2018 Public Service Employee Survey Results by Theme for Directorate of Power Reactor Regulation
The results of the 2018 Public Service Employee Survey (PSES) are presented by key people management themes (i.e., employee engagement, leadership, workforce, workplace). Results are not shown when there is no historical comparison, or when there is an insufficient number of responses.
Note: Due to rounding, percentages may not add to 100. Results have been adjusted for non-response to better represent the target population. Therefore, percentages should not be used to determine the number of respondents within a response category. Positive answers and Negative answers are calculated by removing the "Don't know" and "Not applicable" responses from the total responses.
Table of Contents
Employee engagement
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 34 | 42 | 12 | 8 | 5 | 0 | 0 | 75 | 13 | 160671 |
2018 | Canadian Nuclear Safety Commission | 39 | 41 | 10 | 7 | 3 | 0 | 0 | 80 | 10 | 720 |
2018 | Regulatory Operations Branch | 36 | 45 | 8 | 7 | 3 | 0 | 0 | 81 | 10 | 215 |
2018 | Directorate of Power Reactor Regulation | 34 | 53 | 4 | 6 | 4 | 0 | 0 | 87 | 10 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 29 | 37 | 14 | 11 | 9 | 0 | 0 | 66 | 20 | 160988 |
2018 | Canadian Nuclear Safety Commission | 38 | 35 | 12 | 10 | 5 | 0 | 0 | 73 | 15 | 723 |
2018 | Regulatory Operations Branch | 30 | 38 | 13 | 13 | 5 | 0 | 0 | 69 | 18 | 215 |
2018 | Directorate of Power Reactor Regulation | 37 | 30 | 15 | 10 | 8 | 0 | 0 | 68 | 18 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 50 | 35 | 9 | 3 | 2 | 0 | 0 | 85 | 5 | 160125 |
2018 | Canadian Nuclear Safety Commission | 56 | 29 | 11 | 3 | 1 | 0 | 0 | 85 | 4 | 715 |
2018 | Regulatory Operations Branch | 54 | 31 | 11 | 2 | 1 | 0 | 0 | 86 | 4 | 214 |
2018 | Directorate of Power Reactor Regulation | 49 | 37 | 10 | 2 | 2 | 0 | 0 | 86 | 4 | 51 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 40 | 39 | 11 | 6 | 3 | 0 | 0 | 80 | 9 | 161156 |
2018 | Canadian Nuclear Safety Commission | 44 | 39 | 11 | 5 | 1 | 0 | 0 | 83 | 6 | 723 |
2018 | Regulatory Operations Branch | 41 | 42 | 10 | 5 | 3 | 0 | 0 | 82 | 8 | 216 |
2018 | Directorate of Power Reactor Regulation | 38 | 43 | 7 | 8 | 4 | 0 | 0 | 81 | 12 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 35 | 32 | 17 | 9 | 7 | 1 | 0 | 67 | 16 | 160754 |
2018 | Canadian Nuclear Safety Commission | 46 | 33 | 13 | 5 | 3 | 0 | 0 | 79 | 8 | 717 |
2018 | Regulatory Operations Branch | 41 | 34 | 15 | 7 | 3 | 0 | 0 | 75 | 10 | 216 |
2018 | Directorate of Power Reactor Regulation | 44 | 32 | 11 | 8 | 6 | 0 | 0 | 75 | 13 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 33 | 34 | 16 | 10 | 7 | 0 | 0 | 68 | 16 | 160146 |
2018 | Canadian Nuclear Safety Commission | 43 | 37 | 11 | 7 | 2 | 0 | 0 | 80 | 9 | 715 |
2018 | Regulatory Operations Branch | 38 | 37 | 14 | 9 | 2 | 0 | 0 | 74 | 12 | 212 |
2018 | Directorate of Power Reactor Regulation | 41 | 36 | 8 | 10 | 6 | 0 | 0 | 77 | 16 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 31 | 25 | 19 | 12 | 9 | 3 | 0 | 59 | 22 | 161050 |
2018 | Canadian Nuclear Safety Commission | 38 | 26 | 17 | 11 | 6 | 2 | 0 | 66 | 17 | 722 |
2018 | Regulatory Operations Branch | 37 | 23 | 20 | 12 | 6 | 2 | 0 | 62 | 18 | 215 |
2018 | Directorate of Power Reactor Regulation | 36 | 23 | 24 | 8 | 8 | 2 | 0 | 60 | 16 | 52 |
Leadership
Immediate supervisor
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 45 | 30 | 12 | 7 | 5 | 2 | 1 | 76 | 12 | 160474 |
2018 | Canadian Nuclear Safety Commission | 49 | 28 | 10 | 6 | 3 | 3 | 1 | 80 | 10 | 718 |
2018 | Regulatory Operations Branch | 47 | 28 | 10 | 7 | 3 | 4 | 1 | 79 | 10 | 214 |
2018 | Directorate of Power Reactor Regulation | 49 | 34 | 6 | 4 | 2 | 1 | 3 | 88 | 6 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 42 | 32 | 11 | 8 | 5 | 1 | 0 | 75 | 14 | 160177 |
2018 | Canadian Nuclear Safety Commission | 47 | 32 | 10 | 6 | 4 | 1 | 1 | 80 | 9 | 718 |
2018 | Regulatory Operations Branch | 45 | 32 | 11 | 8 | 2 | 2 | 1 | 79 | 10 | 215 |
2018 | Directorate of Power Reactor Regulation | 45 | 35 | 8 | 6 | 2 | 5 | 0 | 84 | 8 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 47 | 28 | 11 | 7 | 6 | 0 | 0 | 75 | 13 | 160605 |
2018 | Canadian Nuclear Safety Commission | 50 | 28 | 9 | 7 | 5 | 1 | 0 | 79 | 12 | 719 |
2018 | Regulatory Operations Branch | 49 | 31 | 8 | 6 | 5 | 1 | 0 | 81 | 11 | 215 |
2018 | Directorate of Power Reactor Regulation | 55 | 31 | 6 | 4 | 4 | 0 | 0 | 86 | 8 | 52 |
Senior management
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 28 | 31 | 17 | 9 | 8 | 6 | 0 | 63 | 19 | 161481 |
2018 | Canadian Nuclear Safety Commission | 31 | 36 | 15 | 12 | 4 | 3 | 0 | 68 | 16 | 724 |
2018 | Regulatory Operations Branch | 27 | 40 | 12 | 13 | 4 | 3 | 0 | 69 | 18 | 217 |
2018 | Directorate of Power Reactor Regulation | 29 | 32 | 11 | 13 | 10 | 5 | 0 | 65 | 24 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 25 | 31 | 18 | 13 | 11 | 2 | 0 | 58 | 24 | 161089 |
2018 | Canadian Nuclear Safety Commission | 30 | 36 | 16 | 12 | 5 | 1 | 0 | 67 | 18 | 723 |
2018 | Regulatory Operations Branch | 28 | 36 | 15 | 15 | 6 | 0 | 0 | 64 | 22 | 217 |
