance Audit | In progress | September 2010 |
Acquisition cards | Financial Audit | In Progress | March 2010 |
Inspection – Fish | Performance Audit | Planned 2010-11 | Undetermined |
Inspection - Non- registered | Performance Audit | Planned 2010-11 | Undetermined |
Enhanced BSE programming | Performance Audit | Planned 2010-11 | Undetermined |
Plant protection emergency response | Performance Audit | Planned 2010-11 | Undetermined |
Seed program and plant breeders rights | Performance Audit | Planned 2010-11 | Undetermined |
Export certification – Animal | Performance Audit | Planned 2010-11 | Undetermined |
Access to Information Privacy | Performance Audit | Planned 2010-11 | Undetermined |
Accounts payable | Financial Audit | Planned 2010-11 | Undetermined |
Business continuity plan (BCP) | Performance Audit | Planned 2010-11 | Undetermined |
Salaries and employee benefits | Performance Audit | Planned 2010-11 | Undetermined |
Laboratory management | Performance Audit | Planned 2010-11 | Undetermined |
Inspection – Canadian agricultural products | Performance Audit | Planned 2011-12 | Undetermined |
Animal health – Zoonotics | Performance Audit | Planned 2011-12 | Undetermined |
Food safety recalls and emergency response | Performance Audit | Planned 2011-12 | Undetermined |
Animal health emergency response | Performance Audit | Planned 2011-12 | Undetermined |
Aquatic animal health | Performance Audit | Planned 2011-12 | Undetermined |
Animal feed | Performance Audit | Planned 2011-12 | Undetermined |
Enhanced surveillance and early detection | Performance Audit | Planned 2011-12 | Undetermined |
Export certification – Plant | Performance Audit | Planned 2011-12 | Undetermined |
Contracting and procurement | Financial Audit | Planned 2011-12 | Undetermined |
Expenditure management | Financial Audit | Planned 2011-12 | Undetermined |
Financial management system | Financial Audit | Planned 2011-12 | Undetermined |
Transfer payments | Financial Audit | Planned 2011-12 | Undetermined |
IM/IT | IM/IT Audit | Planned 2011-12 | Undetermined |
Travel and hospitality | Financial Audit | Planned 2011-12 | Undetermined |
Human resources | Financial Audit | Planned 2011-12 | Undetermined |
21This planned work may change based on possible/pending revisions to planned work based on the annual planning process.
Electronic link to audit plan: Not available
Link to audit reports: http://www.inspection.gc.ca/english/agen/eval/evale.shtml
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Evaluation of CFIA's Food Labelling Activities | Program initiative | Planned | December 2010 |
Evaluation of the Food Vulnerability Assessment Capacity-Building Project (FVACBP) of the Security and Prosperity Partnership (SPP) of the North America Initiative | Program initiative | Planned | October 2010 |
Evaluation of the Vancouver 2010 Olympic and Paralympic Winter Games (CFIA component) | Program initiative | Planned | September 2010 |
Interdepartmental Evaluation of the Vancouver 2010 Olympic and Paralympic Winter Games (Department of Canadian Heritage lead) | Horizontal initiative | Planned | October 2010 |
Evaluation of CFIA's Imported Food Activities | Program initiative | Planned | December 2010 |
Evaluation of the Continuing a Comprehensive Strategy for Managing BSE in Canada, 5-Year Funding (mid-term) | Program initiative | Planned | March 2011 |
Evaluation of the Continuing a Comprehensive Strategy for Managing BSE in Canada, 5-Year Funding | Program initiative | Planned | 2012-2013 |
Evaluation of the Food and Consumer Safety Action Plan (CFIA component) | Program initiative | Planned | 2012-2013 |
Interdepartmental Evaluation of the Food and Consumer Safety Action Plan (Health Canada lead Department) |
Horizontal initiative | Planned | 2012-2013 |
Electronic link to evaluation plan: Not available
Link to evaluation reports: http://www.inspection.gc.ca/english/agen/eval/evale.shtml
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
See note | TBD | See note | TBD |
Note: The CGC recently appointed a Chief Audit Executive (CAE), whose mandate includes establishing an internal audit function in accordance with Treasury Board's Internal Audit Policy. The CAE is developing a Risk-based Audit Plan to commence activity in fiscal year 2010-2011. Once completed and approved, the Internal Audit Plan will be available on the CGC's website.
Electronic link to internal audit plan: Once completed and approved, the Internal Audit Plan will be available on the CGC's website.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
See note | TBD | See note | TBD |
Note: The CGC recently appointed a Chief Audit Executive (CAE) who, in addition to Internal Audit, will direct the Evaluation activities. The CGC is currently evaluating its requirements and expectations as a result of the revised Evaluation Policy effective April 1, 2009. The CAE will develop a risk-based Evaluation Plan in accordance with the Policy and the needs of the CGC. Once completed, the Plan will be posted on the CGC's website.
Electronic link to evaluation plan: Once completed, the Plan will be posted on the CGC's website.
A. All upcoming Internal Audits over the next three fiscal years
This internal audit list is based on the present May 2009 approved 2009-2010 to 2013-2014 risk-based, rolling multi-year audit plan. The plan is revised annually based on departmental needs and emerging priorities. As such, the content of this list could evolve and be subject to change.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Sport Canada Branch |
Internal Audit |
In progress |
2010 |
Payroll, Expenses, Leave and Employee Benefits (Stewardship) (Carry over) |
Internal Audit |
In progress |
2010 |
Official Languages Secretariat |
Internal Audit |
In progress |
2010 |
Ceremonies and Events, Vancouver 2010 |
Internal Audit |
In Progress |
2010 |
Grants and Contributions / Core Controls Phase II |
Horizontal Audit |
Planned |
2010 |
IT Security |
Internal Audit |
Planned |
2010 |
Financial Statements - Major Accounts |
Internal Audit |
Planned |
2010 |
Cultural Industries Branch |
Internal Audit |
Planned |
2011 |
Citizen Participation Branch |
Internal Audit |
Planned |
2011 |
Planning & Intergovernmental Affairs Branch |
Internal Audit |
Planned |
2011 |
Canada's Participation in 2010 Shanghai Program |
Internal Audit: Transfer Payment |
Planned |
2011 |
Lieutenant Governors' Program |
Internal Audit: Transfer Payment |
Planned |
2011 |
Staffing Process |
Horizontal Audit |
Planned |
2011 |
Safety, Security, and Facilities Management Directorate |
Internal Audit |
Planned |
2011 |
Performance Management Systems |
Horizontal Audit |
Planned |
2011 |
Financial Statements - Major Accounts |
Internal Audit |
Planned |
2011 |
IM/IT Strategic Planning Directorate |
Internal Audit |
Planned |
2011 |
Arts Policy Branch |
Internal Audit |
Planned |
2012 |
Heritage Policies and Programs Branch |
Internal Audit |
Planned |
2012 |
International Affairs Branch |
Internal Audit |
Planned |
2012 |
E-Services Branch |
Internal Audit |
Planned |
2012 |
Strategic Policy Planning and Research Branch |
Internal Audit |
Planned |
2012 |
Recruitment |
Horizontal Audit |
Planned |
2012 |
Succession Planning Process |
Horizontal Audit |
Planned |
2012 |
Audited Financial Statements - Major Accounts |
Internal Audit |
Planned |
2012 |
IM/IT Governance & Accountability Directorate |
Internal Audit |
Planned |
2012 |
Governance |
Follow-up Audit |
Planned |
2012 |
Canada Periodical Fund |
Internal Audit: Transfer Payment |
Planned |
2013 |
Canada Media Fund |
Internal Audit: Transfer Payment |
Planned |
2013 |
Strategic Policy and Management and Francophone Secretariat Branch |
Internal Audit |
Planned |
2013 |
Canada Heritage Information Network (CHIN) |
Internal Audit |
Planned |
2013 |
TV5 |
Internal Audit: Transfer Payment |
Planned |
2013 |
Management, Regional and Correspondence Services Branch |
Internal Audit |
Planned |
2013 |
Financial Management Branch |
Internal Audit |
Planned |
2013 |
Business Continuity Planning and Emergency Preparedness |
Horizontal Audit |
Planned |
2013 |
Audited Financial Statements - Major Accounts |
Internal Audit |
Planned |
2013 |
Records Management |
Horizontal Audit |
Planned |
2013 |
This evaluation list is based on the present July 2009 approved 2009-2010 to 2013-2014 risk-based, rolling multi-year evaluation plan. The plan is revised annually based on departmental needs and emerging priorities. As such, the content of this list could evolve and be subject to change.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Aboriginal Peoples' Program (incl. Aboriginal Communities; Aboriginal Living Cultures and YES) | Summative Evaluation | In progress | 2010 |
PCH Communications Function and Communications Policy | Summative Evaluation | In progress | 2010 |
Canada Travelling Exhibitions Indemnification Program | Summative Evaluation | In progress | 2010 |
Katimavik Program | Summative Evaluation | In progress | 2010 |
Exchanges Canada | Summative Evaluation | In progress | 2010 |
Canadian Studies Program | Summative Evaluation | In progress | 2010 |
2010 Olympic & Paralympic Winter Games Federal Secretariat | Summative Evaluation | In progress | 2010 |
Sports Canada (incl. Sport Support Program; Hosting Program; Athlete Assistance Program; and International Sports) | Summative Evaluation | In progress | 2010 |
Arts, Culture and Diversity Program | Summative Evaluation | In progress | 2010 |
Human Rights Program | Summative Evaluation | In progress | 2010 |
Shanghai 2010 Exposition | Summative Evaluation | In progress | 2011 |
Canadian Feature Film Policy | Summative Evaluation | In progress | 2011 |
Canadian Conservation Institute | Summative Evaluation | In progress | 2011 |
Fathers of Confederation Building Trust | Summative Evaluation | In progress | 2012 |
Broadcasting Policy | Summative Evaluation | Planned | 2012 |
Copyright Policy | Summative Evaluation | Planned | 2012 |
UNESCO Convention on the Protection and Promotion of the Diversity of Cultural Expressions | Summative Evaluation | Planned | 2012 |
Building Communities Through Arts and Heritage | Summative Evaluation | Planned | 2012 |
Celebrations and Commemoration Program | Summative Evaluation | Planned | 2013 |
State Ceremonial and Protocol | Summative Evaluation | Planned | 2013 |
National Arts Training Contribution Program | Summative Evaluation | Planned | 2013 |
International Expositions | Summative Evaluation | Planned | 2013 |
TV5 | Summative Evaluation | Planned | 2013 |
Canadian Film or Video Production Tax Credit | Summative Evaluation | Planned | 2013 |
Canada Music Fund | Summative Evaluation | Planned | 2013 |
Book Publishing Industry Development Program | Summative Evaluation | Planned | 2013 |
Canadian Heritage Information Network | Summative Evaluation | Planned | 2013 |
Arts Presentation Canada | Summative Evaluation | Planned | 2013/14 |
Cultural Spaces Canada | Summative Evaluation | Planned | 2013/14 |
Canadian Arts and Heritage Sustainability Program | Summative Evaluation | Planned | 2013/14 |
Official Languages Support Programs (incl. Development of O/L Communities Program; Enhancement of O/L Program, and Young Canada Works YES) | Summative Evaluation | Planned | 2013/14 |
Official Languages Roadmap | Summative Evaluation | Planned | 2013/14 |
Electronic Link to Internal Audit and Evaluation Plan:
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Evaluation of the Alternative Dispute Resolution Services | A-base | In progress | June 2010 |
Electronic link to evaluation plan: There is no link available to the evaluation plan.
The audits are contained in the Risk Assessment and Five-Year Internal Audit Plan 2007-2012 approved by the CIHR Governing Council in June 2007. In accordance with Treasury Board policy, the CIHR Chief Audit Executive refreshes the Risk Assessment yearly in order to produce the CIHR Annual Internal Audit Plan. The audits listed below may be modified, replaced, or deleted to reflect the updated risk assessment.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
2010-11 | |||
Audit of Adequacy and Effectiveness of IM/IT Security | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2011 |
Audit of Compliance with Security and Occupational Safety Policy and Standards | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2011 |
Audit of Compliance with Access to Information and Privacy (ATIP) Acts, Regulations, Policies, and Guidelines | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2011 |
Follow-Up Audit of Travel and Hospitality Expenses – Staff and Non-Staff | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2011 |
2011-12 | |||
Audit of Effectiveness and Efficiency of the Non-Financial Administration of the Research Related Activity (Research Resources and Collaboration) Program | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2012 |
Follow-Up Audit of Conflict of Interest - Audit of Compliance with Ethics and Values Policies and Standards | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2012 |
Follow-Up Audit of Records and Information Management | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2012 |
Follow-Up Audit of Compliance with Official Languages (OL) Act and Policy | Assurance audit of Operations | In approved 5-Year Plan | March 31, 2012 |
2012-13 | |||
The current 5-Year Internal Audit Plan spans the period 2007-2012. The next 5-Year Internal Audit Plan for the period 2012-2017 will be ready in 2011-2012. |
CIHR Evaluation Schedule 2009/10 – 2013/14
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Open Research Grant Program | Grants & Contributions | Carried out annually | 2009-10 2011-12 2012-13 |
Randomized Controlled Trials Program | Grants & Contributions | In progress | 2010-11 |
Team Grant Programs | Grants & Contributions | In progress | 2010-11 |
Canada Research Chairs Grant Program | Grants & Contributions | In progress | 2010-11 |
Pandemic Preparedness Research Initiative | Grants & Contributions | In progress | 2009-10 |
Commercialization Funding Programs | Grants & Contributions | delayed | TBD |
Strategic Initiatives Program | Grants & Contributions | In progress | 2010-11 |
Salary Support Programs | Grants & Contributions | In planning | 2010-11 |
Expensive Drugs for Rare Diseases Research Initiative | Grants & Contributions | Not begun | 2011-12 |
Partnership Programs | Grants & Contributions | Not begun | 2011-12 |
Knowledge Translation Program | Grants & Contributions | Not begun | 2012-13 |
HIV/AIDS Research Initiative | Grants & Contributions | Not begun | 2011-12 |
National Anti-Drug Strategy Treatment Research Initiative | Grants & Contributions | Not begun | 2012-13 |
Training Support Programs | Grants & Contributions | Not begun | 2013-14 |
Networks of Centres of Excellence Program | Grants & Contributions | Not begun | 2012-13 |
Institute Support Grants | Grants & Contributions | Not begun | 2013-14 |
Ethics Programs | Grants & Contributions | Not begun | 2013-14 |
Canada Graduate Scholarships Program | Grants & Contributions | Not begun | 2012-13 |
Evaluation plan is not yet available electronically.
A. All upcoming Internal Audits over the next three fiscal years
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
IT Asset Management | Horizontal | Ongoing | Spring 2010 |
Information Security | Horizontal | Planned | Fall 2010 |
Business Planning | Horizontal | Planned | Spring 2011 |
5. Electronic Link to Internal Audit and Evaluation Plan:
Being a micro-agency, CICS doesn't conduct its own internal audits. CICS is an active member of the Office of the Comptroller General Small Departments and Agencies Advisory Group which provides horizontal internal audits to small agencies.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Audit of Human Resource Management | Assurance Audit ‑ Human Resource | Planned | March 2011 |
Audit of Operational Systems and Management of IM/IT | Assurance Audit ‑ IM/IT | Planned | March 2012 |
Audit of Emergency Preparedness, Continuity Planning and Security | Assurance Audit ‑ Emergency Preparedness, Continuity Planning and Security | Planned | March 2013 |
The creation of CanNor raises the requirement for a key part of the Agency's internal audit function to be undertaken jointly with the Office of the Comptroller General (OCG) as part of small departments and agencies arrangements under Treasury Board Secretariat's Policy on Internal Audit. Preliminary contacts have commenced with the OCG to expedite this process with a view to implementation in 2010–2011. In parallel, supplementary activities will develop a detailed corporate risk profile for the Agency for assessing where supplementary audit projects should be undertaken by the Agency in-house, outside OCG sector-wide audit activities.
The OCG has yet to finalize its sector-wide audit plans for the next three fiscal years — an essential base for developing the Agency's audit plans. The OCG has indicated that the work in this area will be completed by March 2010, which is when the Agency's corporate risk profile is also scheduled for completion. Once both information sources are in place, the Agency can finalize its detailed internal audit plan for the next three fiscal years.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Strategic Investments for Northern Economic Development — Summative Evaluation | Transfer | Planned | December 2010 |
Community Adjustment Fund — Summative Evaluation | Transfer | Planned | 2011–2012 |
Recreational Infrastructure Canada | Transfer | Planned | 2011–2012 |
CanNor Support for Northern Federal Councils — Internal Management | Transfer | Planned | 2012–2013 |
Internal Audits
The following activities are included in the CNSC risk-based Audit Plan for the period 2009-10 to 2011-12. This plan is in the process of being reviewed and updated.
The updated plan will be submitted to the CNSC's Audit Committee in April 2010 for review and recommendation for approval by the CNSC's President. It is based on the current capacity of the CNSC's audit function, risk assessments of proposed audit projects, and management responses and action plans for prior audits for follow-up. The revised plan will outline the projects planned for the upcoming three years. Projects undertaken depend on factors such as resources available to the audit function, the scope and complexity, of projects, and the CNSC's emerging issues and priorities.
The Commission has an Audit Committee with members who are external to the government and internal to the Commission. The Committee is chaired by an external member.
Additional information on the CNSC Internal Audits is available on the CNSC Web site.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Audit of Compliance Enforcement framework | Compliance and management audit | In progress (continued from 2009-10) | 2010-11 |
Audit of Revenue Management | Financial Audit | In progress (continued from 2009-10) | 2010-11 |
Preliminary Survey of Risk Management | Survey | In progress (continued from 2009-10) | 2010-11 |
Audit of Inspector Qualification and Training | Compliance and management audit | Planned | 2010-11 |
Audit of Delegated Licensing Authority | Compliance and management audit | Planned | 2010-11 |
Audit of Regulatory Document Development | Compliance and management | Planned | 2010-11 |
Audit of Corporate Governance | Governance and management audit | Planned | 2010-11 |
Monitoring of action plans from past audits | Monitoring | Ongoing | 2010-11 |
Follow-up on past audits, including Procurement Audit | Follow-up | Planned | 2010-11 |
Evaluations
In past years, the CNSC oversight focus has been on the internal audit function; however, we are now positioned to undertake the same improvement to the evaluation function. The CNSC began strengthening its evaluation function in Fiscal Year 2009-10, to ensure that it aligns with the new Treasury Board Secretariat Policy on Evaluation, effective April 1, 2009.
Building on work undertaken in 2009-10 (e.g., development of a policy, terms of reference for the evaluation advisory committee, development of the evaluation universe, etc.), the CNSC will continue with the next phase of implementation. This includes staffing, as well as assessing programs to determine the needs and priorities for the development of a three-year evaluation plan.
Additional information on CNSC Evaluations is available on the CNSC Web site.
