Treasury Board of Canada Secretariat
Symbol of the Government of Canada

ARCHIVED - Immigration and Refugee Board of Canada

Warning This page has been archived.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.





2008-09
Departmental Performance Report



Immigration and Refugee Board of Canada






The original version was signed by
The Honourable Jason Kenney
Minister of Citizenship, Immigration and Multiculturalism






Table of Contents

Message from the Chairperson

Section I – Overview

Section II – Analysis of Program Activities

Section III – Supplementary Information



Message from the Chairperson

Brian Goodman, Chairperson

I am pleased to present the 2008-09 Performance Report for the Immigration and Refugee Board of Canada (IRB). This report is a balanced and comprehensive review of the IRB's performance and accomplishments as set against stated plans and priorities for 2008-09.

The IRB is an independent tribunal entrusted by Parliament with the resolution of immigration and refugee cases efficiently, fairly and in accordance with the law. Through the work of its three divisions, namely the Refugee Protection Division (RPD), the Immigration Division (ID) and the Immigration Appeal Division (IAD), the Board contributes directly to Canada's humanitarian traditions, the security of Canada and the quality of life of Canadians.

2009 marks the 20th anniversary year of the IRB. I take this opportunity to recognize the dedication, professionalism and integrity of our personnel, who are vital to the Board's success in fulfilling its mission and ensuring that it maintains the trust and confidence of those who appear before it, Parliament and the Canadian public.

The Board continued to experience workload challenges in 2008-09, marked by a rising intake in all three divisions and a shortfall in its complement of Governor in Council (GIC) decision-makers in the RPD and the IAD. Although appointments and reappointments accelerated sharply toward the end of the reporting period, the pending inventory and average case processing time have nonetheless continued to grow in both divisions.

Our transformation agenda

The IRB is committed to maximizing the efficiency of its operations. To this end, it continued to pursue a multi-faceted transformation agenda, which included cross-divisional integration, internal process enhancements and integrated adjudicative support. With a focus on early resolution and innovative adjudicative and case management strategies, the Board has achieved significant improvements in decision-maker productivity, without compromising fairness.

Delivering results for Canadians

All three divisions finalized more cases than projected in 2008-09. Productivity was especially high in the ID, which concluded the largest number of admissibility hearings and detention reviews since 2001-02. Quality of decision-making also continued to be a priority over the year, with the proportion of decisions set aside by the Federal Court and sent back to the Board to be reheard remaining at less than one percent.

Improved governance

Following a wide-ranging review of its governance framework in 2007-08, the Board made a number of changes to its management structures during the reporting period to reinforce the primacy of case resolution as the IRB's core business and to strengthen accountabilities. Other measures taken include enhanced oversight of key corporate support functions and the establishment of additional management "cross-walks" that allow for improved coordination and communication among decision-making and adjudicative and corporate support functions across the organization.

The challenges ahead

The environment in which the IRB operates is complex and unpredictable, as the number and type of cases we receive are influenced by shifting migration patterns, refugee movements and other factors beyond our control, including the decisions of Citizenship and Immigration Canada (CIC) and the Canada Border Services Agency (CBSA).

In the year ahead, the IRB will continue to work with the Minister and the Government to identify qualified candidates for appointment as GIC decision-makers. However, even with a full complement of decision-makers in place, since funding is based on former, significantly lower intake levels, the Board lacks sufficient capacity to address the current intake in the RPD and the IAD. Without additional funding to match the number of new cases that we receive, over which we have no control, the pending inventory and average case processing time will continue to grow. This is particularly the case in the RPD, where the pending inventory stood at 58,000 cases at the end of the reporting period, and is projected to increase further in 2009-10. Similarly, the average case processing time for refugee protection claims is expected to grow from 16.4 months in 2008-09.

While the IRB is engaged in ongoing discussions with the Government to secure the funding necessary to address this situation, in the interim we are committed to pursuing operational efficiencies and other measures that will allow us to respond to our growing workload as effectively as possible with our current resources.

The original version was signed by
Brian Goodman
Chairperson



 


Section I – Overview

Raison d’être and Responsibilities

The IRB is an independent, accountable administrative tribunal that was created on January 1, 1989, by an amendment to the Immigration Act.

Mission
Our mission, on behalf of Canadians, is to resolve immigration and refugee cases efficiently, fairly and in accordance with the law


In 2002, the Immigration Act was replaced by the Immigration and Refugee Protection Act (IRPA) from which each IRB division gets its mandate.



IRB Division Mandates
Refugee Protection Division (RPD)
  • Decides claims for refugee protection
  • Decides applications for vacation of refugee protection
  • Decides applications for cessation of refugee protection
Immigration Division (ID)
  • Conducts admissibility hearings for foreign nationals or permanent residents who seek entry into Canada, or who are already in Canada and are alleged to be inadmissible
  • Conducts detention reviews for foreign nationals or permanent residents who are detained for immigration reasons
Immigration Appeal Division (IAD)
  • Hears appeals of family sponsorship applications refused by Citizenship and Immigration Canada (CIC)
  • Hears appeals from certain removal orders made against permanent residents, Convention refugees and other protected persons, and holders of permanent resident visas
  • Hears appeals by permanent residents against whom a CIC officer outside Canada has decided that they have not fulfilled their residency obligation
  • Hears appeals by the Minister of Public Safety of ID decisions at admissibility hearings

Regional Operations

The IRB carries out its work in three regional offices in Toronto, Montréal and Vancouver: the Central Region, responsible for Ontario, except for the Ottawa area; the Eastern Region, responsible for Quebec, Ottawa and the Atlantic provinces; and the Western Region, responsible for the Western provinces. All three divisions hold hearings in these regions, supported by operational and adjudicative support. The IRB also has offices in Calgary and Ottawa in which hearings are held. Internal and support services are managed at IRB Headquarters, located in Ottawa.