2018 | Directorate of Power Reactor Regulation | 34 | 32 | 15 | 10 | 10 | 0 | 0 | 66 | 19 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 17 | 29 | 21 | 16 | 12 | 5 | 0 | 48 | 30 | 160960 |
2018 | Canadian Nuclear Safety Commission | 21 | 36 | 20 | 15 | 5 | 3 | 0 | 59 | 21 | 721 |
2018 | Regulatory Operations Branch | 16 | 35 | 23 | 17 | 8 | 1 | 0 | 52 | 25 | 215 |
2018 | Directorate of Power Reactor Regulation | 20 | 30 | 19 | 19 | 10 | 2 | 0 | 51 | 30 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 16 | 30 | 18 | 18 | 14 | 3 | 0 | 48 | 33 | 161278 |
2018 | Canadian Nuclear Safety Commission | 24 | 36 | 18 | 13 | 7 | 2 | 0 | 61 | 20 | 726 |
2018 | Regulatory Operations Branch | 14 | 38 | 20 | 19 | 8 | 1 | 0 | 53 | 27 | 217 |
2018 | Directorate of Power Reactor Regulation | 17 | 25 | 34 | 12 | 12 | 0 | 0 | 43 | 23 | 53 |
Workforce
Performance management
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 26 | 34 | 17 | 13 | 10 | 0 | 0 | 60 | 23 | 161141 |
2018 | Canadian Nuclear Safety Commission | 31 | 32 | 16 | 11 | 9 | 0 | 0 | 64 | 20 | 721 |
2018 | Regulatory Operations Branch | 23 | 37 | 17 | 13 | 10 | 0 | 0 | 61 | 23 | 214 |
2018 | Directorate of Power Reactor Regulation | 30 | 36 | 16 | 12 | 6 | 0 | 0 | 67 | 17 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 29 | 41 | 13 | 11 | 5 | 0 | 0 | 71 | 16 | 161312 |
2018 | Canadian Nuclear Safety Commission | 36 | 39 | 13 | 8 | 4 | 0 | 0 | 75 | 12 | 724 |
2018 | Regulatory Operations Branch | 29 | 45 | 12 | 10 | 4 | 0 | 0 | 75 | 14 | 216 |
2018 | Directorate of Power Reactor Regulation | 35 | 37 | 11 | 15 | 2 | 0 | 0 | 72 | 17 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 13 | 22 | 19 | 16 | 14 | 13 | 2 | 41 | 36 | 160747 |
2018 | Canadian Nuclear Safety Commission | 12 | 24 | 21 | 17 | 13 | 12 | 2 | 41 | 35 | 719 |
2018 | Regulatory Operations Branch | 7 | 21 | 20 | 21 | 16 | 12 | 2 | 33 | 43 | 215 |
2018 | Directorate of Power Reactor Regulation | 3 | 25 | 16 | 21 | 16 | 17 | 2 | 35 | 45 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 37 | 35 | 12 | 9 | 6 | 1 | 0 | 73 | 15 | 160726 |
2018 | Canadian Nuclear Safety Commission | 41 | 36 | 11 | 6 | 5 | 1 | 0 | 78 | 11 | 719 |
2018 | Regulatory Operations Branch | 39 | 36 | 10 | 8 | 5 | 2 | 0 | 76 | 13 | 215 |
2018 | Directorate of Power Reactor Regulation | 40 | 47 | 3 | 4 | 6 | 0 | 0 | 87 | 10 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 25 | 34 | 16 | 10 | 6 | 3 | 6 | 65 | 18 | 36684 |
2018 | Canadian Nuclear Safety Commission | 38 | 40 | 5 | 6 | 6 | 1 | 4 | 82 | 13 | 107 |
2018 | Regulatory Operations Branch | 22 | 51 | 13 | 9 | 5 | 0 | 0 | 74 | 14 | 23 |
Job fit and development
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 25 | 45 | 10 | 14 | 6 | 0 | 1 | 70 | 20 | 161510 |
2018 | Canadian Nuclear Safety Commission | 40 | 42 | 8 | 7 | 3 | 0 | 0 | 82 | 10 | 723 |
2018 | Regulatory Operations Branch | 28 | 50 | 8 | 9 | 3 | 0 | 0 | 79 | 13 | 216 |
2018 | Directorate of Power Reactor Regulation | 20 | 51 | 14 | 9 | 4 | 2 | 0 | 72 | 13 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 40 | 39 | 11 | 6 | 3 | 0 | 0 | 80 | 10 | 161032 |
2018 | Canadian Nuclear Safety Commission | 50 | 37 | 7 | 5 | 2 | 0 | 0 | 86 | 7 | 721 |
2018 | Regulatory Operations Branch | 42 | 43 | 7 | 6 | 3 | 0 | 0 | 85 | 8 | 215 |
2018 | Directorate of Power Reactor Regulation | 34 | 51 | 6 | 4 | 6 | 0 | 0 | 85 | 10 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 45 | 38 | 8 | 6 | 3 | 0 | 0 | 84 | 9 | 160117 |
2018 | Canadian Nuclear Safety Commission | 54 | 34 | 5 | 5 | 2 | 0 | 0 | 88 | 7 | 720 |
2018 | Regulatory Operations Branch | 43 | 45 | 4 | 7 | 2 | 0 | 0 | 87 | 8 | 215 |
2018 | Directorate of Power Reactor Regulation | 39 | 52 | 2 | 4 | 4 | 0 | 0 | 90 | 8 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 20 | 32 | 18 | 15 | 12 | 2 | 0 | 53 | 28 | 161004 |
2018 | Canadian Nuclear Safety Commission | 32 | 35 | 14 | 13 | 6 | 1 | 0 | 67 | 19 | 722 |
2018 | Regulatory Operations Branch | 23 | 37 | 15 | 16 | 10 | 0 | 0 | 60 | 26 | 216 |
2018 | Directorate of Power Reactor Regulation | 24 | 39 | 13 | 8 | 17 | 0 | 0 | 62 | 25 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 19 | 27 | 16 | 16 | 18 | 2 | 2 | 48 | 35 | 161071 |
2018 | Canadian Nuclear Safety Commission | 20 | 27 | 15 | 18 | 17 | 2 | 1 | 48 | 36 | 722 |
2018 | Regulatory Operations Branch | 16 | 24 | 18 | 23 | 18 | 1 | 0 | 40 | 42 | 215 |
2018 | Directorate of Power Reactor Regulation | 20 | 23 | 23 | 19 | 15 | 0 | 0 | 43 | 34 | 52 |
Empowerment
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 27 | 38 | 14 | 12 | 9 | 0 | 0 | 65 | 21 | 160686 |
2018 | Canadian Nuclear Safety Commission | 35 | 40 | 11 | 9 | 4 | 0 | 0 | 76 | 13 | 719 |
2018 | Regulatory Operations Branch | 30 | 44 | 13 | 8 | 4 | 0 | 0 | 74 | 12 | 215 |
2018 | Directorate of Power Reactor Regulation | 37 | 44 | 7 | 6 | 6 | 0 | 0 | 81 | 12 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 31 | 34 | 16 | 10 | 8 | 0 | 0 | 66 | 18 | 160340 |
2018 | Canadian Nuclear Safety Commission | 41 | 31 | 14 | 9 | 4 | 0 | 0 | 73 | 14 | 720 |
2018 | Regulatory Operations Branch | 30 | 41 | 14 | 10 | 5 | 0 | 0 | 71 | 15 | 215 |
2018 | Directorate of Power Reactor Regulation | 29 | 39 | 13 | 11 | 8 | 0 | 0 | 68 | 19 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 30 | 37 | 15 | 11 | 7 | 0 | 0 | 67 | 18 | 160685 |