Annexe 2 - Internal Audits and Evaluations
Name of Internal Audit | Type | Status | Completion Date | Electronic Link to Report |
---|---|---|---|---|
Audit of the Values and Ethics Framework | Management Framework | In progress | 2010-03-31 | N/A |
Audit of the IT Dependency | Management Framework | In progress | 2010-03-31 | N/A |
Audit of the IT Planning and Development | Management Framework | In progress | 2010-03-31 | N/A |
Audit of the Data and Systems Security | Management Framework | In progress | 2010-03-31 | N/A |
Audit of the Monitoring of access to controlled goods pursuant to ITAR enforcement | Management Framework | Projected | 2010-03-31 | N/A |
Audit of the Proactive Disclosure process | Management Framework | In progress | 2010-03-31 | N/A |
Audit of the Management Framework of the Official Languages practices | Management Framework | Projected | 2010-03-31 | N/A |
Audit of the Test Facilities Management | Management Framework | Projected | 2010-03-31 | N/A |
Audit of Records Management | Management Framework | Projected | 2011-03-31 | N/A |
Audit of Contracting and acquisitions practices | Management Framework | Projected | 2011-03-31 | N/A |
Audit of Skills Management | Management Framework | Projected | 2011-03-31 | N/A |
Audit of Personnel Retention Programs | Management Framework | Projected | 2011-03-31 | N/A |
Audit of Business Case for Major Investments | Horizontal Audit | Projected | 2011-03-31 | N/A |
Audit of Real Property Life Cycle Management | Horizontal Audit | Projected | 2011-03-31 | N/A |
Audit of Strategic Planning, Business Plans, Monitoring and Review of Priorities | Management Framework | Projected | 2011-03-31 | N/A |
Name of Evaluation | Program Activity | Type | Status | Completion Date | Electronic Link to Report |
---|---|---|---|---|---|
Evaluation of the RADARSAT-2 Major Crown Project | EO | Summative | Completed | 2009-09-30 | http://www.asc-csa.gc.ca/pdf/mcp-5702-7823.pdf |
Evaluation of the 2000-2009 Canada/ESA Cooperation Agreement | EO, SE, SC and GTA | Summative | In Progress | 2010-03-31 | N/A |
Evaluation of the Space Technology Development Program (STDP) | GTA | Summative | In Progress | 2010-03-31 | N/A |
1. Name of Internal Audit |
2. Internal Audit Type |
3. Status |
4. Expected Completion Date |
---|---|---|---|
IT Asset Maintenance Life Cycle |
Assurance |
Planned |
June 2010 |
Information Security |
Assurance |
Planned |
Sept 2010 |
Western Grain Railway Revenue Cap. |
Assurance |
Planned |
Dec 2010 |
Physical Security Access |
Assurance |
Planned |
April 2011 |
5. Electronic Link to Internal Audit Plan
In progress, the Agency Internal Audit plan is not yet formally approved, as of November 30, 2009.
The mission, vision and values described in the Internal Audit Charter of Citizenship and Immigration Canada (CIC), together with the Treasury Board internal audit policy and directives, provide the fundamental framework for the audit planning process at CIC. CIC's audit strategy is outlined in its risk-based audit plan, which forms the basis for audit activities within the Department.
Audits that are currently under way or planned for 2010–2011 include the following:
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Audit of Integration Program—Administration of Grants and Contributions | Program Audit | In Progress | Quarter 1 2010–2011 |
Audit of Information System—iCAMS | Information Technology Audit | In Progress | Quarter 1 2010–2011 |
Audit of Immigration Program in Missions Abroad—Port-au-Prince | Mission Audit | In Progress | Quarter 1 2010–2011 |
Audit of Immigration Program in Missions Abroad—Kingston (Jamaica) | Mission Audit | In Progress | Quarter 1 2010–2011 |
Audit of the CIC Memorandum of Understanding with Canada Border Services Agency | Audit of Agreement | In Progress | Quarter 1 2010–2011 |
Audit of Inland Permanent Residence Applications | Program Audit | In Progress | Quarter 1 2010–2011 |
Audit of Compliance with Travel and Hospitality Policies and Directives | Compliance Audit | In Progress | Quarter 1 2010–2011 |
Audit of management control framework in place over Multiculturalism Program | Audit of Administrative Process | Planned | Fiscal Year 2010–2011 |
Audit of Prairies and Northern Territories Region—Governance and Risk Management | Audit of Functional Area | Planned | Quarter 2 2010–2011 |
Audit of Atlantic Region—Governance and Risk Management | Audit of Functional Area | Planned | Fiscal Year 2010–2011 |
Audit of Information Management to Assess the Strength of the Management Control Framework | Audit of Administrative Process |
Planned | Fiscal Year 2010–2011 |
Audit of Operational Management and Coordination—Governance | Audit of Functional Area | Planned | Fiscal Year 2010–2011 |
Audit of International Region—Governance over Visa Application Centres | Audit of Functional Area | Planned | Fiscal Year 2011–2012 |
Audit of Immigration Program in Regional Processing Centre Abroad | Mission Audit | Planned | Fiscal Year 2010–2011 |
Audit of Staffing—Management to Assess Compliance with Policies and Legislation and the Management and Accountability Framework | Compliance Audit | Planned | Fiscal Year 2010–2011 |
Audit of Financial Internal Control Framework | Audit of Administrative Process | Planned | Fiscal Year 2010–2011 |
Audit of Pre-removal Risk Assessment to Assess Compliance of Processing with Legislation, Regulations and Policy | Compliance Audit | Planned | Fiscal Year 2010–2011 |
Audit of the Case Processing Centre in Sydney | Audit of Functional Area | Planned | Fiscal Year 2010–2011 |
Follow-up and Monitoring of Prior Year Audit Recommendations related to:
|
Other Audit-related Activities | Planned | Fiscal Year 2010–2011 |
Citizenship and Immigration Canada maintains an effective evaluation function to provide the Department with objective, timely and evidence-based information and conclusions on the results of programs, policies and initiatives, including conducting evaluations of the main grants and contributions programs.
Name of Evaluation | Program Type | Status (as of March 31, 2010) | Expected Completion Date |
---|---|---|---|
Immigration Programs | |||
Evaluation of Ministerial Instructions | Operating Fund | In planning | 2010–2011 |
Evaluation of the Provincial Nominee Program | Operating Fund | In planning | 2010–2011 |
Evaluation of the Business Immigration Program | Operating Fund | In planning | 2010–2011 |
Evaluation of the Sponsorship Program—Parents and Grandparents | Operating Fund | Planned | 2011–2012 |
Evaluation of the Sponsorship Program—Spouses, Partners and Children | Operating Fund | Planned | 2011–2012 |
Evaluation of the Canadian Experience Class Program | Operating Fund | Planned | 2012–2013 |
Temporary Resident Programs | |||
Evaluation of the Temporary Foreign Worker Program (Joint with Human Resources and Skills Development Canada—HRSDC) | Operating Fund | In planning | 2010–2011 |
Evaluation of the Biometrics Initiative | Operating Fund | Planned | 2012–2013 |
Canada's Role in International Migration and Protection | |||
Evaluation of the Migration Policy Development Program | Contribution | Planned | 2012–2013 |
Refugee Programs | |||
Evaluation of the Government-assisted Refugee Program and the Resettlement Assistance Program | Operating Fund/ Contribution |
In progress | 2010–2011 |
Evaluation of the Private Sponsorship of Refugees Program | Operating Fund | Planned | 2012–2013 |
Integration Programs | |||
Evaluation of the Canada–Ontario Immigration Agreement Strategic Plan for Settlement and Language Training | Contribution | In progress | 2010–2011 |
Evaluation of the Going to Canada Immigration Portal (Joint with HRSDC) | Contribution | In progress | 2010–2011 |
Evaluation of the Enhanced Language Training Program | Contribution | In planning | 2010–2011 |
Evaluation of the Recruitment and Integration of French-speaking Immigrants to Francophone Minority Communities Program | Contribution | Planned | 2011–2012 |
Evaluation of Canadian Orientation Abroad | Contribution | Planned | 2011–2012 |
Evaluation of the Foreign Credentials Referral Office | Contribution | Planned | 2012–2013 |
Citizenship and Multiculturalism Programs | |||
Evaluation of Nationally Standardized Data Collection Strategy on Hate-motivated Crime (Initiative under the Canada's Action Plan Against Racism) | Operating Fund | In progress | 2010–2011 |
Evaluation of Canada's Action Plan Against Racism | Operating Fund/ Contribution | In progress | 2010–2011 |
Evaluation of Multiculturalism Program | Contribution | Planned | 2011–2012 |
Evaluation of the Community Historical Recognition Program | Operating Fund/ Contribution | Planned | 2011–2012 |
Evaluation of Citizenship Grants, Searches and Proofs | Operating Fund | Planned | 2011–2012 |
Evaluation of Citizenship Education and Promotion | Operating Fund | Planned | 2012–2013 |
Other Programs | |||
Evaluation of Canada's Visa Policy | Operating Fund | Planned | 2011–2012 |
Evaluation of the Immigration Medical Examination | Operating Fund | Planned | 2011–2012 |
Evaluation of the Public Service Health Overseas Program | Operating Fund | Planned | 2011–2012 |
Evaluation of the Transfer Without Visa Policy | Operating Fund | Planned | 2012–2013 |
Internal Programs and Services | |||
Evaluation of the Office of Conflict Resolution | Operating Fund | Planned | 2011–2012 |
Evaluation of Staffing Function | Operating Fund | Planned | 2012–2013 |
Evaluation of Pay and Benefits Function | Operating Fund | Planned | 2012–2013 |
Horizontal Initiatives | |||
Evaluation of the 2010 Olympic and Paralympic Winter Games (Canadian Heritage Lead) | Operating Fund | In planning | 2010–2011 |
Evaluation of Security for the 2010 Olympic and Paralympic Winter Games (Royal Canadian Mounted Police Lead) | Operating Fund | In planning | 2010–2011 |
Evaluation of the Enhanced Driver's Licence Program (Canada Border Services Agency Lead) | Operating Fund | In planning | 2010–2011 |
Alberta Temporary Foreign Worker Advisory Office (Canada–Alberta Temporary Worker Working Group Lead) | Operating Fund | In planning | 2010–2011 |
Evaluation of the Roadmap for Canada's Linguistic Duality 2008–2013 | Operating Fund/ Contribution | Planned | 2012–2013 |
Name of Internal Audit | Audit Type | Status | Completion Date |
---|---|---|---|
Horizontal Internal Audit of Expenditures Controls (Higher Risk Payments) in SDAs. | Financial Management Control | Completed, awaiting final report | Unknown |
Below is a list of internal audits identified in the 2009-2012 Risk-based Internal Audit Plan approved by the Departmental Audit Committee in May 2009. Please note that the list of projects planned for 2010/2011 and 2011/2012 may change as a result of the annual update to the risk-based planning process. A list of approved projects and Internal Audit Reports can be found on CSC's web site at:
2009-2010 Internal Audit Planned Projects
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
2009-10 Approved Internal Audit Projects for Completion in 2010-11 | |||
Audit of Regional Psychiatric Centres / Regional Treatment Centres | Correctional Operations | In Progress | April 2010 |
Audit of Case Management - Supervision Framework | Correctional Operations | In Progress | April 2010 |
Audit of HR Data Integrity | HR Management | In Progress | April 2010 |
Audit of Internal Controls over Financial Reporting | Financial Management | Planned | April 2010 |
Review of CORCAN Construction Contracts | Procurement and Financial Management | Planned | April 2010 |
Follow-up Review of Employee Leave | HR Management | Planned | April 2010 |
Pre-release Decision Making within the Case Preparation and Release Planning Framework | Correctional Operations | Planned | June 2010 |
Audit of Community Supervision | Correctional Operations | In Progress | June 2010 |
2010-11 Planned Internal Audit Projects | |||
Audit of Control of Entry and Exits to Institutions - Goods, Vehicles and People | Correctional Operations | Planned | -- |
Audit of Implementation of Deployment Standards | Correctional Operations | Planned | -- |
Audit of Mental Health Assessment at Intake | Correctional Operations | Planned | -- |
Audit of Pandemic Response Readiness | Correctional Operations and HR Management | Planned | -- |
Audit of Citizen/Partner Engagement Strategy | Correctional Operations and Management Practices | Planned | -- |
Audit of Strategic Planning / Integrated Risk Management | Management Practices | Planned | -- |
Audit of Implementation of Aboriginal Strategy Accountability Framework | Correctional Operations and Management Practices | Planned | -- |
Audit of Staffing Activities | HR Management | Planned | -- |
Audit of Internal Controls over Financial Reporting | Financial Management | Planned | -- |
Health Information Management Module Review | IM/IT | Planned | -- |
2011-12 Planned Internal Audit Projects | |||
Audit of Offender Population Management | Correctional Operations | Planned | -- |
Audit of Practices to Prevent/Respond to Deaths in Custody | Correctional Operations | Planned | -- |
Audit of Administration of Prescription Drug (including Implementation in Regional Pharmacies) | Correctional Operations | Planned | -- |
Audit of Employability Skills Programs for Offenders | Correctional Operations | Planned | -- |
Audit of Community Correctional Centres | Correctional Operations | Planned | -- |
Audit of Investigation Process | Correctional Operations and Management Practices | Planned | -- |
Audit of Values & Ethics Initiatives | Values & Ethics | Planned | -- |
Audit of Training Activities | HR Management | Planned | -- |
Audit of Internal Controls over Financial Reporting | Financial Management | Planned | -- |
Audit of IT Security - Intrusion Detection | IM/IT | Planned | -- |
Audit of Accommodation and Infrastructure Planning / Long-term Capital Planning | Real Property | Planned | -- |
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Population Management Initiatives | Ongoing | To commence in 2011/2012 | July 2013 |
Staff Safety in Institutions | Ongoing | To commence 2012/2013 | February 2015 |
Staff Safety in the Community | Ongoing | Commenced in 2009/2010 | December 20111 |
Community Corrections Operations | Community Supervision Ongoing funding |
Commenced in 2009/2010 | December 2011 |
Intensive Intervention Strategy for Women | Ongoing funding | Commenced in 2010/2011 | June 2011 |
Offender Education | Ongoing funding | To commence in 2011/2012 | December 2013 |
Values and Ethics | Ongoing funding | To commence in 2010/2011 | June 2012 |
Institutional Mental Health | Ongoing | To commence in 2011/2012 | March 2012 |
Learning and Development | Internal Services Ongoing funding |
To commence in 2011/2012 | October 2012 |
Grants & Contributions Programs | Conditional Grants | To commence in 2010/2011 | March 2011 |
Correctional Programs and Integrated Program Model | Ongoing funding | To commence in 2011/2012 | February 2014 |
Exchange of Service Agreements | Ongoing funding | To commence in 2011/2012 | March 2012 |
Electronic Monitoring | Strategic review $$ and MC | Commenced in 2008/2009 | December 2009 |
Strategic Plan for Aboriginal Corrections | Ongoing | Commenced in 2009/2010 | March 2011 |
National Standards for the Deployment of Correctional Officers | Ongoing funding | To commence in 2011/2012 | December 2013 |
Institutional Security | Ongoing funding but includes many smaller evaluations/activities | To commence in 2012/2013 | October 2015 |
*Note: Scheduled evaluations and dates subject to change.
1 Portions of this evaluation may be completed prior to this date.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Audit of the Supply of Circulating Currency | Assurance | In Progress | 2nd Quarter of 2010–11 |
Audit of Values and Ethics | Assurance | In Progress | 3rd Quarter of 2010–11 |
Audit of the Transfer Payment Process | Assurance | Planned | 4th Quarter of 2010–11 |
Audit of the Federal Debt Management Process | Assurance | Planned | 4th Quarter of 2010–11 |
Audit of the Human Resources Planning Function | Assurance | Planned | 4th Quarter of 2010–11 |
Audit of the Federal Budget Process and Framework | Assurance | Planned | 3rd Quarter of 2011–12 |
Audit of Contracting and Procurement | Assurance | Planned | 3rd Quarter of 2011–12 |
Audit of the Business Continuity Plan (BCP) | Assurance | Planned | 4th Quarter of 2011–12 |
Audit of the Department's Governance Framework | Assurance | Planned | 4th Quarter of 2011–12 |
Audit of IT Security | Assurance | Planned | 1st Quarter of 2012–13 |
Audit of Environmental and Sustainable Development | Assurance | Planned | 3rd Quarter of 2012–13 |
Audit of Development and Training | Assurance | Planned | 3rd Quarter of 2012–13 |
Audit of Security of Information | Assurance | Planned | 4th Quarter of 2012–13 |
Audit of Shared Services provided by the Treasury Board of Canada Secretariat | Assurance | Planned | 4th Quarter of 2012–13 |
Electronic link to Internal Audit Plan: N/A
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Economic and Fiscal Policy | Direct Spending | Planned | 4th Quarter of 2010–11 |
Funds Management Governance Framework | Treasury Evaluation Program | Planned | 4th Quarter of 2010–11 |
Integrated Market Enforcement Teams Initiative (IMETs) | Horizontal Initiative | In Progress | 4th Quarter of 2010–11 |
Anti-Money Laundering and Terrorist Financing Regime | Horizontal Initiative | In Progress | 4th Quarter of 2010–11 |
Canada Health and Social Transfers | Major Statutory Spending |
Planned | 1st Quarter of 2011–12 |
Payments to International Development Association, including Payments and encashment of notes issued to the European Bank for Reconstruction and Development | Direct Spending | Planned | 2nd Quarter of 2011–12 |
Buyback Programs | Treasury Evaluation Program | Planned | 3rd Quarter of 2011–12 |
Economic Forecasting | Direct Spending | Planned | 1st Quarter of 2012–13 |
Fiscal Equalization | Major Statutory Spending | Planned | 2nd Quarter of 2012–13 |
Meta-Evaluation of Treasury Evaluations from 1995 to Present | Direct Spending | Planned | 3rd Quarter of 2012–13 |
International Trade and Finance | Direct Spending | Planned | 4th Quarter of 2012–13 |
Crown Borrowing | Treasury Evaluation Program | Planned | 4th Quarter of 2012–13 |
Electronic link to Evaluation Plan: N/A
Changes to the Evaluation Plan do occur from time to time and will be reflected accordingly in future Departmental Performance Reports and Reports on Plans and Priorities.
The Office of the Chief Audit Executive has a three-year risk-based audit plan, which specifies the internal audits to be carried out over this time frame. The plan is refreshed each year to ensure that it continues to address the areas of highest importance. The following table outlines those audits identified for 2010-2011 and 2011-2012. Identified audits, including those identified in the 2009-2010 plan but not completed, will be prioritized in line with available resources.