Administrative Justice

Through each division, the IRB strives to deliver a simpler, more accessible and faster form of justice than that provided by the courts, but with no less attentiveness to procedural fairness, the rigour of the law and its application to the particular facts of each case. The IRB applies the principles of administrative law, including natural justice, in its proceedings and resolutions, and decisions are rendered in accordance with the law, including the Canadian Charter of Rights and Freedoms.

The IRB is committed to fairness in all aspects of its work. The Board respects the dignity and diversity of individuals who appear before it, some of whom have experienced very difficult circumstances.

Benefits for Canadians

Immigrants and refugees have always contributed significantly to Canada's growth and development. The IRB ensures continued benefits to Canadians in three important ways:

  • In hearings of refugee claims, it ensures that Canada accepts those in need of protection in accordance with international obligations and Canadian law
  • In hearings on admissibility and detention reviews, it helps ensure the security of Canadians
  • As an independent tribunal for resolving sponsorship, removal order and residency obligation appeals, it helps to promote family reunification, helps ensure Canadians' safety and security, and safeguards the integrity of Canada's immigration system

The IRB also contributes more broadly to the quality of life of Canada's communities by strengthening our country's social fabric and by reflecting and reinforcing core values that are important to Canadians. These include respect for human rights, security, fairness, peace and the rule of law.

Strategic Outcome and Program Activity Architecture (PAA)

Based on its legislated mandate and its currently approved PAA, the IRB has a single strategic outcome and three program activities that include responsibility for all tribunal decisions and resolutions. The fourth program activity, Internal Services, supports the first three as illustrated by the figure below.

Immigration and Refugee Board of Canada's Program Activity Architecture

[D]

Performance Summary



2008-09 Financial Resources ($ millions)
Planned Spending Total Authorities Actual Spending
113.4 124.4 114.7



2008-09 Human Resources (FTEs)
Planned Actual Difference
1,025 987 (38)

Total authorities increased by $11 million from planned spending primarily due to $5.3 million in compensation for collective agreements and $4.7 million carried forward from 2007-08. Actual Spending was approximately $10 million less than the Total Authorities and is mainly attributable to a lower volume of translations of decisions ($5.5 million) and to delays in appointments of decision-makers and staffing of public service positions ($4.2 million).



Performance Summary Table
Strategic Outcome: Resolve immigration and refugee cases before the Immigration and Refugee Board of Canada efficiently, fairly and in accordance with the law
Performance Indicator 1 Target 2008-09 Performance
Percentage of IRB decisions overturned by the Federal Court Less than 1 percent The IRB exceeded its performance target with less than 0.3% of decisions overturned by the Federal Court


($ millions)
Program Activity 2 2007-08
Actual
Spending
2008-09 Alignment to Government of Canada Outcomes 3
Main
Estimates
Planned
Spending
Total
Authorities
Actual
Spending
Refugee Protection Program Activity 75.4 80.8 80.8 88.7 82.5 A safe and secure world through international cooperation
Admissibility Hearings and Detention Reviews Program Activity 12.7 15.2 15.2 17.2 13.7 A safe and secure Canada
Immigration Appeal Program Activity 15.2 17.4 17.4 18.5 18.5 A vibrant Canadian culture and heritage 4
Sub-total 103.3 113.4 113.4 124.4 114.7  
Services received without charge 5 18.4   19.6   21.2  
Total 121.7   133.0   135.9  

Note 1: See more detailed performance indicators for each of the program activities in Section II.

Note 2: Consistent with the Main Estimates, funds for Internal Services were allocated to the core program activities based on respective expenditures trends. For 2008-09 Actual Spending, a total of $30.3 million was proportionally allocated as follows: $21.5 million to Refugee Protection, $4.6 million to Admissibility Hearings and Detention Reviews and $4.2 million to Immigration Appeal.

Note 3: Alignment to Government of Canada (GOC) outcomes and benefits for Canadians are further discussed in Section II under each of the program activities.

Note 4: Through its removal orders work, the Immigration Appeal program activity also contributes to the Safe and Secure Canada outcome area.

Note 5: These services represent mainly accommodations provided by Public Works and Government Services Canada (PWGSC) as well as government payments to employee insurance plans.

IRB Strategic Priorities

In its 2008-09 Report on Plans and Priorities (RPP), the IRB identified three strategic priorities. As described in the table below, these priorities contributed to the achievement of the IRB's strategic outcome by ensuring that the IRB's plans, activities and expected results emphasize quality, consistency and efficiency across the organization, foster an open environment that values its people, and promote flexibility, accountability and continuous improvement.



Contribution of Priorities to Strategic Outcome
Strategic Outcome: Resolve immigration and refugee cases before the Immigration and Refugee Board of Canada efficiently, fairly and in accordance with the law
Priorities Type Status
Manage the case inventory through innovative adjudicative and case management strategies Operational

Ongoing
Successfully met. Adjudicative and case management strategies were developed and implemented in all three divisions promoting quality decision-making and improving consistency in approach to common issues such as requests for postponements and adjournments. Further improvements were made to adjudicative support, early resolution of cases, case readiness procedures and proactive hearings.
Further integrate the work of the IRB to promote effective management Management

Previously committed to
Successfully met. The Board further integrated the work of the IRB by promoting effective and clear management responsibilities and accountabilities and by improving the Board's organizational design. The IRB also continued to implement financial and non-financial management processes such as the Management, Resources and Results Structure (MRRS), the PAA and the corresponding performance measurement framework and worked towards the full integration of the IRB's business planning cycles.
Continue to build a flexible organization with clear accountabilities, ethical behaviour, leadership and operational capacity Operational

Previously committed to
Mostly met. Following the recommendations of the Roles and Responsibilities Review, an action plan was implemented to reform IRB governance. The IRB instituted a new code of conduct applicable to all quasi-judicial decision-makers of the Board. The IRB restructured its advisory committees and created an independent audit committee. These changes will improve accountabilities, senior management decision-making support and enhance oversight of IRB activities.