2018 | Canadian Nuclear Safety Commission | 37 | 38 | 12 | 9 | 3 | 0 | 0 | 75 | 12 | 718 |
2018 | Regulatory Operations Branch | 27 | 45 | 14 | 11 | 3 | 0 | 1 | 72 | 14 | 214 |
2018 | Directorate of Power Reactor Regulation | 34 | 33 | 25 | 4 | 4 | 0 | 0 | 67 | 8 | 51 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 20 | 35 | 22 | 11 | 8 | 3 | 0 | 57 | 20 | 161226 |
2018 | Canadian Nuclear Safety Commission | 28 | 37 | 20 | 9 | 4 | 1 | 0 | 66 | 14 | 721 |
2018 | Regulatory Operations Branch | 21 | 41 | 22 | 10 | 5 | 0 | 0 | 63 | 15 | 213 |
2018 | Directorate of Power Reactor Regulation | 24 | 44 | 14 | 8 | 8 | 2 | 0 | 70 | 16 | 51 |
Work-life balance and workload
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 42 | 33 | 11 | 8 | 5 | 0 | 0 | 76 | 13 | 161141 |
2018 | Canadian Nuclear Safety Commission | 56 | 28 | 8 | 5 | 2 | 0 | 0 | 85 | 7 | 723 |
2018 | Regulatory Operations Branch | 55 | 28 | 8 | 6 | 3 | 0 | 1 | 84 | 9 | 215 |
2018 | Directorate of Power Reactor Regulation | 54 | 24 | 9 | 7 | 2 | 0 | 3 | 81 | 10 | 53 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 37 | 32 | 17 | 8 | 5 | 0 | 1 | 70 | 13 | 161699 |
2018 | Canadian Nuclear Safety Commission | 32 | 37 | 18 | 9 | 4 | 0 | 0 | 69 | 12 | 724 |
2018 | Regulatory Operations Branch | 31 | 40 | 16 | 8 | 4 | 0 | 0 | 71 | 12 | 215 |
2018 | Directorate of Power Reactor Regulation | 28 | 38 | 19 | 9 | 6 | 0 | 0 | 66 | 15 | 52 |
Mobility and retention
Survey year | Organization | Yes (%) |
No (%) |
Not Sure (%) |
Total responses |
---|---|---|---|---|---|
2018 | Public Service | 27 | 39 | 35 | 161647 |
2018 | Canadian Nuclear Safety Commission | 23 | 41 | 36 | 726 |
2018 | Regulatory Operations Branch | 21 | 50 | 29 | 217 |
2018 | Directorate of Power Reactor Regulation | 17 | 61 | 22 | 53 |
Survey year | Organization | To retire (%) |
To pursue another position within my department or agency (%) |
To pursue a position in another department or agency (%) |
To pursue a position outside the federal public service (%) |
End of my term, casual or student employment (%) |
Other (%) |
Total responses |
---|---|---|---|---|---|---|---|---|
2018 | Public Service | 17 | 33 | 30 | 6 | 8 | 6 | 43390 |
2018 | Canadian Nuclear Safety Commission | 17 | 28 | 36 | 3 | 13 | 3 | 163 |
2018 | Regulatory Operations Branch | 18 | 38 | 22 | 7 | 10 | 7 | 44 |
Workplace
Organizational goals
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 43 | 40 | 9 | 5 | 2 | 0 | 0 | 84 | 7 | 161313 |
2018 | Canadian Nuclear Safety Commission | 56 | 32 | 8 | 3 | 1 | 0 | 0 | 88 | 4 | 723 |
2018 | Regulatory Operations Branch | 56 | 30 | 11 | 1 | 1 | 0 | 0 | 87 | 2 | 215 |
2018 | Directorate of Power Reactor Regulation | 55 | 34 | 9 | 0 | 2 | 0 | 0 | 89 | 2 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 24 | 42 | 18 | 10 | 5 | 1 | 0 | 67 | 15 | 161017 |
2018 | Canadian Nuclear Safety Commission | 42 | 40 | 13 | 4 | 1 | 0 | 0 | 82 | 5 | 717 |
2018 | Regulatory Operations Branch | 35 | 46 | 14 | 2 | 2 | 0 | 0 | 82 | 4 | 213 |
2018 | Directorate of Power Reactor Regulation | 29 | 50 | 13 | 4 | 4 | 0 | 0 | 79 | 8 | 52 |
Organizational performance
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 11 | 26 | 35 | 18 | 8 | 1 | 1 | 27 | 37 | 161147 |
2018 | Canadian Nuclear Safety Commission | 5 | 24 | 36 | 24 | 10 | 0 | 1 | 34 | 29 | 720 |
2018 | Regulatory Operations Branch | 5 | 26 | 35 | 24 | 9 | 0 | 0 | 33 | 31 | 215 |
2018 | Directorate of Power Reactor Regulation | 9 | 28 | 31 | 29 | 4 | 0 | 0 | 32 | 37 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 12 | 20 | 28 | 23 | 13 | 2 | 2 | 37 | 33 | 160571 |
2018 | Canadian Nuclear Safety Commission | 4 | 12 | 24 | 36 | 21 | 1 | 1 | 58 | 17 | 716 |
2018 | Regulatory Operations Branch | 4 | 17 | 28 | 33 | 18 | 0 | 0 | 51 | 21 | 214 |
2018 | Directorate of Power Reactor Regulation | 5 | 17 | 21 | 40 | 16 | 0 | 0 | 56 | 22 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 17 | 24 | 29 | 17 | 9 | 2 | 3 | 26 | 43 | 160643 |
2018 | Canadian Nuclear Safety Commission | 12 | 24 | 34 | 19 | 9 | 2 | 1 | 29 | 36 | 714 |
2018 | Regulatory Operations Branch | 12 | 27 | 35 | 19 | 6 | 0 | 0 | 25 | 40 | 215 |
2018 | Directorate of Power Reactor Regulation | 7 | 23 | 35 | 27 | 5 | 0 | 2 | 33 | 31 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 8 | 16 | 32 | 27 | 14 | 1 | 2 | 42 | 25 | 160266 |
2018 | Canadian Nuclear Safety Commission | 5 | 9 | 35 | 35 | 14 | 1 | 2 | 51 | 14 | 717 |
2018 | Regulatory Operations Branch | 3 | 9 | 34 | 40 | 14 | 0 | 1 | 54 | 12 | 214 |
2018 | Directorate of Power Reactor Regulation | 4 | 7 | 40 | 34 | 13 | 0 | 2 | 48 | 11 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 17 | 23 | 27 | 18 | 11 | 1 | 2 | 30 | 42 | 160843 |
2018 | Canadian Nuclear Safety Commission | 10 | 20 | 31 | 23 | 13 | 1 | 2 | 38 | 31 | 719 |
2018 | Regulatory Operations Branch | 11 | 19 | 34 | 26 | 9 | 0 | 1 | 35 | 30 | 215 |
2018 | Directorate of Power Reactor Regulation | 17 | 25 | 28 | 26 | 4 | 0 | 0 | 30 | 42 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 13 | 20 | 27 | 22 | 13 | 3 | 3 | 37 | 35 | 160300 |
2018 | Canadian Nuclear Safety Commission | 6 | 15 | 28 | 29 | 18 | 2 | 2 | 49 | 22 | 715 |
2018 | Regulatory Operations Branch | 6 | 19 | 26 | 31 | 17 | 1 | 1 | 49 | 25 | 214 |