1) Name of Internal Audit | 2) Internal Audit Type | 3) Status | 4) Expected Completion Date (Dependent on Resources) |
---|---|---|---|
Strategic Planning | Comprehensive | Planned | 2010-2011 |
Operational Planning | Comprehensive | Planned | 2010-2011 |
Environmental Monitoring | Comprehensive | Planned | 2010-2011 |
Program Development Framework | Operational | Planned | 2010-2011 |
Management of Transfer Payments | Operational | Planned | 2010-2011 |
Financial Reporting Controls | Financial | Planned | 2010-2011 |
Information Management—Life Cycle | Operational | Planned | 2010-2011 |
Asset Management—Non-IT | Operational | Planned | 2010-2011 |
HR—Performance Management | Operational | Planned | 2010-2011 |
HR—Compensation and Benefits | Operational | Planned | 2010-2011 |
Security (physical) | Operational | Planned | 2010-2011 |
Procurement (including contracting) | Operational | Planned | 2011-2012 |
Policy Management Framework | Operational | Planned | 2011-2012 |
Legal Management (including regulatory obligations) | Operational | Planned | 2011-2012 |
Stakeholder Relations (managing memorandums of understanding) | Operational | Planned | 2011-2012 |
Program Management—Performance Management | Operational | Planned | 2011-2012 |
Platform Management—Management Framework and Capacity | Operational | Planned | 2011-2012 |
Values and Ethics | Comprehensive | Planned | 2011-2012 |
Treasury Management (banking and foreign exchange) | Financial | Planned | 2011-2012 |
Business Continuity—Assessment and Planning | Operational | Planned | 2011-2012 |
HR—Staffing | Operational | Planned | 2011-2012 |
HR—Planning | Operational | Planned | 2011-2012 |
Revenue Controls | Financial | Planned | 2011-2012 |
5) Contact information: Yves Vaillancourt
Chief Audit Executive
Office of the Chief Audit Executive
Department of Foreign Affairs and International Trade
Tel: 613-943-4743
FAX: 613-944-4357
E-mail: yves.vaillancourt@international.gc.ca
All upcoming Evaluations over the next three fiscal years
1) Name of Evaluation | 2) Program Type | 3) Status | 4) Expected Completion Date |
---|---|---|---|
Fiscal Year 2010/11 | |||
Americas Strategy | Formative Evaluation | Ongoing | June 2010 |
Global Commerce Strategy | Formative Evaluation | Ongoing | June 2010 |
Policy Development Capacity | Summative Evaluation | Ongoing | June 2010 |
Transformation Agenda | Formative Evaluation | Ongoing | June 2010 |
Performance Management Program and Learning Plans for Employees | Summative Evaluation | Ongoing | June 2010 |
Public Diplomacy (Academic Relations) | G&C (Summative Evaluation) | Ongoing | June 2010 |
Performance Management Agreement and Learning Plans for Executives (including Talent Management and Succession Planning) | Summative Evaluation | Ongoing | September 2010 |
Canada Investment Fund for Africa (CIFA) -Mid-Term Review | Formative Evaluation | Ongoing | September 2010 |
Northern Dimension of Canadian Foreign Policy | G&C (Summative Evaluation) | Planned | September 2010 |
Softwood Lumber Agreement | Summative Evaluation | Planned | September 2010 |
Counter-Terrorism Programming (CTCB, PSAT) | G&C (Summative Evaluation) | Planned | December 2010 |
Global Partnership Program (GPP) | G&C (Summative Evaluation) | Planned | December 2010 |
Consular Affairs and Emergency Management Branch Evaluation | Summative Evaluation | Planned | March 2011 |
UNCLOS - Extended Continental Shelf | Formative Evaluation | Planned | March 2011 |
European Union (EU) Market Plan | Summative Evaluation | Planned | March 2011 |
Fiscal Year 2011/12 | |||
Roll-Out of Integrative Trade Model – Japan IBD Study | Summative Evaluation | Planned | June 2011 |
Investment Visibility Program | Summative Evaluation | Planned | June 2011 |
Protocol Visits and Hospitality Programs | Summative Evaluation | Planned | June 2011 |
Rotational Acting Assignments | Summative Evaluation | Planned | June 2011 |
Class of Contributions to support International Environmental Programs | G&C (Summative Evaluation) | Planned | TBD |
Staffing Operations and Client Effectiveness | Summative Evaluation | Planned | TBD |
Global Commerce Support Program (GCSP) | G&C (Formative Evaluation) | Planned | TBD |
Impact of the Export and Import Controls Act | Formative Evaluation | Planned | TBD |
Francophonie Promotion Fund | G&C (Summative Evaluation) | Planned | TBD |
Regional Service Centres Evaluation | Formative Evaluation | Planned | TBD |
Activity-Based Management Passport Canada | Summative Evaluation | Planned | TBD |
Long-Term Investment Plans Passport Canada | Summative Evaluation | Planned | TBD |
Fiscal Year 2012/13 | |||
Afghanistan (conducted jointly with CIDA and DND) | G&C (Summative Evaluation) | Planned | TBD |
Sector Practice | Summative Evaluation | Planned | TBD |
Global Commerce Strategy (GCS) | Summative Evaluation | Planned | TBD |
Global Commerce Support Program (GCSP) | G&C (Summative Evaluation) | Planned | TBD |
Information Management/Information Technology (IM/IT) Secure Network | Formative Evaluation | Planned | TBD |
Property Management | Summative Evaluation | Planned | TBD |
Locally Engaged Staff (focus on United States) | Summative Evaluation | Planned | TBD |
Administration of Foreign Service Directives | Summative Evaluation | Planned | TBD |
International Youth Program | Summative Evaluation | Planned | TBD |
Passport Issuance Program Abroad | Summative Evaluation | Planned | TBD |
Security Enhancements to the Canadian Passport | Summative Evaluation | Planned | TBD |
Assessed Contributions | G&C (Summative Evaluation) | Planned | TBD |
Mission Security Phase II Critical Infrastructure | Summative Evaluation | Planned | TBD |
Five-Year
DFAIT Evaluation Plan (HTML)
Five-Year DFAIT Evaluation
Plan (PDF)
The following table of Mission Inspections planned by the Office of the Inspector General has been approved by senior management at the DFAIT Evaluation Committee.
All upcoming Mission Inspections over the next three fiscal years
1) Name of Mission Inspection | 2) Inspection Type | 3) Status | 4) Expected Completion Date |
---|---|---|---|
Fiscal Year 2009/10 | |||
Rabat | Consulting: Mission operations | Completed and approved by the Departmental Evaluation Committee (DEC) | September 2, 2009 (Not yet posted to Internet) |
Belgrade | Consulting: Mission operations | Completed and approved by DEC | September 2, 2009 (Not yet posted to Internet) |
Stockholm | Consulting: Mission operations | Completed and approved by DEC | September 2, 2009 (Not yet posted to Internet) |
The Vatican | Consulting: Mission operations | Completed and approved by DEC | September 2, 2009 (Not yet posted to Internet) |
Khartoum | Consulting: Mission operations | Completed but not yet approved by DEC | December 15, 2009 (Not yet posted to Internet) |
Kinshasa | Consulting: Mission operations | Completed but not yet approved by DEC | December 15, 2009 (Not yet posted to Internet) |
Bucharest | Consulting: Mission operations | In Draft | March 2010 |
Helsinki | Consulting: Mission operations | In Draft | March 2010 |
Dublin | Consulting: Mission operations | In Draft | March 2010 |
Pretoria (Johannesburg) | Consulting: Mission operations | In Progress | March 2010 |
Harare | Consulting: Mission operations | In Progress | March 2010 |
Addis Ababa | Consulting: Mission operations | In Progress | March 2010 |
Bamako | Consulting: Mission operations | In Progress | March 2010 |
Maputo | Consulting: Mission operations | In Progress | March 2010 |
Fiscal Year 2010/11 | |||
Los Angeles (San Diego, Phoenix) | Consulting: Mission operations | Planned | June 2010 |
San Francisco (Palo Alto) | Consulting: Mission operations | Planned | June 2010 |
San Jose (Managua, Tegucigalpa) | Consulting: Mission operations | Planned | June 2010 |
Guatemala City | Consulting: Mission operations | Planned | June 2010 |
San Salvador | Consulting: Mission operations | Planned | June 2010 |
East Asia | Consulting: Mission operations | Planned | June 2010 |
Central, South, East Europe | Consulting: Mission operations | Planned | September 2010 |
North America | Consulting: Mission operations | Planned | December 2010 |
Middle East and North Africa | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
European Union and West Europe, International Organizations and Economic Policy | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Middle East and North Africa | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Asia South and Pacific | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Latin America and Caribbean | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Middle East and North Africa | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Fiscal Year 2011/12 | |||
Africa | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Central, East and South Europe | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
North America and International Organizations | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
European Union and Western Europe | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
North America | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Latin America and Caribbean | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Asia South and Pacific | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Africa | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
European Union and Western Europe | Consulting: Mission operations | Proposed | Proposed plan to be reviewed by DEC in March 2010 |
Electronic link to mission inspections plan: The Mission Inspections Plan is not published online
as it is under constant review and modification depending upon the risk environment. Reports can be found at
www.international.gc.ca/about-a_propos/oig-big/index.aspx?lang=eng.
Name of Internal Audit | Status | Expected Completion |
---|---|---|
National Defence Legal Services Unit | In progress | 2010-11 |
Natural Resources Canada Legal Services Unit | In progress | 2010-11 |
Treasury Board Legal Services Unit | In progress | 2010-11 |
Regulatory Law Ontario Office | In progress | 2010-11 |
Budgetary Forecasting & Allocation | In progress | 2010-11 |
PeopleSoft | In progress | 2010-11 |
Portfolio Offices | In progress | 2010-11 |
Contracting (Regional Offices) | In progress | 2010-11 |
Canada Border Services Legal Services Unit | Tentative * | 2011-12 |
Industry Canada Legal Services Unit | Tentative | 2011-12 |
Legal Account Verification Process (Civil) | Tentative | 2011-12 |
Tax Law Services (Ottawa) | Tentative | 2011-12 |
Tax Law Services (Prairie Region) | Tentative | 2011-12 |
Resourcing / Staffing | Tentative | 2011-12 |
Business Continuity Planning | Tentative | 2011-12 |
Information Holdings – Paper Files | Tentative | 2011-12 |
* Please note that the term tentative is used to denote proposed audits that require Departmental Audit Committee review and Deputy Minister Approval.
Electronic Link to Internal Audit Plan:
http://www.justice.gc.ca/eng/dept-min/pub/aud-ver/index.html
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Youth Justice Initiative | Transfer payment | In progress | 2010-11 |
Informal Conflict Management System | Internal service | In progress | 2010-11 |
Aboriginal Justice Strategy | Transfer payment | In progress | 2010-11 |
Family Violence Initiative | Transfer payment | Planned | 2010-11 |
Contraventions Act | Legislative | Planned | 2010-11 |
Contraventions Act Fund | Transfer payment | In progress | 2010-11 |
Federal Victims Strategy | Transfer payment | In progress | 2010-11 |
Legal Aid Program | Transfer payment | Planned | 2011-12 |
Justice Partnership and Innovation Fund | Transfer payment | Planned | 2011-12 |
Access to Justice in Both Official Languages Support Fund | Transfer payment | Planned | 2011-12 |
National Anti-Drug Strategy | Horizontal Justice-led | Planned | 2011-12 |
Aboriginal Court work Program | Transfer payment | Planned | 2012-13 |
Electronic link to evaluation plan:
Current plan has not yet been posted.
Name of internal audit | Internal audit type | Status | Expected completion date |
---|---|---|---|
2010-2011 | |||
Audit of the Recreational Infrastructure Canada program and the Community Adjustment Fund (from CEAP – agreement monitoring) | Audit of controls | Planned | 3rd quarter |
Audit of program design | Audit of controls | Planned | 3rd quarter |
Audit of follow-up on action plans from earlier audits | Audit of controls | Planned | 2nd quarter |
Audit of the Financial Management Control Framework, regular programming | Audit of controls | Planned | 4th quarter |
Annual audit of the Infrastructure Canada Program and the Municipal Rural Infrastructure Fund | Audit of controls | Planned | 3rd quarter |
Annual audit of the Building Canada Fund Communities Component | Audit of controls | Planned | 4th quarter |
Audit of integration of risk management concepts in operations | Audit of controls | Planned | 4th quarter |
Audit of collection and recovery mechanisms | Audit of controls | Planned | 3rd quarter |
Audit of level of preparedness for certification of financial statements | Audit of controls | Planned | 4th quarter |
2011-2012 | |||
Audit of management of information available to the public and communications | Audit of controls | Planned | 3rd quarter |
Audit of eligibility analysis of applications for regular programs | Audit of controls | Planned | 3rd quarter |
Audit of the Management Control Framework for cybersecurity and information | Audit of controls | Planned | 4th quarter |
Audit of human resources management (staffing) | Audit of controls | Planned | 3rd quarter |
Annual audit of the Infrastructure Canada Program and the Municipal Rural Infrastructure Fund | Audit of controls | Planned | 3rd quarter |
Annual audit of the Building Canada Fund Communities Component | Audit of controls | Planned | 3rd quarter |
Audit of the planning and priority-setting process | Audit of controls | Planned | 3rd quarter |
Compliance audit of wording of agreements on the basis of the Transfer Payment Policy | Audit of controls | Planned | 4th quarter |
2012-2013 | |||
Audit of liaison and representation activities | Audit of controls | Planned | To be determined |
Annual audit of the Infrastructure Canada Program and the Municipal Rural Infrastructure Fund | Audit of controls | Planned | To be determined |
Annual audit of the Building Canada Fund Communities Component | Audit of controls | Planned | To be determined |
Other audits to be determined, as required |
Name of evaluation | Program type | Status | Expected completion date |
---|---|---|---|
Summative evaluation of the Community Diversification program | Grants and contributions (G&C) | In preparation | December 2010 |
Summative evaluation of the Business and Regional Growth program | G&C | In preparation | December 2010 |
Implementation evaluation of the Regional Development Research program | G&C | Planned | December 2011 |
Summative evaluation of the Agency's communication strategy | Internal services | In progress | June 2010 |
Summative evaluation of the Official Languages Act (OLA) | G&C | Planned | March 2012 |
Summative evaluation of the Recreational Infrastructure Canada (RInC) program | G&C | Planned | March 2011 |
Evaluation of the Agency's 4th Sustainable Development Strategy | Regulatory | Planned | March 2012 |
Implementation evaluation of the Cruise initiative | G&C | In progress | September 2010 |
Summative evaluation of the Cruise initiative | G&C | Planned | March 2013 |
Environment Canada is in the process of developing a Three-Year Risk-Based Audit Plan for 2010/11–2012/13 therefore, projects included below may change.
1. Name of Internal Audit |
2. Internal Audit Type |
3. Status |
4. Expected Completion Date |
---|---|---|---|
Life-Cycle Management (LCM) of Assets |
Assurance |
In Progress |
Q3 2010-11 |
Management of Additional Funding Received through Canada Economic Plan |
Assurance |
In Progress |
Q1 2010-11 |
Professional Contracts |
Assurance |
In Progress |
Q3 2010-11 |
Governance of Information Management |
Assurance |
Planned |
Q2 2010-11 |
Classification |
Assurance |
Planned |
2010-11 |
Values and Ethics |
Assurance |
Planned |
2010-11 |
Governance Framework-Operational Planning and Reporting |
Assurance |
Planned |
2010-11 |
Assets and Inventory |
Assurance |
Planned |
2010-11 |
Business Continuity |
Assurance |
Planned |
2010-11 |
Greening Initiatives-Sustainability |
Assurance |
Planned |
2010-11 |
IM-IT Project (TBD) |
Assurance |
Planned |
2010-11 |
Official Languages Policy |
Assurance |
Planned |
2010-11 |
Water Management (joint audit/evaluation collaborative approach) |
Assurance |
Planned |
2010-11 |
Stakeholders and Partnership Management (joint audit/evaluation collaborative approach) |
Assurance |
Planned |
2010-11 |
Management of Additional Funding Received – Mackenzie Gas Pipeline (MGP) Project |
Assurance |
Planned |
2010-11 |
Performance Information in Strategic Planning and Reporting Documents (joint audit/evaluation collaborative approach) |
Assurance |
Planned |
2010-11 |
Greenhouse Gas Data Collection, Management and Reporting (joint audit/evaluation collaborative approach) |
Assurance |
Planned |
2010-11 |
Departmental Resources and Capacity |
Assurance |
Planned |
2011-12 |
Vehicle Scrappage (joint audit/evaluation collaborative approach) |
Assurance |
Planned |
2011-12 |
Migratory Birds |
Assurance |
Planned |
2011-12 |
Vehicles and Engines |
Assurance |
Planned |
2011-12 |
Protected Areas Management |
Assurance |
Planned |
2011-12 |
International Environmental Interests |
Assurance |
Planned |
2011-12 |
5. Electronic Link to Internal Audit Plan: http://www.ec.gc.ca/ae-ve/
Environment Canada is in the process of developing a Five-Year Risk-Based Evaluation Plan for 2010/11–2014/15 therefore, projects included below may change.
1. Name of Evaluation |
2. Program Type |
3. Status |
4. Expected Completion Date |
---|---|---|---|
Great Lakes Action Plan (to be approved in 2010-11) |
Direct Program Spending |
In Progress |
Q1 2010-11 |
Wildlife Habitat Foundation |
Transfer Payment |
In Progress |
Q2 2010-11 |
Improved Climate Change Scenarios |
Direct Program Spending |
In Progress |
Q1 2010-11 |
International Actions – Thematic Evaluation |
Direct Program Spending |
In Progress |
Q1 2010-11 |
CARA – Thematic Evaluation |
Direct Program Spending |
In Progress |
Q1 2010-11 |
CAA – Management & Accountability |
Direct Program Spending |
In Progress |
Q1 2010-11 |
Weather Predictions Program |
Direct Program Spending |
In Progress |
Q1 2010-11 |
2010 Olympics Games |
Direct Program Spending |
In Progress |
Q4 2010-11 |
Chemicals Management Plan |
Direct Program Spending |
In Progress |
Q4 2010-11 |
Adaptation Thematic Roll – up |
Direct Program Spending |
Planned |
2010-11 |
Clean Air Agenda (CAA) Horizontal Roll – up |
Direct Program Spending |
Planned |
2010-11 |
Federal Species at Risk Program (Interdepartmental led by EC) |
Direct Program Spending |
Planned |
2010-11 |
Evaluation of Freshwater Programs: Lake Simcoe Freshwater Initiative |
Direct Program Spending-Transfer Payment |
Planned |
2010-11 |
Evaluation of Freshwater Programs: Lake Winnipeg Freshwater Initiative |
Direct Program Spending-Transfer Payment |
Planned |
2010-11 |
Evaluation of Freshwater Programs: Great Lakes Sediment Remediation Program |
Direct Program Spending-Transfer Payment |
Planned |
2010-11 |
Northwest Territories Protected Areas Strategy Program |
Direct Program Spending |
Planned |
2010-11 |
Policy on Green Procurement (Interdepartmental led by PWGSC) |
Direct Program Spending |
Planned |
2010-11 |
Regulatory Improvements for Major Resource Projects (Interdepartmental led by Natural Resource Projects) |
Direct Program Spending |
Planned |
2010-11 |
Ice Program |
Direct Program Spending |
Planned |
2010-11 |
Stakeholders and Partnership Management (joint audit/evaluation collaborative approach) |
Direct Program Spending |
Planned |
2010-11 |
Water Management (joint audit/evaluation collaborative approach) |
Direct Program Spending |
Planned |
2010-11 |
Weather Prediction Program – Dissemination Systems and Service Delivery |
Direct Program Spending |
Planned |
2010-11 |
Greening Initiatives-Sustainability |
Direct Program Spending |
Planned |
2010-11 |
Performance Information in Strategic Planning and Reporting Documents (joint audit/evaluation collaborative approach) |
Direct Program Spending |
Planned |
2010-11 |
Greenhouse Gas Data Collection, Management and Reporting (joint audit/evaluation collaborative approach) |
Direct Program Spending |
Planned |
2010-11 |
Renewable Fuels |
Direct Program Spending |
Planned |
2011-12 |
Industrial Sector Emissions Program |
Direct Program Spending |
Planned |
2011-12 |
Water Science and Technology Laboratory Network and Technology (Services and Knowledge Transfer) |
Direct Program Spending |
Planned |
2011-12 |
National Aboriginal Strategy |
Policy |
Planned |
2011-12 |
Vehicle Scrappage (joint audit/evaluation collaborative approach) |
Transfer Payment |
Planned |
2011-12 |
5. Electronic link to evaluation plan: http://www.ec.gc.ca/ae-ve/
Notes:
|
|||
Name of Evaluation | Program Type | Status | Expected Completion Date (2010–2011) |
---|---|---|---|
Eastern Ontario Development Program | Contribution Program | Q3 | |
Community Adjustment Fund | Contribution Program | Q4 | |
Economic Development Initiative | Contribution Program | Q4 |
An evaluation plan is to be developed.