A significant portion of the IRB's operational capacity comes from its complement of decision-makers. Recruitment and selection efforts were intensified in order to ensure that the Government was provided with a sufficient pool of qualified candidates for appointment by the GIC to the RPD and the IAD. During the reporting period, appointments and reappointments of GIC decision-makers to the Board fell short of the vacancy rate, therefore the IRB could not benefit from its funded operational capacity to resolve cases. The consequences are discussed further in the report.

Risk Analysis

Operating Environment

The IRB carries out its mandate within a complex and ever-changing environment. Both international and domestic factors influence the IRB's operating environment. Conflicts and country conditions abroad can result in refugee movements, which affect the number of refugee protection claims made in Canada. Similarly, shifts in international migration patterns and the introduction of stricter policies by other receiving countries impact the number of people seeking admission to Canada.

Refugee populations. The report Asylum Levels and Trends in Industrialized Countries, 2008, published by the United Nations High Commissioner for Refugees (UNHCR), shows that the number of asylum claims submitted in industrialized countries in 2008 rose by 12 percent compared to 2007. An estimated 383,000 claims were recorded in the course of the year, 41,600 more than the previous year. During this period, only the United States received more claims than Canada among the countries surveyed.

In North America, an estimated 86,000 new asylum applications were submitted in 2008, 6,900 claims or 9 percent more than in 2007. The United States registered approximately 49,000 new applications, a 3 percent drop compared to 2007, whereas Canada saw a dramatic 30 percent increase to approximately 36,000 new applications, mainly linked to the higher numbers of Mexican and Haitian asylum-seekers.

Growing trend of family sponsorships. Immigration continues to be important for Canada, as immigrants represent an increasing proportion of the population. Canada's population of immigrants is expected to reach between 7.0 and 9.3 million by 2017. It is within this context, and consistent with the Government's objective of promoting family reunification, that family-class sponsorship applications have increased. With this increase, it is expected that the IRB will continue to receive a high number of family sponsorship appeals.

Challenges

Appointment of decision-makers. In order to resolve refugee protection claims and immigration appeals referred to it, the IRB depends on decision-makers who are appointed by the Governor in Council (GIC) following a rigorous merit-based selection process. During 2008-09, the IRB made considerable efforts to recruit, select and recommend to the Minister suitable candidates for appointment to the Board. Once appointed, it takes approximately six months to train new decision-makers and for them to acquire the experience to become fully productive. During a period of a series of transitions in government between 2004 and 2008, appointments and reappointments of GIC decision makers to the Board did not keep pace with expired mandates, resignations and vacancies. As noted in the 2009 Status Report of the Auditor General of Canada, the high number of IRB member vacancies has had a significant impact on the Board's capacity to process cases on a timely basis.

Increase in intake and pending case inventory. During 2008-09, the IRB experienced an increase in its intake and pending inventory. The growing inventory is primarily attributable to two external factors: an increased number of refugee protection claims referred and immigration appeals filed; and a decrease in timely appointments and reappointments of GIC decision-makers. Both factors are outside the IRB's control. The IRB is currently funded to finalize 25,000 refugee protection claims and 6,500 immigration appeals per year. At the end of March 2009, there were approximately 58,000 refugee protection claims and 10,600 immigration appeals pending. If intake levels and resource levels remain constant, it is expected that the inventory will continue to grow, even with a full complement of decision-makers. While the IRB will continue to seek opportunities to further increase its productivity, rising caseload pressures in the RPD and the IAD are such that changes to resource levels will be required to return the pending inventory to normal operating levels.

Expenditure Profile

Spending Trend 2005-06 to 2008-09

Spending Trend

[D]

There has not been any significant difference between Main Estimates and Planned Spending over the last four years. Main Estimates and Planned Spending amounts have been constant during the period with the exception of 2006-07, which included sunset funding of $4 million for both administrative measures related to refugee determination and reduction in the inventory of parents and grandparents sponsorship appeals. The difference between Planned Spending and Total Authorities is due to compensation for collective agreements and funding carried forward from the previous year. For Actual Spending, lower expenditures in 2007-08 were primarily due to delays in the appointment and reappointment of GIC decision-makers and vacant public service positions. Actual Spending for 2008-09 includes approximately $5 million in additional compensation for collective agreements.



Voted and Statutory Items
($ millions)
Vote # or Statutory Items (S) Truncated Vote or Statutory Wording 2006-07
Actual
Spending
2007-08
Actual
Spending
2008-09
Main
Estimates
2008-09
Actual
Spending
10 Program expenditures 99.2 92.1 100.6 102.7
(S) Contributions to employee benefit plans 11.2 11.2 12.8 12.0
Total 110.4 103.3 113.4 114.7



Section II – Analysis of Program Activities

This section provides a performance summary as well as information on overall financial and human resources for the IRB's four program activities during the 2008-09 reporting period.

Strategic Outcome and Program Activities

As discussed in Section I, based on the IRB's legislated mandate and approved PAA, the IRB has a single strategic outcome and three program activities that include responsibility for all tribunal decisions and resolutions. These are supported by Internal Services, which is the fourth program activity.

Program Activities

[D]

Common Elements

The results presented in this performance report are based on the plans and expected results presented in its corresponding RPP. A key part of the RPP was the identification of initiatives from the plans and expected results that are of common interest to all IRB program activities. These program activities resulted in the IRB being able to meet its 2008-09 strategic priorities and strategic outcome. The results are presented in the following table.