2018 | Directorate of Power Reactor Regulation | 9 | 27 | 21 | 34 | 9 | 0 | 0 | 43 | 36 | 52 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 16 | 24 | 31 | 16 | 9 | 2 | 2 | 25 | 42 | 161001 |
2018 | Canadian Nuclear Safety Commission | 10 | 22 | 35 | 20 | 10 | 2 | 1 | 31 | 33 | 720 |
2018 | Regulatory Operations Branch | 12 | 27 | 35 | 19 | 6 | 1 | 0 | 26 | 39 | 215 |
2018 | Directorate of Power Reactor Regulation | 18 | 28 | 39 | 12 | 0 | 3 | 0 | 12 | 47 | 52 |
Respectful workplace
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 40 | 31 | 10 | 10 | 8 | 1 | 0 | 72 | 18 | 160757 |
2018 | Canadian Nuclear Safety Commission | 40 | 31 | 9 | 13 | 7 | 0 | 0 | 71 | 19 | 722 |
2018 | Regulatory Operations Branch | 36 | 36 | 8 | 14 | 6 | 1 | 0 | 72 | 19 | 215 |
2018 | Directorate of Power Reactor Regulation | 42 | 38 | 9 | 2 | 6 | 2 | 0 | 82 | 8 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 44 | 36 | 9 | 7 | 4 | 0 | 0 | 81 | 11 | 160773 |
2018 | Canadian Nuclear Safety Commission | 46 | 36 | 7 | 8 | 3 | 0 | 0 | 82 | 11 | 722 |
2018 | Regulatory Operations Branch | 38 | 44 | 6 | 7 | 5 | 0 | 0 | 82 | 12 | 216 |
2018 | Directorate of Power Reactor Regulation | 44 | 39 | 5 | 10 | 2 | 0 | 0 | 83 | 12 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 37 | 40 | 13 | 5 | 3 | 1 | 0 | 77 | 9 | 161015 |
2018 | Canadian Nuclear Safety Commission | 39 | 41 | 10 | 6 | 2 | 0 | 0 | 81 | 9 | 722 |
2018 | Regulatory Operations Branch | 30 | 48 | 11 | 7 | 3 | 0 | 0 | 78 | 11 | 215 |
2018 | Directorate of Power Reactor Regulation | 41 | 40 | 5 | 12 | 2 | 0 | 0 | 81 | 13 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 40 | 36 | 14 | 4 | 3 | 3 | 0 | 78 | 7 | 160822 |
2018 | Canadian Nuclear Safety Commission | 47 | 33 | 12 | 3 | 1 | 3 | 0 | 82 | 5 | 720 |
2018 | Regulatory Operations Branch | 49 | 30 | 14 | 4 | 1 | 2 | 0 | 80 | 6 | 215 |
2018 | Directorate of Power Reactor Regulation | 52 | 30 | 6 | 8 | 0 | 4 | 0 | 86 | 8 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 39 | 38 | 13 | 6 | 3 | 2 | 0 | 78 | 9 | 160801 |
2018 | Canadian Nuclear Safety Commission | 47 | 34 | 11 | 5 | 2 | 1 | 0 | 83 | 6 | 720 |
2018 | Regulatory Operations Branch | 46 | 34 | 12 | 5 | 2 | 0 | 0 | 81 | 7 | 213 |
2018 | Directorate of Power Reactor Regulation | 52 | 36 | 6 | 6 | 0 | 0 | 0 | 89 | 6 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 44 | 36 | 10 | 5 | 4 | 0 | 0 | 81 | 9 | 160659 |
2018 | Canadian Nuclear Safety Commission | 55 | 34 | 6 | 3 | 1 | 0 | 0 | 89 | 5 | 722 |
2018 | Regulatory Operations Branch | 51 | 36 | 6 | 5 | 1 | 0 | 0 | 87 | 7 | 216 |
2018 | Directorate of Power Reactor Regulation | 55 | 32 | 5 | 4 | 4 | 0 | 0 | 87 | 8 | 53 |
Ethical workplace
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 21 | 32 | 19 | 11 | 9 | 5 | 3 | 59 | 21 | 161064 |
2018 | Canadian Nuclear Safety Commission | 24 | 34 | 16 | 12 | 7 | 4 | 4 | 62 | 20 | 720 |
2018 | Regulatory Operations Branch | 20 | 37 | 17 | 11 | 7 | 6 | 3 | 62 | 20 | 214 |
2018 | Directorate of Power Reactor Regulation | 18 | 41 | 24 | 6 | 4 | 5 | 2 | 63 | 11 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 31 | 38 | 14 | 9 | 5 | 2 | 1 | 71 | 15 | 161068 |
2018 | Canadian Nuclear Safety Commission | 43 | 38 | 8 | 6 | 3 | 1 | 1 | 82 | 10 | 722 |
2018 | Regulatory Operations Branch | 42 | 39 | 10 | 7 | 2 | 0 | 0 | 81 | 9 | 215 |
2018 | Directorate of Power Reactor Regulation | 42 | 42 | 5 | 7 | 4 | 0 | 0 | 83 | 11 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 30 | 38 | 18 | 8 | 5 | 1 | 0 | 69 | 13 | 160645 |
2018 | Canadian Nuclear Safety Commission | 39 | 39 | 13 | 5 | 3 | 1 | 0 | 79 | 8 | 718 |
2018 | Regulatory Operations Branch | 34 | 45 | 13 | 5 | 3 | 0 | 0 | 79 | 8 | 213 |
2018 | Directorate of Power Reactor Regulation | 37 | 36 | 15 | 6 | 6 | 0 | 0 | 73 | 12 | 51 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 18 | 25 | 19 | 14 | 14 | 8 | 2 | 48 | 31 | 161057 |
2018 | Canadian Nuclear Safety Commission | 21 | 25 | 20 | 15 | 11 | 8 | 2 | 50 | 29 | 722 |
2018 | Regulatory Operations Branch | 17 | 28 | 20 | 16 | 12 | 6 | 1 | 48 | 30 | 214 |
2018 | Directorate of Power Reactor Regulation | 17 | 28 | 17 | 12 | 14 | 11 | 2 | 51 | 29 | 52 |
Harassment
Harassment is normally a series of incidents, but it can be one severe incident that has a lasting impact on the individual.
Harassment is any improper conduct by an individual that is directed at and offensive to another individual in the workplace, including at any event or any location related to work, and that the individual knew or ought reasonably to have known would cause offence or harm. It comprises objectionable act(s), comment(s) or display(s) that demean, belittle, or cause personal humiliation or embarrassment, and any act of intimidation or threat. It also includes harassment within the meaning of the Canadian Human Rights Act (i.e., based on race, national or ethnic origin, colour, religion, age, sex, sexual orientation, gender identity or expression, marital status, family status, genetic characteristics [including a requirement to undergo a genetic test, or disclose the results of a genetic test], disability or conviction for an offence for which a pardon has been granted or in respect of which a record suspension has been ordered).