There are currently no scheduled internal audits planned by FINTRAC. Instead of having an independent audit committee, FINTRAC accesses the Small Department and Agencies (SDA) Audit Committee established by the Office of the Comptroller General. FINTRAC will continue to participate in horizontal audits conducted by the Office of the Comptroller General Small Department and Agencies Audit Committee. |
1. Name of Evaluation |
2. Program Type |
3. Status |
4. Expected Completion Date |
---|---|---|---|
Summative evaluation of Canada's Anti-Money Laundering and Anti-Terrorist Financing Initiative |
On-going Horizontal Initiative |
In Progress |
2010-11 |
Office of the Privacy Commissioner of Canada Audit |
FINTRAC's Management of Information Holdings |
Planned |
2012-13 |
The following table lists all planned upcoming audits for the reporting period 2010-11 that pertain to the Department's work.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
2009-10 | |||
Marine Communications and Tracking System | Performance Audit | Planning Stage | 2010-11 |
Supporting Statistical Information on the Fisheries | Info Systems Audit | Planning Stage | 2010-11 |
Classification | Compliance Audit | Planning Stage | 2010-11 |
Business Continuity Planning | Compliance Audit | Planned | 2010-11 |
Management of IT Security | Compliance Audit | Planned | 2010-11 |
2010-11 | |||
Aquaculture Management | Performance Audit | Planned | 2010-11 |
Legal Risk Governance | Compliance Audit | Planned | 2010-11 |
Account Verification Process | Performance Audit | Planned | 2010-11 |
Oceans Management | Performance Audit | Planned | 2010-11 |
Search and Rescue | Performance Audit | Planned | 2010-11 |
Coast Guard College | Performance Audit | Planned | 2010-11 |
Real Property | Performance Audit | Planned | 2010-11 |
2011-12 | |||
Life-Cycle Management Asset Services | Compliance Audit | Planned | 2011-12 |
Aids to Navigation2 | Performance Audit | Planned | 2011-12 |
Implementation of International Affairs Directorate2 | Planned | 2011-12 | |
Aboriginal Policy and Governance | Performance Audit | Planned | 2011-12 |
Fisheries Resource Management2 | Performance Audit | Planned | 2011-12 |
Federal Contaminated Sites Action Plan | Performance Audit | Planned | 2011-12 |
Department's Readiness for Financial Statements | Special Audit | Planned | 2011-12 |
Diversity Employment Equity, Planning and Recruitment Strategy | Performance Audit | Planned | 2011-12 |
Habitat Program Services | Performance Audit | Planned | 2011-12 |
Small Craft Harbours1 | Compliance Audit | Planned | 2011-12 |
2012-13 | |||
Support for Marine Security | Compliance Audit | Planned | 2012-13 |
Fleet Operational Readiness2 | Performance Audit | Planned | 2012-13 |
Learning2 | Performance Audit | Planned | 2012-13 |
Information Management2 | Compliance Audit | Planned | 2012-13 |
Communications2 | Performance Audit | Planned | 2012-13 |
Travel2 | Compliance Audit | Planned | 2012-13 |
Aquatic Invasive Species2 | Performance Audit | Planned | 2012-13 |
Species at Risk Management | Performance Audit | Planned | 2012-13 |
Material Management | Performance Audit | Planned | 2012-13 |
1TBS Mandated Audit
2Validation by DMC required
The following table lists all planned upcoming evaluations for the reporting period 2010-11 that pertain to the Department's work.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Aids to Navigation | Direct Program Spending | In Progress | 2010-11 |
Aboriginal Inland Habitat Program Contribution | Transfer Payment Program | Planned | 2010-11 |
Federal Contaminted Sites Action Plan | Direct Program Spending | Planned | 2010-11 |
Species at Risk Management | Direct Program Spending | Planned | 2010-11 |
Species at Risk Act | Policy | In Progress | 2010-11 |
Conservation and Protection | Direct Program Spending | Planned | 2010-11 |
Canada's Submission to the Commission on the limits of the Continental Shelf under the United Nations Convention on the Law of the Sea | Policy | Planned | 2010-11 |
Regulatory Improvement for Major Resource Projects | Direct Program Spending | Planned | 2010-11 |
2010 Olympics/Paralympics Games | Direct Program Spending | In Progress | 2010-11 |
Small Craft Harbour Divestiture Class Grant Program | Transfer Payment Program | Planned | 2010-11 |
Small Craft Harbours Divestiture Non-Core Harbour Program | Direct Program Spending | Planned | 2010-11 |
Fisheries Resources | Direct Program Spending | In Progress | 2010-11 |
Oceans Management | Direct Program Spending | Planned | 2010-11 |
Waterways Management | Direct Program Spending | In Progress | 2010-11 |
Genomics Research and Development Initiative | Direct Program Spending | In Progress | 2010-11 |
DFO's Evaluation Plan can be accessed electronically at http://www.dfo-mpo.gc.ca/ae-ve/evaluations-eng.htm
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion date |
---|---|---|---|
Financial Reporting Controls | Risk-Based Controls | In Progress | 2010 -11 |
Audit of IT Security | Program | Planned | 2010- 11 |
Audit of Grants and Contributions, Eligibility | Risk-Based Controls | Planned | 2010 -11 |
Audit of Grant to the Canadian Agency for Drugs and Technologies in Health | Transfer Payment | Planned | 2010 -11 |
Audits of Human Drugs - Post-Market Compliance and Enforcement | Program | Planned | 2010 -11 |
Audit of Emergency Preparedness | Risk-Based Controls | Planned | 2010 -11 |
Audit of Non-Insured Health Benefits-Pharmacy | Program | Planned | 2010 -11 |
Audit of Performance Management | Risk-Based Controls | Planned | 2010 -11 |
Audit of External Communications | Risk-Based Controls | Planned | 2010 -11 |
Audit of Business Cases for Major Investments | Initiative | Planned | 2010 -11 |
Audit of Payroll | Program | Planned | 2010 -11 |
Audit of IT Shared Services | Program | Planned | 2010 -11 |
Audit of Business Continuity Planning | Program | Planned | 2010 -11 |
Audit of Contributions Program to Improve Access to Health Services for Official Language Minority Communities | Transfer Payment | Planned | 2011 - 12 |
Audit of Grants & Contributions: Program Monitoring | Program | Planned | 2011 - 12 |
Audit of Grants for the Canadian Partnership Against Cancer Corporation | Transfer Payment | Planned | 2011 - 12 |
Audit of Grant to Support the Mental Health Commission of Canada | Transfer Payment | Planned | 2011 - 12 |
Audit of Natural Products: Post Market Compliance and Enforcement | Program | Planned | 2011 - 12 |
Audit of Business Planning | Risk-Based Controls | Planned | 2011 - 12 |
Audit of Governance (Phase II) | Risk-Based Controls | Planned | 2011 - 12 |
Audit of Key Financial Controls | Risk-Based Controls | Planned | 2011 - 12 |
Audit of Purchasing, Payables & Payment Cycles | Risk-Based Controls | Planned | 2011 - 12 |
Audit of IT Client Service Support | Program | Planned | 2011 - 12 |
Audit of SAP General Computer Controls | Risk-Based Controls | Planned | 2011 - 12 |
Audit of HC's Science Plan | Risk-Based Controls | Planned | 2011 - 12 |
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Fiscal Year 2010 - 2011 | |||
Implementation of a Patient Wait Time Guarantee (PWTG) Pilot Project Fund - Summative Evaluation | G&C's | Ongoing | October 2010 |
Canadian Partnership Against Cancer - Summative Evaluation | G&C's | Ongoing | March 2011 |
Augmenting Health Canada's Response to Bovine Spongiform Encephalopathy (BSE) - BSE 1, Phase II of Health Canada's and the Public Health Agency of Canada's response to BSE in the Areas of Rist Assessment and Targeted Research - BSE II - Summative Evaluation | Program Funding | Ongoing | March 2011 |
Human Drugs - Strategic Evaluation | Program Funding | Ongoing | March 2011 |
Medical Devices - Strategic Evaluation | Program Funding | Ongoing | March 2011 |
Nutrition Promotion - Strategic Evaluation | Program Funding | Ongoing | October 2010 |
Canada's Clean Air Agenda - Adaptation Theme (Environment Canada Lead) - Thematic Evaluation |
Program Funding | Ongoing | March 2011 |
Air Quality Health Index and Forecast Program - Evaluation | Program Funding | Ongoing | October 2010 |
Canada's Clean Air Agenda - Indoor Air Quality Theme - Thematic Evaluation | Program Funding | Ongoing | March 2011 |
Canada's Clear Air Agenda - Clean Air Regulatory Agenda - Thematic
Evaluation (Environment Canada Lead) |
Program Funding | Ongoing | March 2011 |
Protecting Canadians and the Environment from Toxic Substances through a Chemical Management Plan - Summative Evaluation | Program Funding | Ongoing | March 2011 |
Mental Health and Addictions (Cluster) - Strategic Evaluation | Program & G&C's | Ongoing | March 2011 |
Chronic Disease and Injury Prevention (Cluster) - Strategic Evaluation | Program & G&C's | Ongoing | November 2010 |
Environmental Health and Research (Cluster) - Strategic Evaluation | Program & G&C's | Ongoing | March 2011 |
Fiscal Year 2011 - 2012 | |||
Biologics - Strategic Evaluation | Program Funding | Planned | March 2012 |
Veterinary Drugs - Strategic Evaluation | Program Funding | Planned | March 2012 |
Preparedness for avian and pandemic influenza - Summative Evaluation (PHAC Lead) | Program Funding | Ongoing | March 2012 |
Strengthening and Modernizing Canada's Safety System for Health, Consumer and Food Products - Consumer Products - Component Evaluation | Program Funding | Planned | March 2012 |
Federal Tobacco Control Strategy - Summative Evaluation | Program & G&C's | Ongoing | June 2011 |
National Anti-Drug Strategy - Horizontal Summative Evaluation (Justice Canada Lead) |
Program & G&C's | Planned | March 2012 |
Strengthening and Modernizing Canada's Safety System for Health, Consumer and Food Products - Pesticide Products | Program Funding | Planned | March 2012 |
Primary Care (Cluster) - Strategic Evaluation | Program & G&C's | Planned | March 2012 |
Health Governance and Infrastructure Support (Cluster including Transfer) - Strategic Evaluation | Transfer Payment | Planned | March 2012 |
Horizontal Evaluation of the Genomics Research and Development Initiative - Summative Evaluation (NRC Lead) | Program Funding | Planned | March 2012 |
Fiscal Year 2012 - 2013 | |||
Official Languages Health Contribution Program - Summative Evaluation | Program & G&C's | Planned | June 2012 |
Health Care Policy Contribution Program - Summative Evaluation | Program & G&C's | Planned | June 2012 |
Health Information Program - Evaluation | Program Funding | Planned | March 2013 |
International Health Grants Program - Summative Evaluation | Program & G&C's | Planned | March 2013 |
Organ and Tissue Donation and Transplantation Program - Summative Evaluation | G&C's | Planned | October 2012 |
Evaluation on Water Quality | Program Funding | Planned | March 2013 |
Environmental Health Guide - Program Evaluation | Program Funding | Planned | March 2013 |
Implementation of an action plan to protect human health from environmental contaminants - Summative Evaluation | Program Funding | Planned | March 2013 |
Radiation Evaluation to also include Nuclear Emergency Preparedness and Dosimetry Services | Program Funding | Planned | March 2013 |
Strengthening and Modernizing Canada's Safety System for Health, Consumer and Food Products - Consumer Products - Summative Evaluation | Program Funding | Planned | March 2013 |
Workplace Hazardous Materials Information System - Evaluation | Program Funding | Planned | March 2013 |
Drug Treatment Funding Program of the National Anti-Drug Strategy - Summative Evaluation | Program & G&C's | Planned | March 2013 |
Canadian Regulatory System for Biotechnology - Summative Evaluation | Program Funding | Planned | March 2013 |
Independent/Third Party Evaluations | |||
Fiscal Year 2010 - 2011 | |||
Providing Funding to the Canadian Institute for Health Information through the Health Information Initiative | Up-Front Multi-Year Funding | Ongoing | March 2011 |
Named Grant to the Canadian Centre on Substance Abuse | Grant | Planned | March 2011 |
Fiscal Year 2011 - 2012 | |||
Named Grant to the Canadian Agency for Drugs and Technologies in Health | Grant | Planned | March 2012 |
Named Grant to the Canadian Patient Safety Institute | Grant | Planned | March 2012 |
Named Grant for the Mental Health Commission of Canada | Grant | Planned | March 2012 |
Conditional Grant to the Rick Hansen man in Motion Foundation, specifically to support the activities of the Spinal Cord Injury Transnational Research Network | Up-Front Multi-Year Funding | Planned | March 2012 |
Grant to Canadian Blood Services - Blood Safety and Effectiveness | Grant | Planned | March 2012 |
Fiscal Year 2012 - 2013 | |||
5. Electronic link to evaluation plan: N/A
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Skills and Employment | |||
EI long tenured workers | Summative | Planning | 2012-2013 |
EI extra 5 weeks | Summative | Planning | 2012-2013 |
EI severance investment for training | Summative | Planning | 2012-2013 |
New entrants and re-entrants | Summative | Draft Report | 2010-2011 |
Extended Duration for Long Tenured Workers | Summative | Planning | 2012-2013 |
Fishing Benefits | Summative | Planning | 2012-2013 |
Work Sharing Benefits | Summative | Planning | 2011-2012 |
Parental Benefits | Summative | Planning | 2012-2013 |
Maternity Benefits | Summative | Planning | 2012-2013 |
Three Pilot Projects - Seasonal Workers | Summative | Preliminary Findings | 2010-2011 |
Sickness Benefits | Summative | Planning | 2011-2012 |
LMDA Manitoba | Summative | In progress | 2010-2011 |
LMDA Ontario | Formative | In progress | 2010-2011 |
LMDA Ontario | Summative | Planning | 2011-2012 |
Aboriginal Skills and Employment Partnerships (ASEP) | Summative | Planning | 2011-2012 |
ASTSIF | Summative | Planning | 2010-2011 |
Targeted Initiative for Older Workers | Formative | In progress | 2010-2011 |
Targeted Initiative for Older Workers | Summative | Planning | 2011-2012 |
Enabling Accessibility Fund - Phase 12 | Summative | Planning | 2010-2011 |
Enabling Fund for Official Language Minority Communities (OLMC) | Formative | In progress | 2010-2011 |
Enabling Fund for OLMC - Phase 1 | Summative | In progress | 2010-2011 |
Enabling Fund for OLMC - Phase 2 | Summative | Planning | 2012-2013 |
Labour Market Agreements for Persons with Disabilities (LMAPD) Nova Scotia | Summative | Planning | 2011-2012 |
Labour Market Agreements and Strategic Training and Transition Fund (STTF) | Summative | Planning | 2012-2013 |
Canada Summer Jobs Case Study (as part of the YES Summative) | Summative | Planning | 2011-2012 |
National Child Benefit | Summative | In progress | 2010-2011 |
Sector Council Program | Summative | Final Report approval stage | 2010-2011 |
Sector Council Program | Summative | Not started | 2011-2012 |
Apprenticeship Grant (combined Apprenticeship Incentive Grant and Completion Grant programs) | Summative | Not started | 2011-2012 |
Literacy and Essential Skills | Formative | Final Report approval stage | 2010-2011 |
New Horizons for Seniors Program | Formative and Summative | Final Report approval stage | 2010-2011 |
Foreign Credential Recognition Program | Summative | Final Report approval stage | 2010-2011 |
Literacy and Essential Skills | Summative | In Progress | 2010-2011 |
Workplace Skills Initiative | Summative | Planning | 2010-2011 |
Temporary Foreign Worker Program | Summative | Planning | 2011-2012 |
Immigration Portal3 | Summative | In progress | 2010-2011 |
Learning | |||
Canada Student Loans Program | Summative | Preliminary Findings | 2010-2011 |
Canada Education Savings Program | Summative | Planning | 2011-2012 |
Labour | |||
Employment Equity Program | Summative | Final Report approval stage | 2010-2011 |
Labour Management Partnerships Program | Summative | Final Report approval stage | 2010-2011 |
International Trade and Labour Program | Summative | Final Report approval stage | 2010-2011 |
Wage Earner Protection Program | Formative | Planning | 2010-2011 |
Wage Earner Protection Program | Summative | Not started | 2012-2013 |
Racism Free Workplace Strategy | Summative | In progress | 2010-2011 |
Income Security | |||
Allowances | Summative | Terms of Reference Development Phase | 2011-2012 |
Old Age Security Pensions | Summative | Analysis of Results Phase | 2010-2011 |
Survivor Benefits | Summative | Terms of Reference Development Phase | 2011-2012 |
Disability Benefits | Summative | Preliminary Findings | 2010-2011 |
Canada Disability Savings Program | Summative | Methodology Development Phase | 2011-2012 |
Social Development | |||
Homelessness Partnering Strategy (HPS) | Summative | Planning | 2010-2011 |
Social Development Partnerships Program - Understanding Early Years (UEY) | Summative | Data Collection | 2010-2011 |
Voluntary Sector Stategy (VSS) | Summative | Planning | 2010-2011 |
Universal Child Care Benefit (UCCB) | Formative | Data Collection | 2010-2011 |
Federal Elder Abuse Initiative | Summative | Planning | 2010-2011 |
Citizen-Centered Service | |||
Internet Service Channel | Evaluation | Planning | 2011-2012 |
Passport Receiving Agent | Evaluation | Planning | 2010-2011 |
In-Person Client Resolution and In-Person Channel | Evaluation | Planning | 2012-2013 |
Marketing and Branding | Evaluation | Planning | 2012-2013 |
Integrity and Processing | |||
Identity Management Tools and Practice | Evaluation | Planning | 2012-2013 |
Vital Events for BC and Ontario | Evaluation | Planning | 2010-2011 |
Early Impacts of EI Automation | Evaluation | In progress | 2010-2011 |
EI Service Volumes | Evaluation | Planning | 2011-2012 |
1Subject to change as the
HRSDC 5 year Departmental Evaluation Plan
update is finalized in March 2010. 2Phase I evaluation excluding major infrastructure projects that extend into years after 2010-2011. 3Citizenship and Immigration Canada (CIC) is the lead department conducting the evaluation of Immigration Portal. |
HRSDC Internal Audit
HRSDC's annual planning cycle is based on risk. At this time, the Risk-Based Internal Audit Plan for 2010-2013 is being developed, with approval anticipated in early 2010-2011.
Below is a listing of internal audit engagements identified in the 2009-2012 Risk-Based Internal Audit Plan. Please note that the list of projects planned for 2010-2013 may change as a result of the risk-based audit planning process for 2010-2013.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
2009-2010 | |||
Audit of the Consolidated Statement of Administrative Costs Charged to the Canada Pension Plan Account by HRSDC/Service Canada, March 31, 2009 | Attest | Approved | December 2009 |
Follow-Up Audit of Compensation | Assurance | Planned | |
Review of the Strategic Training and Transition Fund | Review | Underway | March 2010 |
Review of the Work-Sharing Agreements | Review | Underway | March 2010 |
Review of Career Transition Assistance (Long Tenure Workers Pilot Project Management Control Framework) | Review | Underway | March 2010 |
Audit of Old Age Security Management Control Framework | Assurance | Planned | June 2010 |
Review of the Aboriginal Skills and Training Strategic Investment Fund | Review | Underway | March 2010 |
Audit of Program Eligibility | Assurance | Underway | March 2010 |
Review of Departmental Financial Statements | Review | Approved | October 2009 |
Risk Assessment and Gap Analysis of the Grants and Contributions Internal Control Framework | Review | Underway | March 2010 |
Audit of Financial Forecasting | Assurance | In-Reserve | |
Audit of Security | Assurance | In-Reserve | |
Audit of Section 34 of the Financial Administration Act | Assurance | In-Reserve | |
Planning Phase of the Audit of Asset Management | Assurance | In-Reserve | |
Audit of Dispute Resolution | Assurance | In-Reserve | |
Audit of the Management of IT Human Resources | Assurance | In-Reserve | |
2010-2011 | |||
Audit of Consolidated Statement of Administrative Costs Charged to the Canada Pension Plan Account by Human Resources and Skills Development Canada/Service Canada, March 31, 2010 | Attest | Planned | |
Audit of Aboriginal Skills and Employment Program | Follow-Up | Planned | |
Departmental Governance Regime | Assurance | Planned | |
Dispute Resolution | Assurance | Planned | |
Departmental Regulatory Framework | Assurance | Planned | |
Departmental Accounts Receivable System | Assurance | Planned | |
Canada Education Savings Grant | Assurance | Planned | |
Grants and Contributions Program Officers and Managers Skills and Training Requirements | Assurance | Planned | |
Classification | Assurance | Planned | |
Business Planning | Assurance | Planned | |
Financial Management Services | Assurance | Planned | |
Values and Ethics | Follow-Up | Planned | |
IT Agility | Assurance | Planned | |
Identity and Access Management (EI Systems) |
Assurance | Planned | |
Review of the Risk Assessment, Management and Mitigation Approach | Review | Planned | |
2011-2012 | |||
Audit of Consolidated Statement of Administrative Costs Charged to the Canada Pension Plan Account by Human Resources and Skills Development Canada/Service Canada, March 31, 2011 | Attest | Planned | |
Management of Budget 2009 Implementation | Assurance | Planned | |
Canada Student Loans Program | Assurance | Planned | |
Labour Market Development Agreements | Assurance | Planned | |
Asset Protection and Management | Assurance | Planned | |
Privacy | Assurance | Planned | |
Youth Employment Strategy | Assurance | Planned | |
Centre of Excellence for Grants and Contributions | Assurance | Planned | |
Information Sharing Agreements | Assurance | Planned | |
Employment Equity | Assurance | Planned | |
Risk Management | Follow-Up | Planned | |
Business Continuity Planning | Follow-Up | Planned | |
IT Investments | Assurance | Planned | |
Infrastructure Capacity & Performance Management | Assurance | Planned |
Please Note:
Once approved, HRSDC internal audit reports
are posted on the website listed below.