Common Elements in the IRB's Plans and Results
Strategic Outcome: Resolve immigration and refugee cases before the Immigration and Refugee Board of Canada efficiently, fairly and in accordance with the law
Strategic Priority 1: Manage the case inventory through innovative adjudicative and case management strategies
Plans Performance Status Performance Summary
Focus on Integrated Case Management System (ICMS) maintenance and regional processing through the release of system improvements; review of reporting functionality so reports may better support senior management decision-making and case management; enhanced regional training efforts Somewhat Met
  • Delivered two maintenance releases to enhance the functionality of system
  • Undertook the assessment (ongoing at year-end) of enhancements required to improve the capacity of the system to meet operational needs
  • Improved governance structure was put in place to enhance deliberation and decision-making regarding the future direction of the project
  • Options were formulated to consider the long-term viability of the system and other critical IRB systems
Initiate consultations to map the business process and develop business requirements for the ID Somewhat Met
  • All regional processes of the ID were mapped
  • Additional work on business requirements remained outstanding at year-end
Develop the National Reasons Database Mostly Met
  • Development and planning for the implementation of the National Reasons Database continued as planned
  • A standardized naming convention for files was established
Develop a framework for the use of videoconferencing and new technology across the divisions Somewhat Met
  • The IRB defined operational and adjudicative requirements for a Board-wide framework for videoconferencing
  • Work continued on a policy document intended to provide high-level guidance to decision-makers regarding the use of videoconferencing
Hearing readiness: take pre-hearing action to ensure that files are hearing-ready and to facilitate proactive hearings Mostly Met
  • Work continued on ensuring that case readiness procedures were in place across the three divisions, including conducting pre-hearing proceedings as required
Assessment of the revised ID-IAD streamlining process and consideration for expansion to other regions Mostly Met
  • Revised process with participation by counsel and the Canada Border Services Agency (CBSA) was implemented
  • Reports were developed and implemented to monitor progress and measure results; assessment led to further recommendations and improvements
  • As of year-end, the revised process, which includes a short oral hearing at the IAD, was in place in the Central Region while expansion to other regions remained pending
ID-IAD implementation of new legislation with respect to section 86 of the IRPA dealing with non-disclosure of information and use of special advocates Mostly Met
  • Procedures were revised to reflect changes to the IRPA following the Supreme Court decision (Charkaoui) amending the process for application of non-disclosure
  • IRB facilities were upgraded to accommodate the special advocate process while ensuring that an arm's length relationship between all parties is maintained
  • Policy officers and legal advisors attended a Department of Justice (DOJ) training session for special advocates; liaison with DOJ remained ongoing at year-end regarding the evolution of the program
Deliver focused training on priority topics in order to:
  • Meet the needs of decision-makers and tribunal officers and promote quality, consistency and efficiency
  • Ensure RPD and IAD decision-makers are cross-divisionally trained
  • Ensure tribunal officers are trained to provide support to all divisions
  • Provide joint training where appropriate
Mostly Met Training remained a priority due to the number of new and less experienced decision-makers:
  • IRB decision-makers trained on IAD adjudication strategies, including conducting more proactive hearings, consistent approaches to postponements/ adjournments and conducting hearings in the absence of the Minister's counsel
  • A successful and productive IAD National Training Session was held in November 2008
  • Training was delivered on the Code of Conduct for decision-makers
  • Cross-divisional training was deferred until GIC decision-maker complement is closer to the number for which it is funded
  • Tribunal officers were trained on advanced Alternative Dispute Resolution (ADR) and Early Informal Resolution (EIR)
  • The ID conducted training on issues identified in the ID adjudicative strategy
  • The RPD conducted focused training on priority topics
Liaise with Canada's administrative justice community and international partners in order to benefit from their experiences and best practices in the area of adjudicative and case management initiatives Met All
  • The IRB considered the experiences of Canada's administrative justice community and international partners when developing its best practices
  • The IRB attended 13 multilateral events, undertook 2 official visits abroad and participated in 10 visits of foreign delegations to Canada. The IRB also sent an expert on a short-term assignment to a UNHCR office overseas to provide advice and training
Strategic Priority 2: Further integrate the work of the IRB to promote effective management
Assess the IAD-RPD Western Region Integration pilot project and consider expansion to other regions Met All
  • Assessment concluded and recommendations made and accepted
  • Decision on expansion to other regions deferred until GIC decision-maker complement is closer to the number for which it is funded
Develop a common approach to reducing adjournments/ postponements across the divisions Somewhat Met
  • Board-wide training on dealing with postponements and adjournments was delivered in October 2008
  • Reductions in postponements and adjournments were realized as a result of more targeted monitoring
  • At year-end, work to ensure the accuracy and integrity of definitions, regional data entry, associated statistical analysis and reporting of postponements and adjournments remained ongoing. An evaluation of case scheduling processes has been initiated and the resulting action plan will be established in 2009-10
  • The application of Guideline 6, Scheduling and Changing the Date or Time of a Proceeding in the Refugee Protection Division, was reviewed with decision-makers, and plans were initiated to expand Guideline 6 to the IAD and the ID
Strategic Priority 3: Continue to build a flexible organization with clear accountabilities, ethical behaviour, leadership and operational capacity
Implement an action plan further to the recommendations of the Roles and Responsibilities Review Met All
  • Eleven recommendations were made to address the review issues. All of the recommendations were successfully implemented
Implement the revised IRB Code of Conduct for all decision-makers Met All
  • An IRB Code of Conduct for decision-makers was implemented
  • Training on the IRB Code of Conduct for decision-makers was completed across the three divisions
Revise the complaint protocol and process for GIC decision-makers Mostly Met
  • Revision of the complaint protocol and process for all decision-makers was ongoing at year-end. Completion is expected in fall 2009
Pursue recruitment efforts of GIC decision-makers for the RPD and the IAD Exceeded
  • Recruitment campaigns were conducted in June 2008 and March 2009. Over 1,300 applications were received. Applicants were screened and tested
  • Following the IRB rigorous selection process, qualified candidates from the June 2008 campaign were recommended to the Minister. A similar process is planned in the next fiscal year for the qualified candidates from the March 2009 campaign
Put resource planning in place to ensure that the IRB has the necessary complement of decision-makers and the necessary support for new decision-makers throughout their integration Met All
  • Incorporation of GIC resource planning into the IRB's business planning cycles is ongoing
  • New decision-makers receive extensive training and coaching in their first year, and ongoing legal and other support during the remainder of their mandate
Review and update accountability profiles for GIC decision-makers and develop guidelines on the application of GIC terms and conditions of employment Somewhat Met
  • Accountability profiles for GIC decision-makers have been reviewed. Updated profiles will be finalized in fall 2009
  • The performance evaluation process was reviewed and updated
  • The Privy Council Office is reviewing the terms and conditions of employment for GIC appointees. The IRB will issue appropriate guidelines following the completion of the review process

Distinct Program Activity Elements

The RPP also identified the plans, expected results and operations that are distinct to each of the four IRB program activities and contributed to achieving the IRB's strategic priorities for 2008-09 and the IRB's strategic outcome. The results for each of the program activities are highlighted in the following pages.