Survey year | Organization | Yes (%) |
No (%) |
Total responses |
---|---|---|---|---|
2018 | Public Service | 15 | 85 | 161503 |
2018 | Canadian Nuclear Safety Commission | 13 | 87 | 724 |
2018 | Regulatory Operations Branch | 14 | 86 | 216 |
2018 | Directorate of Power Reactor Regulation | 15 | 85 | 53 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 51 | 22721 |
2018 | Canadian Nuclear Safety Commission | 49 | 95 |
2018 | Regulatory Operations Branch | 42 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 62 | 22735 |
2018 | Canadian Nuclear Safety Commission | 64 | 95 |
2018 | Regulatory Operations Branch | 62 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 8 | 22696 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 5 | 22696 |
2018 | Canadian Nuclear Safety Commission | 0 | 95 |
2018 | Regulatory Operations Branch | 0 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 6 | 22696 |
2018 | Regulatory Operations Branch | 0 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 22712 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 22694 |
2018 | Canadian Nuclear Safety Commission | 6 | 95 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 40 | 22709 |
2018 | Canadian Nuclear Safety Commission | 44 | 95 |
2018 | Regulatory Operations Branch | 32 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 40 | 22697 |
2018 | Canadian Nuclear Safety Commission | 40 | 95 |
2018 | Regulatory Operations Branch | 45 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 46 | 22698 |
2018 | Canadian Nuclear Safety Commission | 44 | 95 |
2018 | Regulatory Operations Branch | 42 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 41 | 22706 |
2018 | Canadian Nuclear Safety Commission | 42 | 95 |
2018 | Regulatory Operations Branch | 36 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 33 | 22690 |
2018 | Canadian Nuclear Safety Commission | 34 | 95 |
2018 | Regulatory Operations Branch | 42 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 56 | 22722 |
2018 | Canadian Nuclear Safety Commission | 60 | 95 |
2018 | Regulatory Operations Branch | 55 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 36 | 22699 |
2018 | Canadian Nuclear Safety Commission | 39 | 95 |
2018 | Regulatory Operations Branch | 38 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 2 | 22678 |
2018 | Canadian Nuclear Safety Commission | 0 | 95 |
2018 | Regulatory Operations Branch | 0 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 22693 |
2018 | Canadian Nuclear Safety Commission | 11 | 95 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 13 | 22689 |
2018 | Canadian Nuclear Safety Commission | 17 | 95 |
2018 | Regulatory Operations Branch | 23 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 48 | 22704 |
2018 | Canadian Nuclear Safety Commission | 47 | 95 |
2018 | Regulatory Operations Branch | 55 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 27 | 22702 |
2018 | Canadian Nuclear Safety Commission | 24 | 95 |
2018 | Regulatory Operations Branch | 29 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 15 | 22687 |
2018 | Canadian Nuclear Safety Commission | 11 | 95 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 51 | 22718 |
2018 | Canadian Nuclear Safety Commission | 54 | 94 |
2018 | Regulatory Operations Branch | 58 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 27 | 22701 |
2018 | Canadian Nuclear Safety Commission | 26 | 94 |
2018 | Regulatory Operations Branch | 29 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 8 | 22688 |
2018 | Canadian Nuclear Safety Commission | 13 | 94 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 20 | 22699 |
2018 | Canadian Nuclear Safety Commission | 20 | 94 |
2018 | Regulatory Operations Branch | 19 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 22689 |
2018 | Canadian Nuclear Safety Commission | 10 | 94 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 7 | 22692 |
2018 | Canadian Nuclear Safety Commission | 8 | 94 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 14 | 22692 |
2018 | Canadian Nuclear Safety Commission | 11 | 94 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 11 | 22688 |
2018 | Canadian Nuclear Safety Commission | 10 | 94 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 27 | 22709 |
2018 | Canadian Nuclear Safety Commission | 21 | 94 |
2018 | Regulatory Operations Branch | 16 | 31 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 11 | 21200 |
2018 | Canadian Nuclear Safety Commission | 12 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 19 | 21197 |
2018 | Canadian Nuclear Safety Commission | 15 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 21191 |
2018 | Canadian Nuclear Safety Commission | 8 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 7 | 21189 |
2018 | Canadian Nuclear Safety Commission | 8 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 21189 |
2018 | Canadian Nuclear Safety Commission | 10 | 88 |
2018 | Regulatory Operations Branch | 20 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 21189 |
2018 | Canadian Nuclear Safety Commission | 13 | 88 |
2018 | Regulatory Operations Branch | 20 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 10 | 21188 |
2018 | Canadian Nuclear Safety Commission | 8 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 11 | 21193 |
2018 | Canadian Nuclear Safety Commission | 7 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 12 | 21192 |
2018 | Canadian Nuclear Safety Commission | 11 | 88 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 30 | 21199 |
2018 | Canadian Nuclear Safety Commission | 34 | 88 |
2018 | Regulatory Operations Branch | 45 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 21189 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 47 | 21214 |
2018 | Canadian Nuclear Safety Commission | 54 | 88 |
2018 | Regulatory Operations Branch | 62 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 2 | 21187 |
2018 | Regulatory Operations Branch | 0 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 56 | 21220 |
2018 | Canadian Nuclear Safety Commission | 55 | 88 |
2018 | Regulatory Operations Branch | 49 | 29 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 21191 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 13 | 21192 |
2018 | Canadian Nuclear Safety Commission | 9 | 88 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 16 | 19 | 21 | 8 | 8 | 23 | 5 | 48 | 22 | 161102 |
2018 | Canadian Nuclear Safety Commission | 19 | 19 | 17 | 8 | 6 | 24 | 7 | 55 | 20 | 720 |
2018 | Regulatory Operations Branch | 16 | 23 | 20 | 9 | 7 | 20 | 5 | 52 | 21 | 216 |
2018 | Directorate of Power Reactor Regulation | 17 | 22 | 19 | 6 | 6 | 23 | 7 | 56 | 17 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 29 | 31 | 18 | 7 | 6 | 7 | 1 | 66 | 14 | 161060 |
2018 | Canadian Nuclear Safety Commission | 36 | 31 | 17 | 6 | 4 | 6 | 1 | 71 | 11 | 722 |
2018 | Regulatory Operations Branch | 30 | 36 | 20 | 6 | 5 | 3 | 0 | 68 | 11 | 215 |
2018 | Directorate of Power Reactor Regulation | 28 | 44 | 11 | 8 | 6 | 3 | 0 | 74 | 14 | 52 |
Discrimination
Discrimination means treating someone differently or unfairly because of a personal characteristic or distinction, which, whether intentional or not, has an effect that imposes disadvantages not imposed on others or that withholds or limits access that is given to others. There are 13 prohibited grounds of discrimination under the Canadian Human Rights Act (i.e., based on race, national or ethnic origin, colour, religion, age, sex, sexual orientation, gender identity or expression, marital status, family status, genetic characteristics [including a requirement to undergo a genetic test, or disclose the results of a genetic test], disability or conviction for an offence for which a pardon has been granted or in respect of which a record suspension has been ordered).