http://www.hrsdc.gc.ca/en/publications_resources/audit/index.shtml
A. All upcoming internal audits over the next three fiscal years
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Follow-up audit on IRB Regional Offices Audit | Internal Services activities | Planned | 2010-11 |
Follow-up audit on PSC Human Resources Audit | Human Resources (public service appointments, activities and processes) | Planned | 2011-12 |
Follow-up audit on OCG Contracting Information Systems and Monitoring Audit | Procurement | Planned | 2012-13 |
B. All upcoming evaluations over the next three fiscal years
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Departmental evaluation plan | Development of the IRB's rolling five-year evaluation plan | In Progress | End of 2009-10 |
Performance measurement | Follow up Assist divisions and the Operations Branch to measure the IRB's performance in major areas |
In Progress | 2010-11 |
Performance measurement | Develop performance indicators for internal services | Planned | 2010-11 |
Evaluation of the IRB's Case Scheduling Practices | Implementation Oversight of the implementation of management's action plan in response to this evaluation |
Planned | 2010-11 |
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Review of PeopleSoft | Review | Completed | April 22, 2009 |
System Under Development Review of CIS-IRS - Remainder of Last Year | Assurance | Completed | April 22, 2009 |
Management Practices Review - Northern Affairs & North Regions | Review | Completed | April 30, 2009 |
MPR - Lands & Economic Dev. Sector, Preliminary Survey for the Audit of Economic Dev. (Non-Proposal Driven) & Follow-up Audit of Aboriginal Business Canada | Review | Completed | May 2009 |
Audit of Capacity Development - Preliminary Survey (Planning, Conduct and Reporting Phases) | Assurance | Completed | June 3, 2009 |
Audit of Elementary & Secondary Schools and Other Education | Assurance | Completed | June 3, 2009 |
Audit of Band Support Funding | Assurance | Completed | September 25, 2009 |
Audit of Expenditure Management Monitoring | Assurance | Completed | September 25, 2009 |
Audit of Liabilities | Assurance | Completed | September 25, 2009 |
Audit of Occupational Health and Safety | Assurance | Completed | September 25, 2009 |
MPR - PSD and Audit of Strategic Policy and Planning | Review | Completed | September 2009 |
MPR - Education, Social Dev. P & P (ESDPP) and Regional Operations | Review | Completed | October 2009 |
MPR - Resolution Individual Affairs | Review | Completed | October 2009 |
MPR - CFO | Review | Completed | November 4, 2009 |
Preliminary Survey for the Audit of the Reporting Burden | Preliminary Survey | Completed | December 8, 2009 |
Planning Phase - Horizontal Audit of Grants and Contributions | Assurance | In Progress | January 31, 2010 |
Audit of Grants and Contributions | Assurance | Planned | March 31, 2010 |
Audit of the Delegation of Authorities, Organizational Design and Classification | Assurance | Planned | March 31, 2010 |
Audit of Housing | Assurance | In Progress | March 31, 2010 |
Due Diligence Review of Infrastructure Initiatives | Review | Planned | March 31, 2010 |
Audit of Aboriginal Business Canada and Non-Proposal Driven Programming | Assurance | In Progress | March 31, 2010 |
Audit of Implementation of the Urban Aboriginal Strategy | Assurance | In Progress | March 31, 2010 |
Review of SCIS - System (1,2,3,4) | Review | In Progress | March 31, 2010 |
Audit of Trust Accounts | Assurance | In Progress | March 31, 2010 |
Audit of Payroll | Assurance | In Progress | March 31, 2010 |
MPR - Adjudication Secretariat | Review | In Progress | March 31, 2010 |
Case Study & Analysis of MPRs Conducted Between 2006 - 2009 | Special Study | Planned | March 31, 2010 |
Audit of Information Management - CIDM | Assurance | In Progress | March 31, 2010 |
Administrative Review - Aboriginal Conference | Review | Planned | March 31, 2010 |
Review of Wrongdoing | Review | In Progress | March 31, 2010 |
Audit of Security Program | Assurance | In Progress | March 31, 2010 |
Financial Review | Review | In Progress | March 31, 2010 |
Audit of PeopleSoft | Assurance | In Progress | June 1, 2010 |
System Under Development Audit of CIS-IRS, continued | Assurance | In Progress | July 31, 2010 |
Audit of Regional IT Expenditures | Assurance | In Progress | November 30, 2010 |
Post-Implementation Audit of First Nations and Inuit Transfer Payment System | Assurance | In Progress | November 30, 2010 |
Audit of Family Violence | Assurance | Planned | 2009-2010 |
Preliminary Survey of Assets and Property Management | Preliminary Survey | Planned | 2009-2010 |
Audit of Revenue Management | Assurance | Planned | 2009-2010 |
Preliminary Survey for Audit of Internal and External Communications | Preliminary Survey | Planned | 2009-2010 |
Preliminary Survey of Litigation Management | Preliminary Survey | Planned | 2009-2010 |
Audit of Income Assistance | Assurance | Deferred | 2010-2011 |
Audit of Funding for Implementation and Negotiations | Assurance | Planned | 2010-2011 |
Audit of Specific Claims | Assurance | Planned | 2010-2011 |
Audit of Band Classification | Assurance | Planned | 2010-2011 |
Audit of Indian Government Support | Assurance | Planned | 2010-2011 |
Audit of Infrastructure Initiatives | Assurance | Planned | 2010-2011 |
Audit of Natural Resources and Environmental Management (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Child and Family Services (Enhanced Prevention Focus and Follow-up) | Assurance & Follow-Up | Planned | 2010-2011 |
Audit of Special Education | Assurance | Planned | 2010-2011 |
Follow-up of Previous Audits of Residential Schools | Follow-Up | Planned | 2010-2011 |
Audit related to External Reporting (Scope TBD) | Assurance | Planned | 2010-2011 |
Follow-Up Audit of Travel, Taxis, Hospitality, Conferences and Acquisition Cards | Follow-Up | Planned | 2010-2011 |
Audit of Assets and Property Management (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Loans and Accounts Receivable | Assurance | Planned | 2010-2011 |
Audit of Aboriginal Resourcing | Assurance | Planned | 2010-2011 |
Audit of Training and Development | Assurance | Planned | 2010-2011 |
Follow-Up Audit of IT Security | Follow-Up | Planned | 2010-2011 |
Audit of IM/IT Security | Assurance | Planned | 2010-2011 |
Audit of Systems Under Development or Application in Place - Enterprise Data Warehouse, Specific Claims Data Base | Assurance | Planned | 2010-2011 |
Preliminary Survey of OASIS | Preliminary Survey | Planned | 2010-2011 |
Preliminary Survey of GroupWise | Preliminary Survey | Planned | 2010-2011 |
Audit of Strategic Policy or Planning | Assurance | Planned | 2010-2011 |
Audit of Governance Structure | Assurance | Planned | 2010-2011 |
Post Implementation Audit of Forensic Audit Policy and Revised Complaints and Allegation Policy | Assurance | Planned | 2010-2011 |
Audit of Internal or External Communications (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Lands Management | Assurance | Planned | 2011-2012 |
Follow-up Audit of Capital Facilities and Maintenance | Follow-up | Planned | 2011-2012 |
Follow-up Audit of Economic Development | Follow-up | Planned | 2011-2012 |
Audit of Emergency | Assurance | Planned | 2011-2012 |
Audit of Other Education | Assurance | Planned | 2011-2012 |
Follow-Up Audit of Post Secondary Education | Follow-up | Planned | 2011-2012 |
Audit of Registration and Membership | Assurance | Planned | 2011-2012 |
Audit of Financial Planning and Budgeting | Assurance | Planned | 2011-2012 |
Audit of Forecasting | Assurance | Planned | 2011-2012 |
Audit of Human Resource Planning and Leadership Development | Assurance | Planned | 2011-2012 |
Audit of Advertised Appointments | Assurance | Planned | 2011-2012 |
Follow-up Audit of Occupational Health and Safety | Follow-up | Planned | 2011-2012 |
Audit of Personnel and Physical Security | Assurance | Planned | 2011-2012 |
Follow-up Audit of Information Management (CIDM focus) | Follow-up | Planned | 2011-2012 |
Audit of OASIS | Assurance | Planned | 2011-2012 |
Audit of GroupWise | Assurance | Planned | 2011-2012 |
Audit of Official Languages | Assurance | Planned | 2011-2012 |
Audit of Risk Management | Assurance | Planned | 2011-2012 |
Audit of Continuity of Operations | Assurance | Planned | 2011-2012 |
Grants and Contributions - Horizontal Departmental Audit - (Scope TBD) | Assurance | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Review of Management Practices (Regions TBD) | Review | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Review of Management Practices (Sectors TBD) | Review | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Fraud Risk and Control Strategies (All Audits) | Assurance | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Electronic Link to Internal Audit and Evaluation Plan:
Risk-Based Audit Plan 2009-2010 to 2011-2012
INAC Audit and Evaluation Reports
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Impact Evaluation of Healthy Food to Northern Communities | Operating expenditure/Internal management | Completed | April 2009 |
Summative Evaluation of Community Economic Development and Aboriginal Business Development Programs | Transfer Payment | Completed | April 2009 |
Evaluation Framework for the Indian Residential Schools Settlement Agreement | Transfer Payment | Completed | June 2009 |
Formative Evaluation of Reserve Land and Environment Program | Transfer Payment | Completed | June 2009 |
Impact Evaluation of the National Aboriginal Achievement Foundation | Transfer Payment | Completed | September 2009 |
Impact Evaluation of Indian Government Support | Transfer Payment | Completed | September 2009 |
Impact Evaluation of Treaty Related Measures (BC) | Transfer Payment | Completed | September 2009 |
Formative Evaluation to Assist Northerners in Assessing Key Vulnerabilities and Opportunities for 2009-2010 | Transfer Payment | Completed | December 2009 |
Impact Evaluation of the Aboriginal Healing Foundation | Transfer Payment | Completed | December 2009 |
Impact Evaluation of the Labrador-Innu Comprehensive Healing Strategy | Transfer Payment | Completed | December 2009 |
Impact Evaluation of Treaty Commissions (MB, SK) | Transfer Payment | In progress | March 2010 |
Impact Evaluation of Registration Administration | Transfer Payment | In progress | March 2010 |
Summative Evaluation of Capital Facilities and Maintenance | Transfer Payment | In progress | March 2010 |
Formative Evaluation of First Nations Infrastructure Fund | Transfer Payment | In progress | March 2010 |
Impact Evaluation of Emergency Management Assistance | Transfer Payment | In progress | March 2010 |
Formative Evaluation of Elementary and Secondary Education | Transfer Payment | In progress | March 2010 |
Formative Evaluation of Post-Secondary Education | Transfer Payment | In progress | March 2010 |
Impact Evaluation of On-Reserve Housing (including Shelter Allowance and Ministerial Loan Guarantees) | Transfer Payment | In progress | March 2010 |
Formative Evaluation of the Alberta Child and Family Services Model | Transfer Payment | In progress | April 2010 |
Summative Evaluation of First Nations Oil and Gas Moneys Management Act Implementation | Transfer Payment | In progress | April 2010 |
Summative Evaluation of Inuit Counseling in the South | Transfer Payment | In progress | April 2010 |
Summative Evaluation of Indian Bands for Land and Estates Management | Transfer Payment | In progress | June 2010 |
Impact Evaluation of the Intervention Policy | Policy | In progress | June 2010 |
Impact Evaluation of Self-Government Agreements | Transfer Payment | In progress | September 2010 |
Summative Evaluation of Inuit Relations Secretariat | Internal management | In progress | September 2010 |
Impact Evaluation of the Sustainable Development Strategy | Transfer Payment | Planned | March 2011 |
Summative Evaluation of the Inuit Art Foundation | Transfer Payment | Planned | March 2011 |
Formative Evaluation of Specific Claims Tribunal Action Plan | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Post-Secondary Education | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Elementary and Secondary Education | Transfer Payment | Planned | March 2011 |
Impact Evaluation of Family Violence Prevention | Transfer Payment | Planned | March 2011 |
Impact Evaluation of Child and Family Services | Transfer Payment | Planned | March 2011 |
Impact Evaluation of INAC's Proposal-Driven Economic Development Programs | Transfer Payment | Planned | March 2011 |
Impact Evaluation of EcoENERGY for Aboriginal and Northern Communities | Transfer Payment | Planned | March 2011 |
Impact Evaluation to Assist Northerners in Assessing Key Vulnerabilities and Opportunities for 2009-2010 | Transfer Payment | Planned | March 2011 |
Impact Evaluation of the Urban Aboriginal Strategy | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Negotiation and Implementation | Transfer Payment | Planned | March 2012 |
Formative Evaluation of Northern Regulatory Improvement Initiative | Transfer Payment | Planned | March 2012 |
Summative Evaluation of International Polar Year Component | Transfer Payment | Planned | March 2012 |
Impact Evaluation of First Nations Fiscal and Statistical Management | Transfer Payment | Planned | March 2012 |
Impact Evaluation of the Federal Interlocutor's Contribution Program and Powley; Management of Metis Aboriginal Rights | Transfer Payment | Planned | March 2012 |
Impact Evaluation of Comprehensive Land Claims Agreements | Transfer Payment | Planned | March 2013 |
Impact Evaluation of Income Assistance, National Child Benefit Reinvestment, Assisted Living Program | Transfer Payment | Planned | March 2013 |
Impact Evaluation of First Nations Water Management | Transfer Payment | Planned | March 2013 |
Evaluation of Community Economic Development Program and Aboriginal Business Development Program | Transfer Payment | Planned | March 2013 |
Assessment of Procurement Strategy for Aboriginal Business Evaluation | Transfer Payment | Planned | March 2013 |
Impact Evaluation of First Nations Land Management | Transfer Payment | Planned | March 2013 |
Impact Evaluation of Healthy Foods to Northern Communities | Operating expenditure/Internal management | Planned | March 2013 |
Impact Evaluation of INAC's Gender-Based Analysis Policy | Operating expenditure/Internal management | Planned | March 2013 |
Electronic link to evaluation plan:
Evaluation and Performance Measurement Plan 2009-2010 to 2013-2014
All Upcoming Internal Audits over the Next 2 Years
Proposed Internal Audits Projects 2010–11
Name of Internal Audit |
Internal Audit Type |
Expected Completion Date |
---|---|---|
Knowledge Infrastructure Program |
Transfer Payment Audit |
Q2 |
Marquee Tourism Events Program |
Transfer Payment Audit |
Q2 |
Rural and Remote Broadband Access |
Transfer Payment Audit |
Q3 |
Corporations Canada |
Management Control Framework Audit |
Q4 |
Human Resources |
Management Control Framework Audit |
Q2 |
Resource Management |
Management Control Framework Audit |
Q2 |
Office of the Superintendant of Bankruptcy |
Management Control Framework Audit |
Q4 |
Spectrum Applications Modernization Project |
Preliminary Survey |
Q3 |
Note:
This Table represents the internal audit projects tentatively scheduled for 2010–11. These projects will be confirmed as
part of the annual audit planning process scheduled to take place in Q4 of 2009–10.