Program Activity 1: Refugee Protection



Description
The Refugee Protection Division (RPD) delivers the IRB's Refugee Protection program activity. It determines claims for refugee protection made in Canada. Processing of refugee claims is the main focus of the IRB's activities and resources. Through the work of the RPD, Canada fulfills its obligations as a signatory to a number of international human rights conventions. 2008-09 Highlights
  • 36,000 new refugee claims filed
  • 20,000 refugee claims resolved
  • Case inventory increased from 42,000 to 58,000



Program Activity: Refugee Protection
2008-09 Financial Resources
($ millions)
2008-09 Human Resources
(FTEs)
Planned
Spending
Total
Authorities
Actual
Spending
Planned Actual Difference
80.8 88.7 82.5 780 743 (37)


Strategic Priority 1
Manage the case inventory through innovative adjudicative and case management strategies
Plans Performance
Status
Performance
Summary
Implement a case management strategy to minimize the growing backlog of pending claims Met All
  • Finalizations in the expedited stream increased from 5% to 12% of all claims
  • More proactive hearings were conducted with the development of an "agreed statement of facts" between counsel and tribunal officers
  • There was an increase in the use of pre-hearing readiness conferences and other hearing readiness tools
  • There was a 5% increase in decision-maker productivity
Develop and implement an adjudicative strategy to ensure quality and efficiency of decision-making Met All
  • New tools for quality decision-making were implemented including decision trees, flow charts and check lists
Assess the RPD Language Analysis pilot project and present results to the Policy Advisory Committee Mostly Met
  • Claims within the Language Analysis pilot project continued to be heard during 2008-09
  • Project assessment and presentation of results are scheduled for 2009-10
Develop the next steps for the Early Information Gathering (EIG) initiative Somewhat Met
  • Work continued on the EIG project. Given recent changes in information gathering on the part of CIC and CBSA, future direction of the project remained under consideration at year-end
Improve the National Documentation Packages (NDPs) Met All
  • 183 NDPs were maintained and updated on a regular basis
  • Selection of documents for inclusion in the NDPs was improved through enhanced consultation process

Performance Analysis

Decision-makers. The RPD depends on experienced, highly trained decision-makers to provide well-reasoned quality decisions in a timely manner. Throughout 2008-09, the RPD operated with approximately 40 fewer decision-makers than its funded complement. Losses in experienced decision-makers were due to expired mandates, resignations, or reappointments not being made. Although the pace of GIC appointments quickened in the last quarter of the fiscal year, the shortfall in decision-makers hampers the RPD's ability to resolve more cases more quickly.

Pending case inventory. The RPD began the fiscal year with a pending inventory of approximately 42,000 cases. The Division received an additional 36,000 new refugee claim referrals in 2008-09. With the number of decision-makers available and their level of experience, the RPD finalized 20,000 claims. This resulted in a pending inventory of 58,000 claims at the end of 2008-09. With the RPD currently funded to decide 25,000 claims per year, the inventory has increased beyond our capacity to resolve within existing resource levels. Without increased resources for the RPD, refugee claimants, many of whom come from difficult circumstances, will face the added stress and uncertainty associated with lengthy delays in the resolution of their claim.

Business improvements, productivity increase. RPD decision-makers have increased their productivity, from finalizing an average of 3.8 cases per week per decision-maker during 2007-08 to 4.0 cases in 2008-09. This 5 percent increase was obtained through training, implementation of new procedures, internal process improvements, and strategic monitoring of postponements and adjournments, and of time taken to render reasons.

Lessons Learned

In the Eastern Region, the RPD introduced a new initiative through which a number of cases that are simple and involve the same counsel are scheduled together and decisions are rendered mostly orally. The initiative has resulted in more cases being resolved without the addition of new resources. This initiative could yield even better results with improved liaison with counsel and expansion to other regions.

Benefits for Canadians

Through the work of the Refugee Protection program activity, Canada accepts only those refugee claimants in need of protection. Canada provides a safe haven to persons with a well-founded fear of persecution, as well as to those who face a danger of torture or a risk to their life or a risk of cruel and unusual treatment or punishment. This contributes to a safe and secure world environment through international cooperation.

Refugee Protection

[D]

Program Activity 2: Admissibility Hearings and Detention Reviews



Description
The Immigration Division (ID) delivers the Admissibility Hearings and Detention Reviews program activity. It holds hearings for foreign nationals or permanent residents who, under the provisions of the IRPA, are alleged to be inadmissible to Canada or are detained. Detainees must be seen by the ID within 48 hours after being taken into detention or without delay afterwards and subsequent reviews must be conducted within specific statutory timeframes. Decision-makers must balance the right to individual liberty with the security interests of Canadians. 2008-09 Highlights
  • 3,150 admissibility hearings were finalized, 12% more than the previous year
  • 18,300 detention reviews were carried out, 14% more than the previous year



Program Activity: Admissibility Hearings and Detention Reviews
2008-09 Financial Resources
($ millions)
2008-09 Human Resources
(FTEs)
Planned
Spending
Total
Authorities
Actual
Spending
Planned Actual Difference
15.2 17.2 13.7 105 104 (1)