Survey year | Organization | Yes (%) |
No (%) |
Total responses |
---|---|---|---|---|
2018 | Public Service | 8 | 92 | 161188 |
2018 | Canadian Nuclear Safety Commission | 8 | 92 | 724 |
2018 | Regulatory Operations Branch | 11 | 89 | 217 |
2018 | Directorate of Power Reactor Regulation | 10 | 90 | 53 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 36 | 11806 |
2018 | Canadian Nuclear Safety Commission | 25 | 56 |
2018 | Regulatory Operations Branch | 20 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 77 | 11826 |
2018 | Canadian Nuclear Safety Commission | 91 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11797 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11797 |
2018 | Canadian Nuclear Safety Commission | 0 | 56 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 7 | 11798 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 11802 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 8 | 11798 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 25 | 11790 |
2018 | Canadian Nuclear Safety Commission | 15 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 20 | 11790 |
2018 | Canadian Nuclear Safety Commission | 17 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 15 | 11786 |
2018 | Canadian Nuclear Safety Commission | 13 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 6 | 11784 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 26 | 11787 |
2018 | Canadian Nuclear Safety Commission | 40 | 56 |
2018 | Regulatory Operations Branch | 45 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 29 | 11792 |
2018 | Canadian Nuclear Safety Commission | 29 | 56 |
2018 | Regulatory Operations Branch | 44 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11783 |
2018 | Canadian Nuclear Safety Commission | 0 | 56 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 2 | 11782 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 8 | 11785 |
2018 | Canadian Nuclear Safety Commission | 9 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 15 | 11787 |
2018 | Canadian Nuclear Safety Commission | 16 | 56 |
2018 | Regulatory Operations Branch | 21 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 1 | 11782 |
2018 | Canadian Nuclear Safety Commission | 0 | 56 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 17 | 11791 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 0 | 11783 |
2018 | Canadian Nuclear Safety Commission | 0 | 56 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 19 | 11797 |
2018 | Canadian Nuclear Safety Commission | 14 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 29 | 11822 |
2018 | Canadian Nuclear Safety Commission | 23 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 15 | 11810 |
2018 | Canadian Nuclear Safety Commission | 11 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 5 | 11809 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 17 | 11817 |
2018 | Canadian Nuclear Safety Commission | 11 | 56 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11805 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 6 | 11807 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 11806 |
2018 | Canadian Nuclear Safety Commission | 0 | 56 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 11808 |
2018 | Regulatory Operations Branch | 0 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 49 | 11821 |
2018 | Canadian Nuclear Safety Commission | 64 | 56 |
2018 | Regulatory Operations Branch | 71 | 25 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 5 | 11053 |
2018 | Canadian Nuclear Safety Commission | 0 | 54 |
2018 | Regulatory Operations Branch | 0 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 13 | 11052 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 3 | 11049 |
2018 | Canadian Nuclear Safety Commission | 0 | 54 |
2018 | Regulatory Operations Branch | 0 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 2 | 11050 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 3 | 11051 |
2018 | Canadian Nuclear Safety Commission | 0 | 54 |
2018 | Regulatory Operations Branch | 0 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11049 |
2018 | Canadian Nuclear Safety Commission | 12 | 54 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 7 | 11051 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 11 | 11053 |
2018 | Regulatory Operations Branch | 0 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 11 | 11055 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 27 | 11058 |
2018 | Canadian Nuclear Safety Commission | 22 | 54 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 9 | 11054 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 45 | 11069 |
2018 | Canadian Nuclear Safety Commission | 47 | 54 |
2018 | Regulatory Operations Branch | 41 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 2 | 11050 |
2018 | Canadian Nuclear Safety Commission | 0 | 54 |
2018 | Regulatory Operations Branch | 0 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 64 | 11072 |
2018 | Canadian Nuclear Safety Commission | 65 | 54 |
2018 | Regulatory Operations Branch | 59 | 24 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 4 | 11051 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 13 | 11050 |
2018 | Canadian Nuclear Safety Commission | 9 | 54 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 18 | 18 | 24 | 4 | 4 | 26 | 5 | 53 | 12 | 161075 |
2018 | Canadian Nuclear Safety Commission | 23 | 15 | 18 | 2 | 4 | 31 | 7 | 62 | 10 | 722 |
2018 | Regulatory Operations Branch | 20 | 17 | 20 | 4 | 4 | 29 | 7 | 57 | 12 | 216 |
2018 | Directorate of Power Reactor Regulation | 21 | 20 | 9 | 2 | 4 | 34 | 9 | 73 | 10 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 30 | 31 | 19 | 5 | 4 | 10 | 1 | 69 | 10 | 161053 |
2018 | Canadian Nuclear Safety Commission | 39 | 29 | 16 | 3 | 3 | 9 | 1 | 75 | 6 | 722 |
2018 | Regulatory Operations Branch | 35 | 31 | 20 | 4 | 4 | 6 | 0 | 71 | 8 | 217 |
2018 | Directorate of Power Reactor Regulation | 29 | 39 | 13 | 6 | 2 | 11 | 0 | 77 | 9 | 53 |
Workplace well-being
A psychologically healthy workplace
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 52 | 26 | 10 | 5 | 5 | 1 | 0 | 80 | 10 | 160320 |
2018 | Canadian Nuclear Safety Commission | 57 | 25 | 8 | 3 | 5 | 1 | 0 | 83 | 8 | 718 |
2018 | Regulatory Operations Branch | 55 | 27 | 10 | 3 | 5 | 1 | 0 | 83 | 8 | 214 |
2018 | Directorate of Power Reactor Regulation | 53 | 34 | 6 | 2 | 6 | 0 | 0 | 87 | 8 | 52 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 29 | 40 | 16 | 8 | 4 | 2 | 0 | 71 | 13 | 161108 |