Proposed Internal Audits Projects 2011–12
Name of Internal Audit | Internal Audit Type |
Expected Completion Date |
---|---|---|
Canada Small Business Financing |
Management Control Framework Audit |
Q2 |
Materiel Management |
Assurance Audit |
Q4 |
Canadian Intellectual Property Office |
Preliminary Survey |
Q2 |
Measurement Canada |
Preliminary Survey |
Q2 |
Regions |
Assurance Audit |
Q4 |
SITT Delivery |
Management Control Framework Audit |
Q1 |
Communications Research Centre |
Preliminary Survey |
Q3 |
Internal Control Gap Analysis |
Assurance Audit |
Q2 |
All Upcoming Evaluations over the Next 3 Fiscal Years
Proposed Projects 2010–11
Name of Evaluation | Evaluation Type |
Expected Completion Date |
---|---|---|
Internal Trade Secretariat |
Grant program |
Q2 |
Northern Ontario Development Program |
Contribution program |
Q3 |
2000 Policy on Title to Intellectual Property (Crown Procurement Contracts) |
Policy |
Q3 |
Structured Financing Facility |
Contribution program |
Q4 |
Marquee Tourism Events Program |
Contribution program |
Q4 |
Community Adjustment Fund (Northern Ontario) |
Contribution program |
Q4 |
Economic Development Initiative (OLMCs) |
Contribution program |
Q4 |
Notes:
Proposed Projects 2011–12
Name of Evaluation | Evaluation Type |
Expected Completion Date |
---|---|---|
Radio Advisory Board of Canada |
Contribution program |
Q3 |
Strategic Aerospace and Defence Initiative |
Contribution program |
Q4 |
Technology Partnerships Canada |
Contribution program |
Q4 |
Small Business Internship Program |
Contribution program |
Q4 |
Proposed Projects 2012–13
Name of Evaluation | Evaluation Type |
Expected Completion Date |
---|---|---|
Computers for Schools |
Contribution program |
Q2 |
Strategic Activities Program |
Contribution program |
Q3 |
OECD Grant Program |
Grant program |
Q3 |
Knowledge Infrastructure Program |
Contribution program |
Q3 |
Canada Business Networks |
Program |
Q4 |
Paperwork Burden Reduction Initiative |
Program |
Q4 |
Automotive Innovation Fund |
Contribution program |
Q4 |
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Building Canada Fund-Communities Component (BCF-CC) Program, (Top-Up and Acceleration) Consulting and Advisory Services | Economic Action Plan | In Progress | June 2010-2011 |
Provincial-Territorial Infrastructure Base Fund, (Acceleration) Consulting and Advisory Services | Economic Action Plan | In Progress | June 2010-2011 |
Building Canada Fund-Major Infrastructure Component (BCF-MIC), (Acceleration) Consulting and Advisory Services | Transfer Payment Program | In Progress | June 2010-2011 |
Assurance Audit of Contribution Management Control Framework of the Municipal Rural Infrastructure Fund (MRIF) | Transfer Payment Program | Planning Phase Completed. Starting Examination Phase | June 2010-2011 |
Assurance Audit of National Recreation Trails Fund | Economic Action Plan | Planned | 2010-2011 |
Assurance Audit of Infrastructure Stimulus Fund (ISF) | Economic Action Plan | Planned | 2010-2011 |
Assurance Audit of Green Infrastructure Fund (GIF) | Economic Action Plan | Planned | 2010-2011 |
Assurance Audit of Building Canada Fund-Major Infrastructure Component (BCF-MIC) | Transfer Payment Program | Planned | 2010-2011 |
Assurance Audit of Building Canada Fund-Communities Component (BCF-CC) | Transfer Payment Program | Planned | 2010-2011 |
Assurance Audit of Provincial-Territorial Infrastructure Base Fund (PT Base Fund) | Transfer Payment Program | Planned | 2010-2011 |
Assurance Audit of Corporate Management and Decision-Making Structure | Management | Planned | 2010-2011 |
Assurance Audit of Human Resources Management | Human Resources | Planned | 2011-2012 |
Assurance Audit of Information Management | Information Management | Planned | 2011-2012 |
Assurance Audit of Program Policy, Knowledge and Research | Policy | Planned | 2011-2012 |
Assurance Audit of Program Policy, Public Communications | Policy | Planned | 2011-2012 |
Assurance Audit of Managing Organizational Change | Management | Planned | 2011-2012 |
Assurance Audit of Corporate Performance Framework-Information for Decision-Making and Performance Reporting | Management | Planned | 2011-2012 |
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Research, Knowledge and Outreach | Transfer Payment Program | In Progress | June 2010 |
National Recreational Trails Fund | Transfer Payment Program | Planned | June 2010 |
Provincial-Territorial Base Funding | Transfer Payment Program | Planned | September 2010 |
Cluster Evaluation | Transfer Payment Program | Planned | March 2012 |
Building Canada Fund-Major Infrastructure Component (BCF-MIC) | Transfer Payment Program | Planned | September 2012 |
Infrastructure Stimulus Fund (ISF) | Transfer Payment Program | Planned | December 2012 |
Building Canada Fund-Communities Component (BCF-CC) | Transfer Payment Program | Planned | December 2012 |
Municipal Rural Infrastructure Fund (MRIF) | Transfer Payment Program | Planned | 2011-2012 |
Management and Oversight Function at Infrastructure Canada | Transfer Payment Program | Planned | 2011-2012 |
Human Resources Management | Human Resources | Planned | 2011-2012 |
Green Infrastructure Fund (GIF) | Transfer Payment Program | Planned | 2012-2013 |
Border Infrastructure Fund (BIF) | Transfer Payment Program | Planned | 2012-2013 |
Canadian Strategic Infrastructure Fund (CSIF) | Transfer Payment Program | Planned | 2012-2013 |
Wastewater Projects | Project-Based Funding at PAA Sub-Activity Level | Planned | 2012-2013 |
Evaluation Function | Evaluation - Treasury Board Requirement | Planned | 2012-2013 |
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Strategic Planning | Management control | Planned | June 2010 |
Change Management | Management control | Planned | Dec. 2010 |
Nitrate Preservation Facility | Grant | Planned | March 2011 |
Archival records kept at departments and agencies | Program | Planned | Sept. 2011 |
Digitizing of records for preservation | Program | Planned | Dec. 2011 |
IT replacement and upgrade plan | Management control | Planned | March 2012 |
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
National Archival Development Program - Summative Evaluation | Grants and Contributions | Planned | 2010-11 |
Government Records Branch - Formative Evaluation | Program | Planned | 2011-12 |
Programs and Services Sector - Formative Evaluation | Program and Service | Planned | 2011-12 |
Documentary Heritage Sector - Formative Evaluation | Program | Planned | 2012-13 |
Modernization - Formative Evaluation | Initiative | Planned | 2011-12 |
The following table lists the internal audit and evaluation work to be completed during fiscal year 2010-11 as well as provides an indication of the internal audit and evaluation work tentatively planned for initiation in fiscal year 2010-11. Completed audit and evaluation reports, which include management action plans to address audit and evaluation recommendations, are posted at the following link: http://www.crs-csex.forces.gc.ca/reports-rapports/index-eng.asp
Name |
Project Type |
Audit or Program Type |
Status |
Expected Completion Date |
---|---|---|---|---|
Civilian Leave Administration |
Audit |
Assurance |
In Progress |
1st Quarter 2010-11 |
Subcontract Visibility |
Audit |
Assurance |
In Progress |
1st Quarter 2010-11 |
Halifax Class Modernization/Frigate Life Extension (HCM/FELEX) |
Audit |
Assurance |
In Progress |
1st Quarter 2010-11 |
FMF Cape Breton Consolidation Project |
Audit |
Assurance |
In Progress |
1st Quarter 2010-11 |
CP140 Data Management System Contract |
Audit |
Management Action Plan Follow-up |
Planned |
1st Quarter 2010-11 |
Industrial Security |
Audit |
Assurance |
In Progress |
2nd Quarter 2010-11 |
Defence Sustainable Development Strategy |
Audit |
Assurance |
In Progress |
2nd Quarter 2010-11 |
RMC Kingston |
Audit |
Assurance |
In Progress |
2nd Quarter 2010-11 |
Canadian Forces Pension Plan |
Audit |
Assurance |
Planned |
2nd Quarter 2010-11 |
Loaned Equipment |
Audit |
Assurance |
Planned |
2nd Quarter 2010-11 |
Military Moves |
Audit |
Management Action Plan Follow-up |
Planned |
2nd Quarter 2010-11 |
CF Recruitment and Retention |
Evaluation |
PAA |
In Progress |
2nd Quarter 2010-11 |
Security and Defence Forum |
Evaluation |
Grant |
In Progress |
2nd Quarter 2010-11 |
COSPAS-SARSAT |
Evaluation |
Contribution Program |
In Progress |
2nd Quarter 2010-11 |
Health Services Recapitalization CFB Greenwood |
Audit |
Assurance |
Planned |
3rd Quarter 2010-11 |
Security Program Management |
Audit |
Assurance |
Planned |
4th Quarter 2010-11 |
CRS Audit Perspective |
Audit |
Other |
Planned |
4th Quarter 2010-11 |
Peace and Security Vancouver 2010 Olympics |
Evaluation |
PAA |
In Progress |
4th Quarter 2010-11 |
Land Training |
Evaluation |
PAA |
In Progress |
4th Quarter 2010-11 |
Real Property |
Evaluation |
PAA |
In Progress |
4th Quarter 2010-11 |
Situational Awareness |
Evaluation |
PAA |
In Progress |
4th Quarter 2010-11 |
NATO Contributions |
Evaluation |
Contribution Program |
In Progress |
2011-12 |
HR (Human Resources) Classification Process |
Audit |
Assurance |
Planned |
2011-12 |
Contract Terms of Payment |
Audit |
Assurance |
Planned |
2011-12 |
Realty Asset Governance |
Audit |
Assurance |
Planned |
2011-12 |
CRS Audit Perspective |
Audit |
Other |
Planned |
2011-12 |
Software Acquisition and Maintenance |
Audit |
Management Action Plan Follow-up |
Planned |
2011-12 |
Selected Enterprise Resource Planning (ERP) System Vulnerability Assessment |
Audit |
Assurance |
Planned |
2011-12 |
Departmental Fuel Expenditures |
Audit |
Assurance |
Planned (see note 2) |
2011-12 |
Travel, Hospitality and Conferences |
Audit |
Management Action Plan Follow-up |
Planned |
2011-12 |
Business Continuity Planning |
Audit |
Assurance |
Planned |
2011-12 |
Capital Equipment Projects |
Audit |
Risk Analysis |
Planned |
2011-12 |
Construction in Support of Capital Equipment (CISOE) Projects |
Audit |
Management Action Plan Follow-up |
Planned |
2011-12 |
Joint Support Ship |
Audit |
Assurance |
Planned |
2011-12 |
Unforecasted Operational Requirements |
Audit |
Assurance |
Planned |
2011-12 |
FMAS Adjusting Entries (SAs) |
Audit |
Assurance |
Planned |
2011-12 |
Conference of Defence Associations |
Evaluation |
Grant Program |
Planned |
2011-12 |
Civil Pension |
Evaluation |
Grant Program |
Planned |
2011-12 |
Source: Chief Review Services
Notes:
Subject | Status | Expected Completion Date | Electronic Link to Report |
---|---|---|---|
Evaluation of NPB initiatives related to the unique needs and circumstances of Aboriginal offenders, women offenders and ethno-cultural groups of offenders in the context of conditional release | Planned | March 31, 2012 | will be provided when available |
Evaluation of measures to provide victims with a more effective voice in criminal justice | Planned | March 31, 2011 | will be provided when available |
Review to assess the impact of processes to improve the pardon application process | Planned | March 31, 2011 | will be provided when available |
Evaluation of the impacts and effects of the strategic framework for citizen engagement, including expansion of the framework for citizen engagement to include rural, Aboriginal and culturally diverse communities | Planned | March 31, 2013 | will be provided when available |
Evaluation of departmental learning strategy | Planned | March 31, 2013 | will be provided when available |
The table below outlines all current and planned audit activities for the next three fiscal years to 2013-14. For any of the recently completed or ongoing audits, electronic links are not yet available, due to status of the report (i.e., currently under review, undergoing translation, etc.).
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Review of Values and Ethics Management Framework | Corporate Governance | Completed | 2009-10 |
Audit of Acquisition Cards – 2008-09 | Financial Management and Controls | In progress | 2009-10 |
Audit of Facilities Management and Related Equipment | Corporate Governance | In progress | 2009-10 |
Audit of Integrated Risk Management | Corporate Governance | In progress | 2009-10 |
Audit of Occupational Safety and Health | Corporate Governance | In progress | 2009-10 |
Audit of Financial Management | Financial Management and Controls | In progress | 2010-11 |
Audit of NRC's Industrial Research Assistance Program (NRC-IRAP) | Transfer payments | Planned | 2010-11 |
Audit of Human Resources | Corporate Governance | Planned | 2010-11 |
Audit of Capital Investment and Planning | Financial Management and Controls | Planned | 2011-12 |
Audit of Horizontal Initiatives | Financial Management and Controls | Planned | 2011-12 |
Audit of Industry Partnership Facilities | Financial Management and Controls | Planned | 2011-12 |
Follow-up to 2006-07 Audit of Management of IT Security | Corporate Governance | Planned | 2011-12 |
Audit of Research Management | Financial Management and Controls | Planned | 2012-13 |
Audit of Contracts | Financial Management and Controls | Planned | 2012-13 |
Review of Values and Ethics Management Framework | Corporate Governance | Planned | 2012-13 |
Follow-up to 2008-09 Audit of Construction Contracts | Financial Management and Controls | Planned | 2012-13 |
Follow-up to 2009-10 Audit of Integrated Risk Management | Corporate Governance | Planned | 2012-13 |
Audit of Planning and Prioritization | Corporate Governance | Planned | 2013-14 |
Audit of Hospitality – 2012-13 | Financial Management and Controls | Planned | 2013-14 |
Audit of Travel – 2012-13 | Financial Management and Controls | Planned | 2013-14 |
Audit of Acquisition Cards – 2012-13 | Financial Management and Controls | Planned | 2013-14 |
Follow-up to 2009-10 Audit of Occupational Safety and Health | Corporate Governance | Planned | 2013-14 |
Follow-up to 2010-11 Audit of Financial Management | Financial Management and Controls | Planned | 2013-14 |
Electronic Link to Internal Audit Plan and Reports
The table below outlines all current and planned evaluation activities for the next three fiscal years to 2013-14. For any of the recently completed or ongoing evaluations, electronic links are not yet available, due to status of the report (i.e., currently under review, undergoing translation, etc.).
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Class Grant to International Affiliations | Transfer Payment | In progress | 2009-10 |
Evaluation of the NRC Institute for Aerospace Research | Ongoing A-base | In progress | 2010-11 |
Review of Evaluation Requirements Related to International Telescopes | Transfer Payment | In progress | 2009-10 |
Evaluation of Clean Air Initiative – Indoor Air Quality | Sunsetter Funding | In progress | 2010-11 |
Genomics Research and Development (R&D) Initiative | Sunsetter Funding | In planning stage | 2010-11 |
Roadmap for Canada's Linguistic Duality 2008-2013: Acting for the Future | Ongoing A-base | Planned | 2011-12 |
NRC's Industrial Research Assistance Program | Transfer Payment | Planned | 2011-12 |
Evaluation of the NRC Health and Related Life Sciences Technologies | Ongoing A-base | In planning stage | 2012-13 |
Evaluation of the Grant Program to Enhance Canadian S&T Capacity (Graduate Student Scholarship Supplement Program (GSSSP) and Herzberg Memorial Prize and Fellowship) | Transfer Payment | Planned | 2012-13 |
Evaluation of Information and Communications Technologies and Emerging Technologies Programs
|
Ongoing A-base | Planned | 2013-14 |
Facility for Sub-Atomic Research (TRIUMF) | Transfer Payment | Planned | 2013-14 |
Three Year Transfer Payment Program
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Accounts Receivable and Revenue Management | Assurance | Ongoing | Q1 10/11 |
IT Security (System Development Life Cycle) | Assurance | Planned | Q1 10/11 |
Major Project Management Office (MPMO) | Assurance | Planned | Q1 10/11 |
Nuclear Legacy Liability Program | Assurance | Ongoing | Q1 10/11 |
Physical security [*] | Assurance | Ongoing | Q1 10/11 |
ecoENERGY for Biofuels Program | Assurance | Planned | Q2 10/11 |
Accelerated Infrastructure Program – Follow-up Audit | Assurance | Planned | Fiscal Year 10/11 |
Accounting of capital assets | Assurance | Planned | Fiscal Year 10/11 |
ecoENERGY Retrofit – Home Owners – Follow-up Audit | Assurance | Planned | Fiscal Year 10/11 |
Felix System Under Development Audit | Assurance | Planned | Fiscal Year 10/11 |
HR Renewal | Assurance | Planned | Fiscal Year 10/11 |
Identity Management and Privacy Act | Assurance | Planned | Fiscal Year 11/12 |
Disaster Recovery for Mission Critical Applications and IT Infrastructure | Assurance | Planned | Fiscal Year 11/12 |
CANMET – Materials Technology Laboratory (MTL) Relocation | Assurance | Planned | TBD |
ecoENERGY Technology Initiative Program | Assurance | Planned | TBD |
Delineation of Canada's Continental Shelf (UNCLOS) initiative | Assurance | Planned | TBD |
Legislative and Regulatory Compliance for Information Holdings | Assurance | Planned | TBD |
Program Policy – Planning & Development Processes | Assurance | Planned | TBD |
Pulp and Paper Green Transformation Program (Black Liquor) | Assurance | Planned | TBD |
Purchases, Payables and Payments | Assurance | Planned | TBD |
Strategic Planning | Assurance | Planned | TBD |
Asset management – real property | Assurance | Planned | TBD |
Climate Change – Technology and Initiatives (T&I) | Assurance | Planned | TBD |
Efficiency and Alternative Energy Program | Assurance | Planned | TBD |
Federal Response – Mountain Pine Beetle | Assurance | Planned | TBD |
Financial System Renewal Initiative | Assurance | Planned | TBD |
First Nations Forestry Program | Assurance | Planned | TBD |
Geo-mapping (GEM) | Assurance | Planned | TBD |
NRCan's CESD Sustainable Development Strategy Commitments | Assurance | Planned | TBD |
Clean Energy Fund | Assurance | Planned | TBD |
Financial Statement Preparation and Reporting | Assurance | Planned | TBD |
Portfolio Review of Corporate Assets | Assurance | Planned | TBD |
Strengthening Canada's Nuclear Advantage | Assurance | Planned | TBD |
Electronic Link to Internal Audit and Evaluation Plan: http://nrcan.gc.ca/audit/reprap/reprap-eng.php.
[*] Departmental In-Reserve Audits – Audit Committee Consultation Required Prior to Implementation.
NB: Please note, audits listed as "planned" may be subject to changes due to shifting priorities based on annual evaluation of risk elements.
Name of Evaluation | Program Activity Architecture Link | Evaluation Type | Status | Target Completion Date |
---|---|---|---|---|
Port Hope Area Initiative Phase II | 2.2.4.2 | Formative | Planning | June 2011 |
Clean Energy Thematic Evaluation Report | 2.1 | Summative | Planning | March 2011 |
Forest-based Communities | 1.2.2 | Summative | Planning | March 2011 |
Forest Products | 1.1.3 | Summative | Planning | March 2011 |
Enhancing Resilience to Climate Change | 3.1.3.1 | Summative | Planning | March 2011 |
Major Projects Management Office | 3.2.5 | Summative | Planning | March 2011 |
Electronic Link to Evaluation Reports: http://nrcan.gc.ca/evaluation/reprap/reprap-eng.php
Electronic Link to Evaluation Plan: http://nrcan.gc.ca/evaluation/plans-eng.php
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
EAMS – New System Under Development (SUD) Audit | SUD | Planned | 2009-10 |
Audit of Corporate Information Management Practices | Compliance | Planned | 2009-10 |
Electronic link to audit reports: NSERC Internal Audits
In 2008-09, NSERC and SSHRC completed a merger of their internal audit units. The Internal Audit Team is currently developing a multi-year audit plan. |
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Tri-Agency (NSERC, SSHRC, CIHR) Evaluation of the Canada Research Chairs | Transfer Payment Program | In progress | 2010-11 |
Evaluation of Undergraduate Student Research Awards in University and in Industry | Transfer Payment Program | In progress | 2010-11 |
Evaluation of the Strategic Projects | Transfer Payment Program | In progress | 2010-11 |
Evaluation of NSERC Prizes | Transfer Payment Program | In progress | 2010-11 |
Evaluation of the Postdoctoral and Industrial Research and Development Fellowships | Transfer Payment Program | Planned | 2010-11 |
Evaluation of the Collaborative Health Research Projects | Transfer Payment Program | Planned | 2010-11 |
Formative Tri-Agency Evaluation of the Canada Excellence Research Chairs | Transfer Payment Program | Planned | 2010-11 |
Evaluation of PromoScience | Transfer Payment Program | Planned | 2011-12 |
Joint Review of Relevance and Effectiveness for the Strategic Networks and the Tri-Agency Business-Led Networks of Centres of Excellence | Transfer Payment Program | Planned | 2011-12 |
Evaluation of the Idea to Innovation Program | Transfer Payment Program | Planned | 2011-12 |
Evaluation of the Chairs in Targeted Areas of Research | Transfer Payment Program | Planned | 2011-12 |
Tri-Agency Evaluation of the Industrial R&D Internship Program | Transfer Payment Program | Planned | 2011-12 |
Tri-Agency Evaluation of the Centres of Excellence for Commercialization and Research | Transfer Payment Program | Planned | 2011-12 |
Tri-Agency Evaluation of the Canada Graduate Scholarships Program | Transfer Payment Program | Planned | 2012-13 |
Tri-Agency Evaluation of the Vanier Canada Graduate Scholarships Program | Transfer Payment Program | Planned | 2012-13 |
Evaluation of NSERC Industrial Postgraduate Scholarships Program and the NSERC Postgraduate Scholarships Program | Transfer Payment Program | Planned | 2012-13 |
Tri-Agency Evaluation of the College and Community Innovation Program | Transfer Payment Program | Planned | 2012-13 |
Evaluation of the Industrial Research Chairs | Transfer Payment Program | Planned | 2012-13 |
International Review of Discovery Grants | Transfer Payment Program | Planned | 2012-13 |
Evaluation of Research Partnership Agreements | Transfer Payment Program | Planned | 2012-13 |
Electronic link to evaluation plan: NSERC Program Evaluations
Name | Type | Status | Expected completion date |
---|---|---|---|
Internal audits1 | |||
Follow-up on the 2005 audit of hospitality expenses | Financial controls | In progress | May 2010 |
Practice reviews—recurring and periodic | |||
Periodic reviews1 | |||
Follow-up on the status of implementation of previous practice review recommendations | Follow-up | In progress | February 2010 |
The role of the information technology team in assisting annual audit teams | Review focusing on annual audit practice | Planned | To be determined |
Report on senior management involvement in the planning and conduct of audits | Review of all audit practices | Planned | To be determined |
Annual reviews | |||
Report on the review of the annual audit practice of the Office of the Auditor General of Canada | Compliance—annual audit practice | Summer 2010 | |
Report on the review of the performance audit practice of the Office of the Auditor General of Canada | Compliance—performance audit practice | ||
Report on the review of the special examination practice of the Office of the Auditor General of Canada | Compliance—special examination practice | ||
1 The Office has a rolling three-year Practice Review and Internal Audit Plan. Specific audits for 2011 and 2012 have not yet been approved by the Auditor General. They will be posted on our website after they are approved. |
The Practice Review and Internal Audit Plan can be found on the Office of the Auditor General website.