Strategic Priority 1
Manage the case inventory through innovative adjudicative and case management strategies
Plans Performance
Status
Performance
Summary
Continue to implement a strategic approach to quality decision-making Met All
  • The application of adjudicative strategies continued to ensure that the quality of ID proceedings are maintained, including:
    • An analysis of decisions related to a specific group in Pakistan was completed
    • A framework of analysis was developed to better support decision-makers in rendering oral decisions
    • Work on the guideline on detention underway
    • Training on sensitive information and weighing of factors in detention reviews was delivered
  • Decision-makers were provided with opportunities to discuss issues of common concern:
    • Five decision-makers' forum discussions were held
    • Training on consistency in decision-making took place
Pursue cross-regional consistency efforts within the ID Met All
  • Private/public file annotations were completed
  • A new Order of Release form was completed
  • Instructions on detention review requirements during statutory holidays were implemented
  • Decision-makers were sent to other regions on short-term assignments

Performance Analysis

Increase in intake. The number of cases reviewed by the ID depends on the number of cases referred by the CBSA. Over the past four years, referrals of admissibility hearings have increased by 29 percent while referrals of detention reviews have increased by 19 percent (excludes cases resolved without a hearing). Through further enhanced efficiencies, the ID has continued to manage the increased workload within existing resources and has been able to conclude cases within the legislated timeframe for detention reviews.

Admissibility hearings. During 2008-09, the ID finalized 3,150 admissibility hearings, 12 percent more than the previous year. Of the admissibility hearings finalized, 74 percent resulted in a removal order being issued because the person was determined inadmissible, 3 percent resulted in permission to enter or to remain in Canada, 7 percent were subject to the withdrawal of the inadmissibility allegation by the CBSA at the hearing, and 14 percent were closed after the person failed to appear for the hearing.

Detention reviews. During 2008-09, the ID finalized approximately 18,300 detention reviews, 14 percent more than the previous year. Close to 5,300 detention reviews were finalized without a decision because the case was rescheduled or the person had been removed, released or detained by courts prior to a scheduled review. The remaining 13,000 detention reviews were finalized with a decision, a 9 percent increase over the previous year.

Lessons Learned

In most of its activities, the ID met expectations and in some cases exceeded them. As mentioned in the RPP, the ID had planned to publish two persuasive decisions as models to guide and assist in future decisions. However, after further evaluation, the ID determined that a framework of analysis better suits the needs of ID decision-makers and contributes to improved consistency in decision-making. A first framework of analysis on equivalency of foreign convictions was developed and work to develop other frameworks of analysis will continue in 2009-10.

Benefits for Canadians

The ID renders decisions that maintain the security of Canadian society and uphold Canada's reputation for justice and fairness to individuals. It is with this sense of responsibility that the IRB maintains the balance between individual rights and the security of Canadians.

Detention Reviews

[D]

Admissibility Hearings

[D]

Program Activity 3: Immigration Appeal



Description
The Immigration Appeal Division (IAD) delivers the Immigration Appeal program activity. It hears immigration appeals from Canadian citizens and permanent residents whose applications to sponsor close family members to Canada have been refused. Other key functions include hearing appeals from permanent residents, foreign nationals with a permanent resident visa and protected persons who have been ordered removed from Canada, and permanent residents outside Canada who have not fulfilled their residency obligation. 2008-09 Highlights
  • 7,400 new immigration appeals filed
  • 6,300 immigration appeals finalized
  • Case inventory increased from 9,500 to 10,600
  • Average processing time increased from 10 to 11 months



Program Activity: Immigration Appeal
2008-09 Financial Resources
($ millions)
2008-09 Human Resources
(FTEs)
Planned
Spending
Total
Authorities
Actual
Spending
Planned Actual Difference
17.4 18.5 18.5 140 140 0


Strategic Priority 1
Manage the case inventory through innovative adjudicative and case management strategies
Plans Performance
Status
Performance
Summary
Implement an inter-regional case inventory management plan, including continuation of the Central Region IAD's backlog reduction plan Met All
  • Strategic sharing of decision-makers across the regions, with more videoconferencing hearings and inter-regional transfer of written proceedings
  • Oldest appeals given priority
Develop and implement adjudicative strategies to enhance consistency in decision-making. Areas may include:
  • Proactive hearings
  • Removal order appeals
  • Adjournments/postponements
  • Hearings in the absence of the Minister's counsel
Met All
  • A best practices guide and training video on conducting proactive hearings were produced
  • Successful intervention in Khosa case at the Supreme Court of Canada, which acknowledged judicial deference to the IAD's discretionary jurisdiction
  • IAD worked with the CBSA to facilitate more resolutions of removal order appeals without hearings
  • Board-wide training on more consistent approaches to postponements/adjournments was delivered
  • IAD worked with the CBSA to expand hearings without the Minister's counsel present
Increase the early resolution of appeals without a hearing: assess and improve Early Informal Resolution (EIR) and Alternative Dispute Resolution (ADR) Mostly Met
  • 1,366 appeals were resolved through ADR (25% increase over previous fiscal year)
  • EIR process was supported by policy on communications, more focused training
  • Many appeals were finalized by written proceedings
Assess the effectiveness of initiatives and case streaming implemented under IAD Innovation Mostly Met
  • Pilot projects and case management initiatives were assessed and recommendations for improvements were considered

Performance Analysis

Decision-makers. The IAD depends on highly trained decision-makers to conduct fair and efficient hearings, and provide well-reasoned quality decisions in a timely manner. Throughout 2008-09, the IAD operated with an average of 9 fewer decision-makers (or 25 percent) than its funded level. While the pace of appointments and reappointments increased toward the end of the reporting period, the lack of a large group of experienced decision-makers raises challenges in maximizing productivity and managing the Division.

Key statistical highlights. In 2008-09, 7,400 appeals were filed. This was a record high: an increase of 9 percent in comparison with 2007-08 and an increase of 72 percent in comparison to pre-IRPA levels. The Division's productivity remained high with 6,300 finalizations (almost 7,000 when adding stays of removal orders). This resulted in a pending inventory of almost 10,600 cases at year-end, an increase of 12 percent over the previous year. The average case processing time increased by 11 percent to 11.1 months. The increase in the average cost is primarily due to a larger share of internal services costs as well as increased salary costs resulting from collective agreements.