2018 | Canadian Nuclear Safety Commission | 52 | 34 | 9 | 3 | 1 | 2 | 0 | 88 | 3 | 720 |
2018 | Regulatory Operations Branch | 42 | 39 | 13 | 4 | 1 | 0 | 0 | 81 | 6 | 217 |
2018 | Directorate of Power Reactor Regulation | 39 | 42 | 13 | 4 | 2 | 0 | 0 | 81 | 6 | 53 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 23 | 35 | 18 | 13 | 10 | 2 | 0 | 59 | 23 | 161341 |
2018 | Canadian Nuclear Safety Commission | 34 | 38 | 15 | 8 | 3 | 1 | 0 | 73 | 12 | 722 |
2018 | Regulatory Operations Branch | 27 | 38 | 19 | 10 | 5 | 0 | 0 | 66 | 14 | 216 |
2018 | Directorate of Power Reactor Regulation | 22 | 46 | 22 | 6 | 2 | 2 | 0 | 70 | 8 | 53 |
Work-related stress
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 21 | 24 | 22 | 14 | 18 | 0 | 1 | 46 | 32 | 161369 |
2018 | Canadian Nuclear Safety Commission | 45 | 30 | 14 | 5 | 4 | 0 | 1 | 76 | 9 | 722 |
2018 | Regulatory Operations Branch | 42 | 29 | 17 | 6 | 5 | 0 | 0 | 72 | 11 | 217 |
2018 | Directorate of Power Reactor Regulation | 36 | 30 | 15 | 11 | 8 | 0 | 0 | 66 | 19 | 53 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 18 | 27 | 28 | 16 | 11 | 0 | 1 | 45 | 27 | 161255 |
2018 | Canadian Nuclear Safety Commission | 18 | 28 | 28 | 16 | 9 | 0 | 1 | 46 | 25 | 722 |
2018 | Regulatory Operations Branch | 18 | 27 | 27 | 16 | 12 | 0 | 0 | 45 | 28 | 215 |
2018 | Directorate of Power Reactor Regulation | 26 | 17 | 24 | 19 | 14 | 0 | 0 | 44 | 33 | 51 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 25 | 29 | 24 | 13 | 8 | 0 | 2 | 55 | 21 | 160603 |
2018 | Canadian Nuclear Safety Commission | 28 | 33 | 24 | 9 | 5 | 0 | 2 | 62 | 14 | 722 |
2018 | Regulatory Operations Branch | 29 | 30 | 30 | 8 | 4 | 0 | 0 | 58 | 12 | 216 |
2018 | Directorate of Power Reactor Regulation | 31 | 23 | 36 | 5 | 4 | 0 | 0 | 54 | 9 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 20 | 23 | 23 | 17 | 15 | 1 | 1 | 44 | 32 | 160732 |
2018 | Canadian Nuclear Safety Commission | 24 | 28 | 21 | 15 | 10 | 1 | 1 | 53 | 25 | 720 |
2018 | Regulatory Operations Branch | 25 | 26 | 25 | 10 | 14 | 0 | 1 | 51 | 24 | 215 |
2018 | Directorate of Power Reactor Regulation | 19 | 22 | 27 | 13 | 19 | 0 | 0 | 41 | 32 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 46 | 23 | 13 | 6 | 4 | 0 | 6 | 75 | 11 | 160698 |
2018 | Canadian Nuclear Safety Commission | 45 | 28 | 16 | 6 | 3 | 0 | 2 | 75 | 9 | 717 |
2018 | Regulatory Operations Branch | 38 | 33 | 17 | 8 | 3 | 0 | 1 | 71 | 12 | 212 |
2018 | Directorate of Power Reactor Regulation | 36 | 34 | 16 | 9 | 6 | 0 | 0 | 69 | 15 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 30 | 27 | 21 | 11 | 9 | 0 | 1 | 58 | 20 | 161068 |
2018 | Canadian Nuclear Safety Commission | 35 | 30 | 19 | 9 | 6 | 0 | 1 | 65 | 16 | 723 |
2018 | Regulatory Operations Branch | 33 | 29 | 21 | 11 | 6 | 0 | 0 | 62 | 16 | 217 |
2018 | Directorate of Power Reactor Regulation | 37 | 29 | 18 | 9 | 7 | 0 | 0 | 66 | 16 | 53 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 25 | 33 | 23 | 10 | 6 | 1 | 1 | 59 | 17 | 160799 |
2018 | Canadian Nuclear Safety Commission | 28 | 33 | 24 | 9 | 3 | 0 | 1 | 63 | 13 | 715 |
2018 | Regulatory Operations Branch | 23 | 36 | 26 | 10 | 5 | 0 | 1 | 59 | 15 | 215 |
2018 | Directorate of Power Reactor Regulation | 29 | 41 | 17 | 10 | 4 | 0 | 0 | 69 | 14 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 21 | 31 | 25 | 14 | 8 | 1 | 1 | 53 | 22 | 160760 |
2018 | Canadian Nuclear Safety Commission | 25 | 35 | 25 | 9 | 5 | 0 | 1 | 61 | 14 | 715 |
2018 | Regulatory Operations Branch | 20 | 33 | 29 | 11 | 5 | 0 | 1 | 54 | 17 | 214 |
2018 | Directorate of Power Reactor Regulation | 17 | 36 | 30 | 12 | 6 | 0 | 0 | 53 | 18 | 51 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 27 | 31 | 22 | 12 | 7 | 0 | 1 | 59 | 19 | 160624 |
2018 | Canadian Nuclear Safety Commission | 29 | 31 | 22 | 12 | 5 | 0 | 1 | 61 | 17 | 720 |
2018 | Regulatory Operations Branch | 23 | 32 | 26 | 13 | 6 | 0 | 0 | 55 | 19 | 216 |
2018 | Directorate of Power Reactor Regulation | 26 | 32 | 24 | 9 | 10 | 0 | 0 | 58 | 19 | 53 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 27 | 31 | 22 | 12 | 7 | 0 | 1 | 59 | 18 | 160191 |
2018 | Canadian Nuclear Safety Commission | 31 | 32 | 22 | 10 | 2 | 0 | 1 | 64 | 13 | 714 |
2018 | Regulatory Operations Branch | 28 | 36 | 23 | 9 | 3 | 0 | 0 | 64 | 12 | 216 |
2018 | Directorate of Power Reactor Regulation | 24 | 43 | 24 | 8 | 0 | 0 | 1 | 68 | 8 | 53 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 50 | 25 | 13 | 6 | 4 | 0 | 2 | 76 | 10 | 160099 |
2018 | Canadian Nuclear Safety Commission | 59 | 25 | 8 | 5 | 2 | 0 | 1 | 85 | 7 | 717 |
2018 | Regulatory Operations Branch | 58 | 32 | 4 | 3 | 1 | 0 | 0 | 91 | 4 | 214 |
2018 | Directorate of Power Reactor Regulation | 62 | 28 | 6 | 2 | 2 | 0 | 0 | 90 | 4 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 67 | 16 | 7 | 3 | 3 | 1 | 5 | 87 | 6 | 160330 |
2018 | Canadian Nuclear Safety Commission | 74 | 16 | 5 | 1 | 1 | 0 | 4 | 93 | 2 | 715 |
2018 | Regulatory Operations Branch | 70 | 20 | 5 | 1 | 0 | 0 | 4 | 94 | 1 | 215 |
2018 | Directorate of Power Reactor Regulation | 77 | 17 | 2 | 0 | 0 | 0 | 4 | 98 | 0 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 67 | 14 | 7 | 4 | 4 | 1 | 3 | 84 | 9 | 160420 |
2018 | Canadian Nuclear Safety Commission | 70 | 14 | 6 | 3 | 4 | 1 | 2 | 86 | 7 | 714 |
2018 | Regulatory Operations Branch | 70 | 13 | 9 | 3 | 4 | 0 | 1 | 83 | 7 | 214 |
2018 | Directorate of Power Reactor Regulation | 75 | 11 | 8 | 2 | 4 | 0 | 0 | 86 | 6 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 52 | 27 | 11 | 4 | 3 | 0 | 1 | 81 | 7 | 160968 |
2018 | Canadian Nuclear Safety Commission | 48 | 31 | 13 | 5 | 2 | 0 | 1 | 80 | 7 | 722 |
2018 | Regulatory Operations Branch | 42 | 35 | 15 | 5 | 3 | 0 | 0 | 77 | 8 | 217 |
2018 | Directorate of Power Reactor Regulation | 41 | 38 | 13 | 6 | 2 | 0 | 0 | 79 | 8 | 53 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 53 | 22 | 11 | 6 | 6 | 0 | 1 | 76 | 12 | 160500 |
2018 | Canadian Nuclear Safety Commission | 53 | 23 | 12 | 6 | 5 | 0 | 1 | 77 | 11 | 720 |
2018 | Regulatory Operations Branch | 48 | 27 | 12 | 8 | 5 | 1 | 0 | 75 | 13 | 216 |
2018 | Directorate of Power Reactor Regulation | 42 | 39 | 11 | 4 | 4 | 0 | 0 | 81 | 8 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 52 | 13 | 6 | 2 | 1 | 0 | 26 | 88 | 4 | 159765 |
2018 | Canadian Nuclear Safety Commission | 51 | 12 | 5 | 2 | 1 | 0 | 29 | 89 | 4 | 722 |
2018 | Regulatory Operations Branch | 45 | 11 | 7 | 1 | 1 | 0 | 35 | 86 | 3 | 216 |