1. Name of Internal Audit | 2. Internal Audit Type (subject area) | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Supervision Sector: Supervision Operational Planning | Operational Planning | In-Progress | 2009-10 |
Corporate Services: Finance | Revenue Business Cycle | In-Progress | 2010-11 |
Corporate Services: Finance | Human Resources Payrol | In-Progress | 2010-11 |
Corporate Services: Information Management & Information Technology | Security Access | In-Progress | 2009-10 |
Corporate Services: Human Resources | Performance Management | 2009-10 Planned | 2010-11 |
Regulation Sector: Private Pensions Plans Division | Approvals | In-Progress | 2010-11 |
Superintendent's Office: Risk Management | Risk Management | 2010-11 Planned | 2010-11 |
Supervision Sector: Life Insurance Group - Conglomerates | Risk Assessment & Intervention | 2010-11 Planned | 2010-11 |
Supervision Sector: Supervision Support Group, Credit Risk Division | Risk Assessment & Intervention | 2010-11 Planned | 2010-11 |
Corporate Services: Finance | Contracting | 2010-11 Planned | 2010-11 |
Regulation Sector: Actuarial | Supervision Support | 2010-11 Planned | 2010-11 |
Supervision Sector: Deposit Taking Institutions – Conglomerates | Risk Assessment & Intervention | 2011-12 Planned | TBD |
Corporate Services: Finance | Travel & Hospitality | 2011-12 Planned | TBD |
Corporate Services: Human Resources | Training & Development | 2011-12 Planned | TBD |
Corporate Services: Information Management & Information Technology | Portfolio Management | 2011-12 Planned | TBD |
Regulation Sector: Private Pension Plans Division | Risk Assessment & Intervention | 2011-12 Planned | TBD |
Regulation Sector: Capital | Approvals | 2011-12 Planned | TBD |
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Financial and Administrative Audit Prince Edward Island Field Unit |
Assurance | Planned | March 2011 |
Financial and Administrative Audit Northern Ontario Field Unit |
Assurance | Planned | March 2011 |
Financial and Administrative Audit Western Arctic Field Unit |
Assurance | Planned | March 2011 |
Financial and Administrative Audit Waterton Lakes Field Unit |
Assurance | Planned | March 2011 |
Financial and Administrative Audit Atlantic Service Centre |
Assurance | Planned | March 2011 |
Financial and Administrative Audit Office of the CEO |
Assurance | Planned | March 2011 |
Audit of the Campground Reservation System and Point of Sale System | Assurance | Planned | March 2011 |
Audits of construction projects under the Economic Action Plan | Assurance | In-progress | March 2011 |
Audit of the Quebec 400th Anniversary | Assurance | Planned | September 2011 |
Audit of Twinning of Trans-Canada Highway | Assurance | Planned | March 2011 |
Audit of the Business Continuity Plan | Assurance | Planned | December 2011 |
Audit of Revenue Management (rentals and concessions) | Assurance | Planned | March 2011 |
Audit of the Law Enforcement Program | Assurance | Planned | March 2011 |
Financial and Administrative Audit National Historic Sites Directorate |
Assurance | Planned | March 2012 |
Financial and Administrative Audit Kooteney-Yoho-Lake Louise Field Unit |
Assurance | Planned | March 2012 |
Financial and Administrative Audit Riding Mountain Field Unit |
Assurance | Planned | March 2012 |
Financial and Administrative Audit Yukon Field Unit |
Assurance | Planned | March 2012 |
Financial and Administrative Audit Southwestern Ontario Field Unit |
Assurance | Planned | March 2012 |
Financial and Administrative Audit Saguenay- St-Laurent Field Unit |
Assurance | Planned | March 2012 |
Audit of Revenue Management |
Assurance | Planned | March 2012 |
Audit of the Information Centre on Ecosystems (ICE) | Assurance | Planned | March 2012 |
Financial and Administrative Audit New Brunswick South Field Unit |
Assurance | Planned | March 2013 |
Financial and Administrative Audit Western Quebec Field Unit |
Assurance | Planned | March 2013 |
Financial and Administrative Audit Nunavut Field Unit |
Assurance | Planned | March 2013 |
Financial and Administrative Audit Manitoba Field Unit |
Assurance | Planned | March 2013 |
Financial and Administrative Audit Banff Field Unit |
Assurance | Planned | March 2013 |
Financial and Administrative Audit Human Resources Directorate |
Assurance | Planned | March 2013 |
Electronic Link to Internal Audit Plan:
http://www.pc.gc.ca/docs/pc/rpts/rve-par/iap-2009-2010_e.asp
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Visitor Experience: Visitor Service Offer |
Program sub-activities | In progress | December 2010 |
National Parks Conservation (including Species at Risk) | Program sub-activity | Planned | September 2011 |
General Class Contribution Program | Horizontal funding mechanism: transfer payment | Planned | March 2011 |
National Park Establishment and Expansion | Program sub-activity | Planned | March 2012 |
National Historic Sites Cost Sharing | Program sub-sub-activity: contribution program | Planned | March 2012 |
National Historic Sites Conservation | Program sub-activity | Planned | September 2012 |
Public Appreciation and Understanding | Program activity | Planned | March 2013 |
Visitor Experience: Interpretation Programming | Program sub-activities | Planned | March 2013 |
National Marine Conservation Area Establishment | Program sub-activity | Planned | March 2014 |
Evaluation of Law Enforcement | Horizontal program covering more than one sub-activity | Planned | March 2014 |
National Marine Conservation Area Sustainability | Program sub-activity | Planned | March 2014 |
Trans-Canada Highway Twinning Project | Sub-element of Through Highway Management sub-activity | Planned | March 2014 |
Electronic link to evaluation plan:
http://www.pc.gc.ca/docs/pc/rpts/rve-par/ep-2009-2010_e.asp
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Evaluation of the Compliance and Enforcement Program | Regulation of the prices of patented drug products (core program) | Planned | March 31, 2012 |
Name of Internal Audit | Program Type | Status | Expected Completion Date |
---|---|---|---|
Compensation - Pay and Benefits | Assurance engagement | In progress | 2010-11 |
Business Continuity and Emergency Preparedness | Assurance engagement | Planned | 2010-11 |
Corporate Governance and Performance Management | Assurance engagement | Planned | 2010-11 |
Strategic HR Plan - Recruitment | Assurance engagement | Planned | 2010-11 |
Travel and Hospitality | Assurance engagement | Planned | 2010-11 |
Risk Management | Assurance engagement | Planned | 2011-12 |
Security | Assurance engagement | Planned | 2011-12 |
Financial Planning and Forecasting | Assurance engagement | Planned | 2011-12 |
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
There are no evaluations planned. | n/a | n/a | n/a |
Note: PCO is classified as a Small Department or Agency (SDA) under the Treasury Board Policy on Evaluation PCO. Application of the Policy to SDAs is deferred until otherwise directed by the President of the Treasury Board, with the exception of section 6.2. PCO will ensure the requirements identified in section 6.2 of the Policy on Evaluation are met; however no evaluations are planned at this time.
*As the Agency's Internal Audit Plan is being updated, only internal audits planned for 2010-11 are shown below.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Audit of Laboratory Management | Performance Audit | Planned | June 2010 |
Follow-up Audit of Delegation of Financial Authorities | Follow-up Audit | Planned | June 2010 |
Follow-up Audit of Office of Public Health Practice | Follow-up Audit | Planned | June 2010 |
Follow-up Audit of Human Resources Management | Follow-up Audit | Planned | June 2010 |
Audit of Information Technology Security | Compliance Audit | Planned | September 2010 |
Follow-up Audit of IM/IT Governance | Follow-up Audit | Planned | September 2010 |
Audit of Diabetes Programs | Performance Audit | Planned | December 2010 |
Audit of Healthy Living | Performance Audit | Planned | December 2010 |
Follow-up Audit of Real Property Management | Follow-up Audit | Planned | December 2010 |
Follow-up Audit of Payroll, Leave and Overtime Administration | Follow-up Audit | Planned | December 2010 |
Follow-up Audit of Management of Interchange Program | Follow-up Audit | Planned | December 2010 |
Audit of Science and Scientific Research | Performance Audit | Planned | March 2011 |
5. Electronic Link to Internal Audit Plan: N/A
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Public Health Scholarship and CapacityBuilding Program | Transfer payment | In progress | September 2010 |
Canadian HIV Vaccine Initiative | Transfer payment | In progress | 2010-11 |
Avian Influenza and Pandemic Influenza Preparedness including Mock Vaccine and Regulatory Capacity | Transfer payment | Planned | December 2011 |
Integrated Strategy on Healthy Living and Chronic Disease | Transfer payment | Planned | To be determined |
Federal Initiative to Address HIV/AIDS in Canada | Transfer payment | Planned | To be determined |
Hepatitis C Prevention, Support & Research Program | Transfer payment | Planned | To be determined |
National Collaborating Centres for Public Health | Transfer payment | Planned | To be determined |
National Immunization Strategy | Transfer payment | Planned | To be determined |
Electronic link to evaluation plan: http://www.phac-aspc.gc.ca/about_apropos/evaluation-eng.php
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Acquisition Card Program | Assurance | Completed | Completed2 |
Contracting and Procurement | Assurance | Completed | Completed2 |
Travel | Assurance | Planned | August 2010 |
National Crime Prevention Strategy | Assurance | Initiated | September 2010 |
Audit of the Expenditures related to Grants and Contributions Programs | Assurance | Initiated | August 2010 |
Advisory Services on the Control Framework for the Policing Infrastructure Fund in support of the Economic Action Plan | Advisory | Ongoing | Ongoing |
Electronic Link to Internal Audit and Evaluation Plan:
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
2009-10 Interim Evaluation of the Youth Gang Prevention Fund | National Crime Prevention Strategy | Ongoing | March 2010 |
2009-10 Formative Evaluation of the Security Infrastructure Program | National Crime Prevention Strategy | Ongoing | March 2010 |
2009-10 Evaluation of the Securities Certificates Initiative | Multi-year funding | Ongoing | August 2010 |
2009-10 Evaluation of the First Nations Policing Program | First Nations Policing Program | Ongoing | July 2010 |
2009-10 Evaluation of the Integrated Market Enforcement Teams | Multi-year funding | Ongoing | July 2010 |
2009-10 Evaluation of the Effective Corrections Initiative | Multi-year funding | Initiated | August 2010 |
2009-10 Evaluation of the Investments to Combat the Criminal Use of Firearms | Multi-year funding | Initiated | October 2010 |
2010-11 Evaluation of the Workers Compensation Program | Joint Emergency Preparedness Program | Planned | March 2011 |
2010-11 Evaluation of the Youth Gang Prevention Fund | National Crime Prevention Strategy | Planned | March 2011 |
2010-11 Evaluation of the Great Lakes/St. Lawrence Marine Security Operations | Multi-year funding | Planned | March 2011 |
2011-12 Evaluation of the Disaster Financial Assistance Program | Disaster Financial Assistance Arrangements | Planned | March 2012 |
Electronic link to evaluation plan:
1Internal Audit has posted a Request for Proposal for the provision of risk-based audit consultants to research, develop and produce a Risk-based Audit Plan that will cover the next three fiscal years.
2To be approved by the Departmental Audit Committee.
The PSC has an established internal audit function, working within an environment bounded by professional standards and TBS policies. The function also receives guidance and input from its independent Internal Audit Committee. The PSC posts all completed audits on its Web site at www.psc-cfp.gc.ca/abt-aps/inta-veri/index-eng.htm. The table below gives the status of audits planned for 2009-2010 and those not yet complete. It also shows the outlook for audits to be completed over the next three years. We reassess risks annually as part of our audit planning process. Consequently, the outlook may be revised to reflect changes to overall risks, controls and commitments over this time frame.
Name of Internal Audit | Type of internal audit | Status | Expected Completion Date |
---|---|---|---|
Implementation of Service Transformation – Staffing and Assessment Services Branch | Program management | under way | Q4 – 2009-2010 |
HR Special Projects – PeopleSoft | Project management | under way | Q1 – 2010-2011 |
Access to Information and Privacy | Fundamental controls | planned | Q3 – 2010-2011 |
Financial Statement – Cyclical 3 | Financial reporting | planned | Q2 – 2010-2011 |
Appointment Priority Administration | Program management | outlook | Q4 – 2010-2011 |
Audit and Data Services Branch Management | Fundamental controls | outlook | Q1 – 2011-2012 |
Financial Statement – Cyclical 4 | Financial reporting | outlook | Q2 – 2011-2012 |
Cost Recovery | Fundamental controls | outlook | Q4 – 2011-2012 |
Test Services | Program management | outlook | Q1 – 2012-2013 |
Financial Statement – Cyclical 5 | Financial reporting | outlook | Q2 – 2012-2013 |
Horizontal audits (various, led by the Office of the Comptroller General) | Fundamental controls | TBD | As directed by the OCG, who will identify organizations to be included in audits at the start of each audit |
Electronic link to internal audit plan:
www.psc-cfp.gc.ca/abt-aps/inta-veri/index-eng.htm
The PSC's Policy on Evaluation, 2009 was approved in June 2009 and reflects the priorities of the PSC and changes made to the TBS Policy on Evaluation, 2009 as it pertains to the PSC.
The rolling Risk-based PSC 5-Year Evaluation Plan 2009-2014 was recently updated to take into consideration emerging issues and priorities and to show progress towards increased evaluation coverage. The approved Plan is strategically integrated into the PSC's overall management activities and supports decision-making with the generation of strategically focused, objective and evidence-based information about the performance of the policies, programs and initiatives of the PSC as an organization. We assess risk regularly as part of our annual planning process.
The PSC posts all completed evaluations on its Web site at www.psc-cfp.gc.ca/index-eng.htm.
The table below shows the outlook for evaluations to be completed over the next three years.
Name of evaluation | PAA link | Status | Expected Completion Date |
---|---|---|---|
Central Recruitment Programs - RAP/Coop/FSWEP | Staffing Services and Assessment | planned | 2010-2011 |
Assessment methods - Reference Checks | Appointment Integrity and Political Neutrality | planned | 2010-2011 |
EX-Resourcing | Staffing Services and Assessment | planned | 2010-2011 |
IM Project and Strategy | Internal Services | planned | 2011-2012 |
Political Activities |
Appointment Integrity and Political Neutrality | planned | 2011-2012 |
General Recruitment (Sector Framework) |
Staffing Services and Assessment | planned | 2012-2013 |
Delegated Authorities and Strategic Staffing | Appointment Integrity and Political Neutrality | planned | 2012-2013 |
Electronic link to the PSC's Five-year Evaluation Plan 2009-2014:
www.psc-cfp.gc.ca/index-eng.htm
1. Name of Internal Audit | 2. Internal Audit Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
Attest Audit of the Financial Statements for the Translation Bureau Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Attest Audit of the Financial Statements for the Real Property Disposition Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Attest Audit of the Financial Statements for Consulting and Audit Canada Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Attest Audit of the Financial Statements for the Telecommunications and Informatics Common Services Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Attest Audit of the Financial Statements for the Optional Services Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Attest Audit of the Financial Statements for the Real Property Services Revolving Fund for Fiscal Year ended March 31, 2010 | Financial | Planned | September 2010 |
Annual Attest Audit of the Financial Report of Administrative Costs Chargeable to the Canada Pension Plan for Fiscal Year ended March 31, 2010 | Financial | Planned | December 2010 |
Attest Audit of the Financial Statements for the Translation Bureau Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Attest Audit of the Financial Statements for the Real Property Disposition Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Attest Audit of the Financial Statements for Consulting and Audit Canada Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Attest Audit of the Financial Statements for the Telecommunications and Informatics Common Services Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Attest Audit of the Financial Statements for the Optional Services Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Attest Audit of the Financial Statements for the Real Property Services Revolving Fund for Fiscal Year ended March 31, 2011 | Financial | Planned | September 2011 |
Annual Attest Audit of the Financial Report of Administrative Costs Chargeable to the Canada Pension Plan for Fiscal Year ended March 31, 2011 | Financial | Planned | December 2011 |
Attest Audit of the Financial Statements for the Translation Bureau Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Attest Audit of the Financial Statements for the Real Property Disposition Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Attest Audit of the Financial Statements for Consulting and Audit Canada Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Attest Audit of the Financial Statements for the Telecommunications and Informatics Common Services Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Attest Audit of the Financial Statements for the Optional Services Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Attest Audit of the Financial Statements for the Real Property Services Revolving Fund for Fiscal Year ended March 31, 2012 | Financial | Planned | September 2012 |
Annual Attest Audit of the Financial Report of Administrative Costs Chargeable to the Canada Pension Plan for Fiscal Year ended March 31, 2012 | Financial | Planned | December 2012 |
5. Electronic Link to Internal Audit Plan:
The PWGSC Risk-based Multi-year Audit and Evaluation Plan will be tabled at the Audit and Evaluation Committee in 2009-2010 and approved by the Deputy Minister. Approved audit reports will be posted on the following PWGSC internet site: www.tpsgc-pwgsc.gc.ca/bve-oae/index-eng.html for the English page and www.tpsgc-pwgsc.gc.ca/bve-oae/index-fra.html for the French page.
1. Name of Evaluation | 2. Program Type | 3. Status | 4. Expected Completion Date |
---|---|---|---|
5. Electronic link to evaluation plan:
The PWGSC Risk-based Multi-year Audit and Evaluation Plan will be tabled at the Audit and Evaluation Committee in 2009-2010 and approved by the Deputy Minister. Approved evaluation reports will be posted on the following PWGSC internet site: www.tpsgc-pwgsc.gc.ca/bve-oae/index-eng.html for the English page and www.tpsgc-pwgsc.gc.ca/bve-oae/index-fra.html for the French page.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Canada Firearm Centre – Management Control Framework |
Operational Assurance Engagement | In progress | February 2010 |
International Peace Operations |
Operational Assurance Engagement | In progress | April 2010 |
Communications |
Operational Assurance Engagement | In progress | April 2010 |
Directed Audit of the Sensitive Expenditures – Fiscal Year 2008-2009 |
Operational Assurance Engagement | In progress | September 2010 |
Capital Assets |
Operational Assurance Engagement | In progress | November 2010 |
Directed Audit of the Sensitive Expenditures– Fiscal Year 2009-2010 |
Operational Assurance Engagement | Planning | December 2010 |
2010 Olympic Games Operational Security Financial Expenditures |
Financial Assurance Engagement |
Planning | December 2010 |
Business Continuity Planning (BCP) |
Operational Assurance Engagement | Planning | 2011 |
Directed Investment Plan Goods & Services Contracts Audit | Operational Assurance Engagement | Planning | 2011 |
Personnel Security | Operational Assurance Engagement | Planning | 2011 |
Quality of Human Resources Personnel Data | Operational Assurance Engagement | Planning | 2011 |
Technological Crime Program | Operational Assurance Engagement | Planning | 2011 |
Electronic Link to Internal Audit and Evaluation Plan:
N/A
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Vancouver 2010 Olympics Games Security and Public Saftey – Impact Evaluation | Major Event | Planning Stage | March 31, 2011 |
G8/G20 Security Impact Evaluation | Major Event | Planning Stage | March 31, 2011 |
Note: As per the TBS Policy on Evaluation (April 2009), the RCMP is currently in the process of developing a five-year rolling plan designed to cover 100% of direct spending. It is anticipated that this plan will be presented to the Commissioner's Evaluation Committee (CEC) for approval in June 2010 and subsequently to the TBS Centre for Excellence in Evaluation (CEE). An update on the development of this plan will be provided in the 2010-2011 Departmental Performance Report.
Electronic link to evaluation plan:
N/A
All upcoming internal audits over the next three fiscal years.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Grant and Fellowship Budget Process Review | Advisory | Completed | September 2009 |
Audit of Information Management | Assurance | In progress | June 2010 |
Audit of the Enterprise Awards Management System | Assurance | In progress | February 2010 |
Audit of Management of Human Resources | Assurance | Planned | September 2010 |
All upcoming evaluations over the next three fiscal years.