Business improvements. Despite a shortage of decision-makers, the IAD dealt with its caseload by using innovative and effective case management and adjudication strategies to promote best practices and cross-regional consistency. New initiatives were implemented to maximize early resolution and ensure files were hearing-ready. With increased use of the IAD's successful Alternative Dispute Resolution (ADR) program, the number of appeals completed without a hearing rose by 6 percent from the previous fiscal year. Paper hearing processes and more proactive hearings were also key to increasing the IAD's effectiveness and efficiency.

Lessons Learned

During a period of a shortfall in decision-makers, having strong adjudicative support is especially important for sustaining high productivity through increased hearing readiness and early resolution of cases. The flexible sharing of decision-maker resources among regions continued to be crucial to the IAD's efforts to address the backlog in Central Region appeals. The need to coordinate resources with the CBSA continued to be a challenge in many areas where the cooperation of Minister's counsel is important, for example, for the ID-IAD streamlining of removal order appeals and for hearings in which the Minister's counsel appears only through written submissions. The IAD will capitalize on these lessons and continue to improve its efficiency and productivity.

Benefits for Canadians

Through its sponsorship appeals work, the IAD recognizes the contributions of immigrants to the strength and vitality of Canadian society and culture, as well as the Government's commitment to family reunification. Through its work on removal order appeals, the IAD enhances public safety while maintaining the balance with individual rights.

Immigration Appeal

[D]

Program Activity 4: Internal Services



Description
Internal Services are groups of related activities and resources required to support the needs of all three tribunal programs and other corporate obligations of the IRB. These services are: Management and Oversight, Communications, Legal, Human Resources Management, Financial Management, Information Management, Information Technology, Materiel, Acquisition, and Other Administrative Services. Internal Services include only those activities and resources that apply across an organization and not to those provided to a specific program. 2008-09 Highlights
  • Corporate Integrated Human Resources Plan implemented
  • Three-year Information Technology Strategic Plan implemented
  • Independent office for internal audits created



Program Activity: Internal Services
2008-09 Financial Resources
($ millions)
2008-09 Human Resources
(FTEs)
Consistent with the Main Estimates, funds for Internal Services were allocated to the core program activities based on respective expenditures trends. For 2008-09 Actual Spending, a total of $30.3 million was proportionally allocated as follows: $21.5 million to Refugee Protection, $4.6 million to Admissibility Hearings and Detention Reviews and $4.2 million to Immigration Appeal. In the same manner, Full Time Equivalents (FTEs) for Internal Services were allocated to the core program activities. For 2008-09, a total of 253 FTEs were proportionally allocated as follows: 191 FTEs to Refugee Protection, 35 FTEs to Admissibility Hearings and Detention Reviews and 27 FTEs to Immigration Appeal.


Strategic Priority 2
Further integrate the work of the IRB to promote effective management
Plans Performance
Status
Performance
Summary
Develop the Management, Resources and Results Structure (MRRS), the Program Activity Architecture (PAA) and the corresponding performance measurement framework Mostly Met
  • The IRB's MRRS and PAA are established, operational and have recently been updated
  • The performance measurement framework is almost complete - quantitative measures are in place while qualitative measures are under development
Implement the IRB's Core Management Controls Action Plan Met All
  • Top-rated core controls are in place
Further integrate HR, financial and IT planning into the IRB's business planning cycles Somewhat Met
  • A three-year IT Plan has been implemented and integration mechanisms with the business planning cycle are in place
  • The IRB's business and management plans incorporate financial and non-financial information; HR plans will be integrated in coming years
Further implement a comprehensive Procurement and Asset Management Program Mostly Met
  • An Asset Management System was implemented at National Headquarters and will be extended to the regions in 2009-10
Implement a corporate consultation framework Met All
  • A consultation framework has been implemented and integrated with the planning cycle both nationally and regionally, resulting in improved consultation activity identification, planning and information sharing
Further focus the IRB's international activities into a cohesive program that assists the IRB in achieving its international objectives while balancing the numerous requests for international participation against available resources Mostly Met
  • International activities have been carried out in accordance with the objectives, guidelines and directions set by the Chairperson's Management Board to maximize benefits and ensure a coherent approach
Strategic Priority 3
Continue to build a flexible organization with clear accountabilities, ethical behaviour, leadership and operational capacity
Further implement the three-year Employment Equity (EE) Strategy Mostly Met
  • Phase 1 of the Mentoring Program was launched in May 2008 open to members of designated groups. Monitoring and assessment activities were conducted through surveys and interviews. The development of staffing benchmarks was postponed since Treasury Board and Statistics Canada did not release the Workforce Availability Estimates, which are needed to establish benchmarks, until February 2009
  • The development of a Career Progression Program was initiated. Focus groups with national and regional EE member representation were held to identify the needs and expectations for this program
  • IRB personnel were kept aware of EE activities through messages, postings on the internal website and several events
Implement the new Official Languages (OL) Policy Mostly Met
  • The IRB finalized its OL policy through consultations with its divisions, branches and regions. At year-end, work continued on guidelines to accompany the policy
Implement key Public Service Renewal activities through the consolidation of HR modernization initiatives Mostly Met
  • A revised approach and tools to support the integration of HR planning were introduced in 2008-09, including the development of tools for succession planning
  • As part of the Performance Management Program cycle, the IRB introduced Talent Management as a new feature for all Executives and EX equivalents
  • Over the past few years, there has been considerable effort to strengthen the quality of the performance management program and efforts continued in 2008-09. The IRB achieved a 65% completion rate for 2008-09
  • The IRB used collective staffing processes and pre-qualified pools of candidates from the Public Service Commission to recruit employees
Develop a Values and Ethics Framework for IRB employees based on the new TBS Charter Somewhat Met
  • The IRB has delayed implementing a Values and Ethics Framework until the Treasury Board Code of Values and Ethics is implemented
  • Employees and managers received training and materials on values and ethics, disclosure of wrongdoing and political activities

Performance Analysis

Management and oversight. At the end of the 2008-09 reporting period, the IRB restructured its senior advisory committees and created an independent audit committee. These changes, in conjunction with the implementation of the Chief Financial Officer (CFO) model, which is planned for 2009-10, will improve senior management decision-making support and enhance oversight for the Board's activities.