2018 | Directorate of Power Reactor Regulation | 42 | 8 | 11 | 2 | 0 | 0 | 38 | 80 | 3 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 61 | 20 | 9 | 3 | 2 | 0 | 6 | 86 | 4 | 160250 |
2018 | Canadian Nuclear Safety Commission | 66 | 19 | 6 | 1 | 0 | 0 | 7 | 92 | 1 | 719 |
2018 | Regulatory Operations Branch | 63 | 20 | 9 | 1 | 0 | 0 | 6 | 89 | 2 | 215 |
2018 | Directorate of Power Reactor Regulation | 60 | 23 | 8 | 2 | 0 | 0 | 8 | 89 | 2 | 51 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 64 | 15 | 7 | 4 | 5 | 0 | 4 | 83 | 10 | 160852 |
2018 | Canadian Nuclear Safety Commission | 69 | 14 | 7 | 3 | 4 | 0 | 2 | 86 | 7 | 721 |
2018 | Regulatory Operations Branch | 71 | 13 | 9 | 2 | 4 | 0 | 2 | 85 | 6 | 216 |
2018 | Directorate of Power Reactor Regulation | 87 | 5 | 2 | 2 | 0 | 0 | 4 | 96 | 2 | 52 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 48 | 29 | 14 | 4 | 2 | 0 | 2 | 79 | 7 | 160646 |
2018 | Canadian Nuclear Safety Commission | 51 | 31 | 11 | 3 | 2 | 0 | 2 | 84 | 5 | 721 |
2018 | Regulatory Operations Branch | 46 | 38 | 9 | 3 | 2 | 0 | 1 | 85 | 6 | 216 |
2018 | Directorate of Power Reactor Regulation | 48 | 41 | 4 | 5 | 0 | 0 | 2 | 91 | 5 | 52 |
Survey year | Organization | Very low (%) |
Low (%) |
Moderate (%) |
High (%) |
Very high (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 13 | 31 | 36 | 14 | 5 | 0 | 0 | 45 | 19 | 161633 |
2018 | Canadian Nuclear Safety Commission | 15 | 36 | 33 | 11 | 3 | 1 | 0 | 52 | 14 | 724 |
2018 | Regulatory Operations Branch | 14 | 37 | 32 | 12 | 5 | 0 | 0 | 51 | 17 | 217 |
2018 | Directorate of Power Reactor Regulation | 22 | 30 | 34 | 11 | 4 | 0 | 0 | 52 | 15 | 53 |
Survey year | Organization | Always/ Almost always (%) |
Often (%) |
Sometimes (%) |
Rarely (%) |
Never/ Almost never (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 10 | 20 | 38 | 22 | 10 | 0 | 0 | 32 | 30 | 159815 |
2018 | Canadian Nuclear Safety Commission | 7 | 16 | 42 | 25 | 10 | 0 | 0 | 35 | 23 | 718 |
2018 | Regulatory Operations Branch | 9 | 19 | 39 | 25 | 8 | 0 | 0 | 33 | 28 | 216 |
2018 | Directorate of Power Reactor Regulation | 9 | 17 | 42 | 18 | 13 | 0 | 0 | 31 | 27 | 53 |
Compensation
Pay or other compensation issues
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 29 | 26 | 20 | 11 | 11 | 2 | 1 | 30 | 70 | 161576 |
2018 | Canadian Nuclear Safety Commission | 55 | 26 | 9 | 3 | 3 | 3 | 1 | 57 | 43 | 724 |
2018 | Regulatory Operations Branch | 50 | 28 | 13 | 4 | 2 | 2 | 0 | 52 | 48 | 217 |
2018 | Directorate of Power Reactor Regulation | 36 | 41 | 15 | 2 | 6 | 0 | 0 | 36 | 64 | 53 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 23 | 109172 |
2018 | Canadian Nuclear Safety Commission | 17 | 298 |
2018 | Regulatory Operations Branch | 14 | 102 |
2018 | Directorate of Power Reactor Regulation | 18 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 35 | 109188 |
2018 | Canadian Nuclear Safety Commission | 21 | 298 |
2018 | Regulatory Operations Branch | 20 | 102 |
2018 | Directorate of Power Reactor Regulation | 9 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 23 | 109138 |
2018 | Canadian Nuclear Safety Commission | 17 | 298 |
2018 | Regulatory Operations Branch | 19 | 102 |
2018 | Directorate of Power Reactor Regulation | 15 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 44 | 109210 |
2018 | Canadian Nuclear Safety Commission | 34 | 298 |
2018 | Regulatory Operations Branch | 38 | 102 |
2018 | Directorate of Power Reactor Regulation | 48 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 7 | 109103 |
2018 | Canadian Nuclear Safety Commission | 2 | 298 |
2018 | Regulatory Operations Branch | 3 | 102 |
2018 | Directorate of Power Reactor Regulation | 0 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 33 | 109160 |
2018 | Canadian Nuclear Safety Commission | 26 | 298 |
2018 | Regulatory Operations Branch | 24 | 102 |
2018 | Directorate of Power Reactor Regulation | 12 | 33 |
Survey year | Organization | (%) |
Total responses |
---|---|---|---|
2018 | Public Service | 34 | 109157 |
2018 | Canadian Nuclear Safety Commission | 33 | 298 |
2018 | Regulatory Operations Branch | 30 | 102 |
2018 | Directorate of Power Reactor Regulation | 41 | 33 |
Survey year | Organization | 0 hours (%) |
1 to 9 hours (%) |
10 to 19 hours (%) |
20 to 29 hours (%) |
30 to 39 hours (%) |
40 hours or more (%) |
Total responses |
---|---|---|---|---|---|---|---|---|
2018 | Public Service | 6 | 41 | 19 | 11 | 5 | 19 | 104045 |
2018 | Canadian Nuclear Safety Commission | 11 | 59 | 16 | 5 | 2 | 8 | 285 |
2018 | Regulatory Operations Branch | 12 | 47 | 22 | 7 | 2 | 10 | 97 |
2018 | Directorate of Power Reactor Regulation | 6 | 48 | 27 | 6 | 0 | 12 | 32 |
Survey year | Organization | Yes (%) |
No (%) |
Total responses |
---|---|---|---|---|
2018 | Public Service | 35 | 65 | 108456 |
2018 | Canadian Nuclear Safety Commission | 74 | 26 | 298 |
2018 | Regulatory Operations Branch | 80 | 20 | 102 |
2018 | Directorate of Power Reactor Regulation | 82 | 18 | 33 |
Survey year | Organization | Not at all (%) |
To a small extent (%) |
To a moderate extent (%) |
To a large extent (%) |
To a very large extent (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 42 | 16 | 13 | 9 | 11 | 1 | 8 | 63 | 22 | 161026 |
2018 | Canadian Nuclear Safety Commission | 60 | 11 | 6 | 5 | 5 | 2 | 11 | 81 | 11 | 722 |
2018 | Regulatory Operations Branch | 59 | 14 | 6 | 6 | 2 | 2 | 12 | 84 | 9 | 215 |
2018 | Directorate of Power Reactor Regulation | 66 | 12 | 5 | 4 | 2 | 0 | 11 | 87 | 6 | 53 |
Support to resolve pay or other compensation issues
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 11 | 22 | 18 | 18 | 23 | 2 | 6 | 36 | 44 | 108900 |
2018 | Canadian Nuclear Safety Commission | 36 | 31 | 12 | 11 | 4 | 0 | 6 | 72 | 16 | 296 |
2018 | Regulatory Operations Branch | 26 | 33 | 15 | 16 | 3 | 1 | 7 | 64 | 20 | 102 |
2018 | Directorate of Power Reactor Regulation | 26 | 29 | 9 | 23 | 6 | 0 | 6 | 59 | 31 | 33 |
Survey year | Organization | Strongly agree (%) |
Somewhat agree (%) |
Neither agree nor disagree (%) |
Somewhat disagree (%) |
Strongly disagree (%) |
Don't know (%) |
Not applicable (%) |
Positive answers (%) |
Negative answers (%) |
Total responses |
---|---|---|---|---|---|---|---|---|---|---|---|
2018 | Public Service | 5 | 13 | 16 | 19 | 39 | 2 | 7 | 19 | 63 | 108928 |
2018 | Canadian Nuclear Safety Commission | 14 | 15 | 13 | 5 | 10 | 4 | 38 | 52 | 26 | 297 |
2018 | Regulatory Operations Branch | 11 | 17 | 15 | 6 | 7 | 8 | 36 | 50 | 23 | 102 |
2018 | Directorate of Power Reactor Regulation | 14 | 15 | 9 | 9 | 9 | 6 | 38 | 52 | 32 | 33 |