Name of Evaluation | Program Type |
Status | Expected Completion Date |
---|---|---|---|
Summative Evaluation of the Canada Graduate Scholarships Program | Transfer payment | Planned | 2012-13 |
Summative Evaluation of the Vanier Canada Graduate Scholarships Program | Transfer payment | Planned | 2012-13 |
Summative Evaluation of the Postdoctoral Fellowships Program | Transfer payment | In progress | 2010-11 |
Summative Evaluation of the Prizes and Special Fellowships Programs | Transfer payment | Planned | 2010-11 |
Summative Evaluation of the Canada Research Chairs Program | Transfer payment | In progress | 2010-11 |
Evaluation of the Canada Excellence Research Chairs Program | Transfer payment | Planned | 2012-13 |
Summative Evaluation of the Major Collaborative Research Initiatives Program | Transfer payment | Planned | 2011-12 |
Summative Evaluation of Strategic Research Grants Programs | Transfer payment | Planned | 2011-12 |
Summative Evaluation of the Social Economy Suite | Transfer payment | Planned | 2010-11 |
Summative Evaluation of the Community-University Research Alliances Program | Transfer payment | Planned | 2011-12 |
Summative Evaluation of the SSHRC Institutional Grants Program | Transfer payment | In progress | 2010-11 |
Summative Evaluation of the Aid to Small Universities Program | Transfer payment | In progress | 2010-11 |
Summative Evaluation of the Other Strategic Research Development Programs | Transfer payment | Planned | 2010-11 |
Summative Evaluation of the Research Publishing Programs | Transfer payment | Planned | 2010-11 |
Summative Evaluation of the International Opportunities Fund Program | Transfer payment | In progress | 2010-11 |
Summative Evaluation of the Knowledge Translation Programs | Transfer payment | Planned | 2011-12 |
Summative Evaluation of the Research Events Programs | Transfer payment | Planned | 2010-11 |
Review of the Business-Led Networks of Centres of Excellence Program | Transfer payment | In progress | 2011-12 |
Review of the Centres of Excellence for Commercialization and Research Program | Transfer payment | Planned | 2011-12 |
Summative Evaluation of the Industrial Research and Development Internship | Transfer payment | Planned | 2011-12 |
Summative Evaluation of the College and Community Innovation Program | Transfer payment | Planned | 2012-13 |
Summative Evaluation of the Strategic Knowledge Clusters Program | Transfer payment | Planned | 2011-12 |
Summative Evaluation of Funding in the Theme Area of Management, Business and Finance | Transfer payment | Planned | 2011-12 |
Summative Evaluation of Funding in the Theme Area of Canadian Environmental Issues | Transfer payment | Planned | 2012-13 |
Summative Evaluation of Funding in the Theme Area of Northern Communities: Towards Social and Economic Prosperity | Transfer payment | Planned | 2012-13 |
The information provided above is drawn from SSHRC's evaluation plan, available online. The plan is subject to change.
Name of internal audit | Internal audit type | Status | Expected completion date |
---|---|---|---|
Confidentiality of Sensitive Statistical Information | Program | Completed | Tabled at DAC September 2009 |
Asset Protection and Life Cycle Mangement | Financial | Completed | Tabled at DAC September 2009 |
Data Sharing Agreement | Program | In progress | May 2010 |
IT Framework and Contracting Expenditures | Management Accountability Framework | In progress | May 2010 |
Research Data Centre | Program | In progress | September 2010 |
Notes: DAC is the Departmental Audit Committee. The updated multiyear (2010/2011 to 2012/2013) risk-based audit plan is currently being developed. Several audits are proposed and will receive final approval in April 2010 at the DAC. |
Statistics Canada has a unique system of ongoing evaluation of all its statistical and corporate services programs. Each group at Statistics Canada prepares a thorough quadrennial program review that identifies accomplishments, challenges and future priorities along with users' satisfaction of services provided. Biennial program reports update the quadrennial program reviews at midcycle. The following table provides a list of the program evaluations over the next three fiscal years.
Program | Expected completion date | ||
---|---|---|---|
2010/2011 | 2011/2012 | 2012/2013 | |
Evaluation type | |||
1Economic Statistics | |||
1.1.1 Income and Expenditure Accounts | BPR | ... | QPR |
1.1.2 Environment Accounts and Statistics | QPR | ... | BPR |
1.1.3 Balance of Payments | ... | QPR | ... |
1.1.4 Public Institutions Statistics | ... | QPR | ... |
1.1.5 Industry Accounts | BPR | ... | QPR |
1.2.0 Analytical Studies | BPR | ... | QPR |
1.3.1 Manufacturing, Construction and Energy Statistics | QPR | ... | BPR |
1.3.2 Distributive Trades Statistics | ... | QPR | ... |
1.3.3 Service Industries Statistics | BPR | ... | QPR |
1.4.1 Prices Statistics | ... | BPR | ... |
1.4.2 International Trade Statistics | ... | BPR | ... |
1.4.3 Investment and Capital Stock Statistics | ... | QPR | ... |
1.4.4 Industrial Organization and Finance Statistics | BPR | ... | QPR |
1.5.1 Agriculture Statistics | ... | BPR | ... |
1.5.2 Small Business and Special Surveys | QPR | ... | BPR |
1.5.3 Science, Innovation and Electronic Information Statistics | ... | BPR | ... |
1.5.4 Transportation Statistics | BPR | ... | QPR |
2 Social Statistics | |||
2.1.1 Justice Statistics | ... | QPR | ... |
2.1.2 Culture Statistics | QPR | ... | BPR |
2.1.3 Tourism Statistics | QPR | ... | BPR |
2.1.4 Education Statistics | QPR | ... | BPR |
2.2.0 Health Statistics | QPR | ... | BPR |
2.3.0 General Social Characteristics Statistics | ... | BPR | ... |
2.4.1 Special Surveys | ... | QPR | ... |
2.4.2 Income Statistics | ... | BPR | ... |
2.4.3 Labour and Household Surveys Analysis | QPR | ... | BPR |
2.4.4 Labour Statistics | ... | QPR | ... |
2.5.0 Socioeconomic Analysis | ... | QPR | ... |
3 Census, Demography and Aboriginal Statistics | |||
3.2.0 Demography | ... | BPR | ... |
3.3.0 Aboriginal Statistics | ... | BPR | ... |
4 Internal Services | |||
4.1.1 Management and Oversight Services | BPR | ... | QPR |
4.1.2 Communications Services | QPR | ... | BPR |
4.2.1 Human Resources Management Services | ... | BPR | ... |
4.2.2 Financial Management Services | ... | QPR | ... |
4.2.3 Information Management Services | QPR | ... | BPR |
4.3.1 Materiel Services | QPR | ... | BPR |
4.3.2 Acquisition Services | BPR | ... | QPR |
5 Corporate Infrastructure Services1 | |||
Methodology | ... | BPR | ... |
Standards | QPR | ... | BPR |
Geography | ... | QPR | ... |
Collection and Regional Services | BPR | ... | QPR |
Collection Systems and Infrastructure | BPR | ... | QPR |
Systems Development | BPR | ... | QPR |
Information Technology Systems | QPR | ... | BPR |
Operations and Integration | ... | BPR | ... |
Tax Data | QPR | ... | BPR |
Business Register | BPR | ... | QPR |
Enterprise Statistics | ... | QPR | ... |
1. Corporate Infrastructure Services
are defined as costs that cannot be linked to a specific program subactivity. … not applicable |
1. Name of internal audit |
2. Internal audit type |
3. Status |
4. Expected completion date |
---|---|---|---|
Review of the Women's Program files | A sampling of the Women's Program files to ensure due diligence and the availability of complete, accurate and up-to-date information on project implementation and results. | Planned | Fall 2010 |
1. Name of evaluation |
2. Program type |
3. Status |
4. Expected completion date |
---|---|---|---|
Summative evaluation of the Women's Program | Transfer payments | Planned | January 2011 |
All upcoming Internal Audits over the next three fiscal years
Audit and Advisory Services has developed an audit plan for 2009-2010 to 2011-2012, which was approved by the Departmental Audit Committee (DAC) in June 2009. The audit plan is reviewed yearly, which may result in revisions, updates or changes as required or requested by the DAC. Potential internal audits are identified based on a detailed assessment of risks and controls and take into account external audits conducted by the Office of the Auditor General, the Office of the Comptroller General, the Public Service Commission, etc. Internal audits examine issues related to governance, risk management and controls in support of the department's strategic objectives, programs, activities and management processes. As per government policy, audit reports are posted on Transport Canada's web-site, subject to the provisions of the Access to Information Act and the Privacy Act.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Marine Security Contribution Program |
Assurance | Near completion | January 2010 |
Financial Controls- Grants and Contributions | Assurance | Near completion | January 2010 |
Horizontal Review of Grants and Contributions Audits | Advisory | Near completion | January 2010 |
Environmental Contribution Programs- Freight Sustainability Demonstration Program (FSDP), Urban Transportation Showcase Program (UTSP) | Assurance | Near completion | January 2010 |
Economic Action Plan – Audit Readiness and Governance Review | Advisory and Assurance | In progress | April 2010 |
Financial Controls – Revenue | Assurance | In progress | April 2010 |
Financial Controls - Procurement | Assurance | Planned | January 2011 |
Marine Safety Delegation of Authority | Assurance | Planned | January 2011 |
Aviation Security Regulatory Oversight | Assurance | Planned | January 2011 |
Future internal audit activities for 2010/11 and 2011/12 including specific audit activities, objectives, scope and issues will be identified in consultation with program and senior management, as well as through a reassessment of risk factors.
Electronic Link to Internal Audit and Evaluation Plan: Audit and Advisory Services' three-year risk-based
audit plan covering the period for 2009/10 to 2011/12 is available on the department's website at the following link:
http://www.tc.gc.ca/eng/corporate-services/aas-audit-62.htm
Departmental Evaluation Services will conduct the following evaluations in 2010-2011:
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Evaluation of Airport Infrastructure programs | Cluster evaluation: A-base and a contribution program | In Progress | 2010-2011 |
Horizontal Evaluation of the Asia-Pacific Gateway and Corridor Initiative (APGCI) | Horizontal evaluation: A-base and four contribution programs | Planned | March 2011 |
Evaluation of TC's Grant to the province of British Columbia for the provision of ferry services | Grant | Planned | March 2011 |
Evaluation of Moving on Sustainable Transportation Program | Contribution program | Planned | March 2011 |
Evaluation of the Divestiture of Marine Training Assets Program | Contribution program | Planned | March 2011 |
Evaluation of Rail Safety Program Activity | A-base | Planned | March 2012 |
Summative evaluation of the Security and Public Safety at the Vancouver 2010 Winter Games (led by RCMP) | Horizontal evaluation: A-base and a contribution program | Planned | March 2011 |
Evaluation of Marine Security Program Activity | Cluster evaluation: A-base and a contribution program | Planned | March 2012 |
Horizontal evaluation of the clean air agenda transportation theme | Cluster evaluation: A-base and a contribution program | Planned | March 2012 |
Electronic Link to Internal Evaluation Reports:
http://www.tc.gc.ca/eng/corporate-services/des-reports-150.htm
Departmental Evaluation Services plans to conduct the following evaluations in 2011-2012:
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Evaluation of the Gateways and Border Crossings Fund | Contribution program | Planned | March 2013 |
Evaluation of Marine Infrastructure programs | Cluster evaluation:A-base and a contribution program | Planned | March 2013 |
Evaluation of Port Operations | Contribution program | Planned | March 2013 |
Evaluation of the Transportation Association of Canada (TAC) multi-year Transfer Payment Program | Contribution program | Planned | March 2012 |
Evaluation of Transportation Innovation Program Activity | Cluster evaluation: A-base and a contribution program | Planned | March 2012 |
Evaluation of Clean Water from Transportation as part of the Evaluation of the Health of Oceans – led by DFO | A-base | Planned | March 2012 |
Evaluation of Aviation Safety Program Activity | A-base | Planned | March 2013 |
Evaluation of Aviation Security Program Activity | Cluster evaluation : A-base and a contribution program | Planned | March 2013 |
Electronic Link to Internal Evaluation Reports:
http://www.tc.gc.ca/eng/corporate-services/des-reports-150.htm
Departmental Evaluation Services plans to conduct the following evaluations in 2012-2013:
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Evaluation of the Labrador Coast Airstrips | Contribution Program | Planned | March 2013 |
Evaluation of Federal Bridge Stewardship | Contribution Program | Planned | March 2013 |
Evaluation of the administrative aspect of delivering Infrastructure projects | A-base | Planned | March 2013 |
Evaluation of Recreational Boating Safety | Contribution program | Planned | March 2013 |
Evaluation of Rail Safety Outreach | Cluster evaluation: 3 contribution programs | Planned | March 2013 |
Evaluation of Motor Carrier Safety Program | Cluster evaluation: 2 contribution programs | Planned | March 2013 |
Electronic Link to Internal Evaluation Reports:
http://www.tc.gc.ca/eng/corporate-services/des-reports-150.htm
The following audits were included in the Risk-Based Audit Plan 2009–12 approved in June 2009. An annual review and update on planned audit engagements may result in modification to audit engagements conducted.
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Operational Effectiveness Testing of High-Risk Financial Reporting Controls | Assurance | Planned | December 2010 |
Audit of Management of Public Sector Pension Plans | Assurance | Planned | March 2011 |
Audit of Budget Office Systems Renewal | Assurance | Planned | March 2011 |
Audit of Security of Information and Information Technology | Assurance | Planned | March 2011 |
Audit of Business Continuity Planning and Emergency Preparedness | Assurance | Planned | March 2012 |
Audit of Management of Contracting | Assurance | Planned | March 2012 |
Audit of Risk Management Framework | Assurance | Planned | March 2012 |
Listed below are all upcoming evaluations over the next three fiscal years. The following evaluations were included in the 2008–13 TBS 5-year Evaluation Plan. An annual review and update on planned evaluations may result in modification for evaluations to be conducted.
Name of Internal Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Strategic Investment Framework | Initiative | In progress | May 2010 |
Policy on Internal Audit | Policy | Planned | October 2010 |
Joint Learning Program | Initiative | Planned | March 2011 |
Policy Monitoring | Ongoing | Planned | July 2011 |
International Public Sector Standards Accounting Board | Contributions | Planned | March 2011 |
Management of Pensions and Employee Benefits | Ongoing | Planned | March 2012 |
Compensation Management | Ongoing | Planned | March 2012 |
Accrual Budgeting and Appropriations | Initiative | Planned | March 2013 |
Results-Based Management and Evaluation | Ongoing | Planned | March 2013 |
Management of Government Security | Ongoing | Planned | March 2013 |
Management of Central Funds | Ongoing | Planned | March 2013 |
Internal Audit commitments April 1, 2010 to March 31, 2013*
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Core Management Controls | Review | To begin in 2010 | Spring 2010 |
Veterans Health Related Travel | Program Audit | Draft Completed | January 2010 |
Employee Compensation | Internal Audit | Draft Completed | January 2010 |
Veterans Independence Program | Program Audit | Report being drafted | January 2010 |
Responsibility Centre | Internal Audit | Planning begun | July 2010 |
FHCPS Cash Management | Internal Audit | To begin in 2010 | 2010 |
Vocational Rehabilitation | Program Audit | To begin in 2010 | 2010 |
Federal Health Care Partnership | Internal Audit | To begin in 2010 | 2010 |
Resource Management | Internal Audit | To begin in 2010 | 2010 |
Ste. Anne's Hospital Medications | Program Audit | To begin in 2010 | 2010 |
Information Quality | Internal Audit | To begin in 2010 | 2010 - 2011 |
Travel and Hospitality Expenditures and Pro-Active Disclosure | Internal Audit | To begin in 2010 | 2010 - 2011 |
Program Policies, Benefits and Authorities | Internal Audit | To begin in 2011- 2012 | 2011 - 2012 |
Residential Care - Community Facilities | Program Audit | To begin in 2011- 2012 | 2011 - 2012 |
Canada Remembers - Partnering with the Private Sector | Program Audit | To begin in 2011- 2012 | 2011 - 2012 |
Disability Awards | Program Audit | To begin in 2011- 2012 | 2011 - 2012 |
Earnings Loss | Program Audit | To begin in 2011- 2012 | 2011 - 2012 |
Third-Party Administered Accounts | Internal Audit | To begin in 2011- 2012 | 2011 - 2012 |
Governance - Planning and Decision-Making Structure | Internal Audit | To begin in 2011- 2012 | 2011 - 2012 |
Ex-Gratia Payments | Internal Audit | To begin in 2011- 2012 | 2011 - 2012 |
Electronic Link to Report - Audit and Evaluation Reports are posted on the Veterans Affairs Canada Web site when completed: www.vac-acc.gc.ca/general/sub.cfm?source=department/reports/deptaudrep
* Internal Audits based on approved Audit and Evaluation Division Audit Plan 2009-2013
Audit and Evaluation Division Evaluation commitments April 1, 2010 to March 31, 2013.
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Evaluation of the Human Resources Function: Departmetnal Integrated HR Planning | Direct Spending | To begin March 2010 | June 2010 |
Evaluation of the New Veterans Charter Programs - Phase 2 | Grants and Contributions | In Progress | September 2010 |
Evaluation of the New Veterans Charter Programs - Phase 3 | Grants and Contributions | Planned | December 2010 |
Evaluation of the Mental Health Strategy | Strategic Policy Development | To begin April 2010 | December 2010 |
Evaluation of Case Management | Grants and Contributions | To begin April 2010 | December 2010 |
Evaluation of the Veterans Independence Program | Grants and Contributions | To begin in 2010 | January 2011 |
Long Term Care Evaluation | Grants and Contributions | To begin April 2011 | December 2011 |
Evaluation of Departmental Performance Management | Direct Program Spending | To begin April 2011 | December 2011 |
Evaluation of Partnership Contribution Program | Grants and Contributions | April 2011 | December 2011 |
Evaluation of Federal Health Partnerships | Quasi Statutory | July 2011 | March 2012 |
Treatment Benefits and Services Evaluation | Quasi Statutory | July 2011 | March 2012 |
Evaluation of Canada Remembers - Remembrance Outreach | Direct Program Spending | July 2011 | March 2012 |
Evaluation of Bureau of Pensions Advocates | Direct Program Spending | April 2012 | December 2012 |
Assistance Services and Health Insurance and Health Related Services Evaluation | Quasi Statutory | April 2012 | December 2012 |
Forecasting and Data Analysis Evaluation | Direct Program Spending | April 2012 | December 2012 |
Cemetery and Grave Maintenance and Memorials Evaluation | Grants and Contributions | July 2012 | March 2013 |
Evaluation of VAC Policy Development and Support | Direct Program Spending | July 2012 | March 2013 |
Evaluation of the Office of Veterans Ombudsman | Direct Program Spending | July 2012 | March 2013 |
Evaluation Consulting and Assistance Services | Direct Program Spending | April 2012 | March 2013 |
Electronic Link to Report - Audit and Evaluation Reports are posted on the Veterans Affairs Canada Web site when completed: www.vac-acc.gc.ca/general/sub.cfm?source=department/reports/deptaudrep
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Governance | Management Audit | Planned | December 2010 |
Grants and Contributions - Monitoring and Payments | Management Audit | Planned | December 2010 |
Grants and Contributions - Performance Information | Management Audit | Planned | December 2010 |
Mountain Pine Beetle | Program Audit | Planned | December 2010 |
Canada Business Service Centres | Program Audit | Planned | March 2011 |
Information Management and Technology Governance | Management Audit | Planned | March 2011 |
Infrastructure Programs | Program Audit | Planned | March 2011 |
Follow-up on past recommendations | Follow-up | Planned | September 2010 March 2011 |
Grants and Contributions - Budget 2009 Initiatives | Program Audit | Planned | March 2012 |
Grants and Contributions - Due Diligence Approval Process | Management Audit | Planned | December 2011 |
Conditional Grants | Program Audit | Planned | December 2011 |
Urban Development Agreements | Program Audit | Planned | March 2012 |
Financial Analysis and Reporting | Management Audit | Planned | December 2011 |
Performance Accountability | Management Audit | Planned | March 2012 |
Learning and Change Management | Management Audit | Planned | December 2011 |
Follow-up on past recommendations | Follow-up | Planned | September 2011 March 2012 |
Electronic Link to Audit and Evaluation Plan: http://www.wd-deo.gc.ca/eng/59.asp
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Mountain Pine Beetle Initiative | Impact Evaluation | Planned | March 2011 |
Entrepreneurs with Disability Initiative | Impact Evaluation | Planned | March 2011 |
Community Adjustment Fund and Recreational Infrastructure | Impact Evaluation | Planned | March 2012 |
Western Economic Partnership Agreement | Impact Evaluation | Planned | March 2012 |
Western Diversification Program: Community Economic Development, Entrepreneurship and Innovation | Impact Evaluation | Planned | March 2013 |
Women's Entreprise Initiative | Impact Evaluation | Planned | March 2013 |
Francophone Economic Development Organizations | Impact Evaluation | Planned | March 2013 |
Electronic Link to Audit and Evaluation Plan: http://www.wd-deo.gc.ca/eng/59.asp