Communications. Through participation in outreach events and conferences, the IRB continued to develop its relationship with non-government organizations, stakeholders and other groups. Through national meetings of the Consultative Committee on Practices and Procedures (CCPP) and regional stakeholders meetings, IRB personnel and stakeholders had exchanges on key policy and procedural issues, which resulted in improved understanding and cooperation. Furthermore, in an effort to enhance its relationships with stakeholders, the IRB revised its consultation framework to coordinate and target its outreach activities more effectively and allow for improved information sharing.

Legal. In 2008-09, Legal Services continued to provide legal advice in support of all of the IRB's strategic priorities including streamlining and integration of special advocates in non-disclosure proceedings pursuant to section 86 of the IRPA. It also supported a broad range of corporate activities including human resources, procurement and GIC Secretariat Services activities. Training and support of Board decision-makers, especially those newly appointed, was a priority. Legal Services took a lead role in the IRB's successful intervention in the Khosa case before the Supreme Court of Canada. In Khosa, the Court recognized the IAD's authority to independently assess evidence previously presented in criminal courts, and granted greater deference to IAD decision-makers in judicial reviews of the exercise of the IAD's discretionary jurisdiction in removal order appeals. This may result in fewer IAD decisions being overturned by the Federal Court.

Human resources management. In 2008-09, the IRB continued to foster an environment where people management is recognized as a priority in achieving its strategic outcome. A Corporate Integrated Human Resources Plan was developed, which outlines the key people management priorities that the Board will focus on for the next three years. These priorities are in line with the organizational strategic priorities and the broader goals of the Government's Public Service Renewal Action Plan.

Financial management. A major accomplishment for 2008-09 was the testing of Version 6.2 of the departmental financial management system as well as its implementation in the IRB. A reallocation review was also completed in preparation for the financial pressures facing the Board as well as the Strategic Review for 2009-10.

Information management. In 2008-09, the IRB started a national clean-up of all files stored in Federal Record Centres and private warehousing facilities. This project is expected to continue for the next four years. A draft of a new function-based file classification structure was also completed at the end of March 2009.

Information technology (IT). In 2008-09, the IRB developed its first three-year IT strategic plan. The three-year plan will allow the Board to align and integrate its IT strategies and architecture with business requirements and priorities, which will result in improved business performance.

Procurement and assets management. The IRB's procurement program has been significantly improved and now reflects a consistent IRB-wide approach to file management, reporting, and application of Treasury Board Secretariat (TBS) and Public Works Government Services Canada (PWGSC) policies and procedures. The IRB has implemented software that will track IT and non-IT assets, which will be implemented in the regions in the near future, thereby improving asset management.

Internal audit and evaluation. Near the end of 2008-09, the IRB created an independent office for Internal Audit, reporting directly to the Chairperson. A Chief Audit Executive, who is responsible for overseeing the Internal Audit function, was appointed. The process of establishing the IRB's Departmental Audit Committee was also initiated to provide the Chairperson with independent and objective advice, guidance and assurance on the adequacy of the IRB's control and accountability processes.



Section III – Supplementary Information

Financial Highlights

A complete set of financial statements can be found on the IRB Internet site at http://www.irb-cisr.gc.ca/Eng/brdcom/publications/peren/pages/dpr-rmr09.aspx.



($ millions)
Condensed Statement of Financial Position
For the period ending March 31, 2009
Percentage Variance 2009 2008
Assets      
Assets - Total -28% 15.1 21.1
Total -28% 15.1 21.1
Liabilities      
Liabilities - Total 28% 34.7 27.2
Equity      
Equity - Total -221% (19.6) (6.1)
Total -28% 15.1 21.1


($ millions)
Condensed Statement of Operation
For the period ending March 31, 2009
Percentage Variance 2009 2008
Expenses      
Expenses - Total 14% 144.6 126.4
Revenues      
Revenues - Total 0% 0 0
Net Cost of Operations 14% 144.6 126.4

Actual Spending by Program Activity

Actual Spending by Program Activity

[D]

List of Supplementary Information Tables

The following electronic tables can be found on the TBS Web site at http://www.tbs-sct.gc.ca/dpr-rmr/st-ts-eng.asp.

  • Green Procurement
  • Internal Audits and Evaluations

Other Items of Interest

Legislation Administered

Immigration and Refugee Protection Act
(S.C. 2001, c. 27, as amended)

Immigration and Refugee Protection Regulations
(SOR/2002-227, as amended)

Refugee Protection Division Rules
(SOR/2002-228)

Immigration Division Rules
(SOR/2002-229)

Immigration Appeal Division Rules
(SOR/2002-230)

Oath or Solemn Affirmation of Office Rules
(Immigration and Refugee Board of Canada)
(SOR/2002-231)

IRB Processes

Visit these links to find out how the IRB processes its cases:

Related Information

UNHCR Web site: http://www.unhcr.org/cgi-bin/texis/vtx/home

Contact us

For more information, visit the IRB Web site at
http://www.irb-cisr.gc.ca
or contact the IRB Communications Directorate at 613-947-0803 or one of the IRB offices listed below.

National Headquarters

Immigration and Refugee Board of Canada
Minto Place—Canada Building
344 Slater Street, 12th Floor
Ottawa, Ontario K1A 0K1
Tel: 613-995-6486  Fax: 613-943-1550

Regional Offices

Eastern Region
200 René Lévesque Boulevard West
Guy-Favreau Complex
East Tower, Room 102
Montreal, Quebec H2Z 1X4
Tel: 514-283-7733  Fax: 514-283-0164

Central Region
74 Victoria Street, Suite 400
Toronto, Ontario M5C 3C7
Tel: 416-954-1000  Fax: 416-954-1165

Western Region
Library Square, Suite 1600
300 West Georgia Street
Vancouver, British Columbia V6B 6C9
Tel: 604-666-5946  Fax: 604-666-3043